• GC258LC-8 Hydraulic Crawler Excavator System 1
  • GC258LC-8 Hydraulic Crawler Excavator System 2
  • GC258LC-8 Hydraulic Crawler Excavator System 3
  • GC258LC-8 Hydraulic Crawler Excavator System 4
GC258LC-8 Hydraulic Crawler Excavator

GC258LC-8 Hydraulic Crawler Excavator

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
60 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

GC258LC-8 Hydraulic Crawler Excavator’s Operating Weight is 25.1t, equipped with CUMMINS 6BTAA5.9-C150 Engine, with Boom 5.85m, Arm 3.05m, Bucket 1.2m3.

GC258LC-8 Hydraulic Crawler Excavator

Technical Specifications

        Engine

    Travel System

Model

CUMMINS 6BTAA5.9-C150

Travel motors

DOOSAN, Korea; Variable axial piston motor

Type

Water cooling, turbocharged, empty enter-cooling

Support roller quantities

10

Carrier roller quantities

2×2

No. of cylinder

6

Travel shoes

51

Bore and stroke

102mm×120mm

Travel speed

3.6/5.5km/h

Displacement

5.9L

Drawbar pulling force

214kN

Power output

133kW/2000rpm

Grade ability

70% (35°)

Ground clearance

440mm

      Hydraulic System

      Cab Control

Pump

KAWASAKI, Japan

Cab

All-weather, sound-suppressed Cab and equipped with a heavy, insulated Floor Mat; Front Window can be opened and slid; 6-direction adjustable Seat; LED display, Automatic monitoring, display and warning; cool & hot Air Conditioner

Type

variable double–piston pump

Max. discharge flow

480L/min

Max. discharge pressure

Boom, arm and bucket

32.3MPa

Control

Two hand levers and two foot pedals for travel Two hand levers for excavating and swing;

Electric rotary-type engine throttle

Travel circuit

32.3MPa

Swing circuit

25.5MPa

Control circuit

3.5MPa

Boom, Arm Bucket

Pilot control pump

Gear type

Boom cylinder

130mm×90mm×1335mm

Main control valve

Negative flow control

Arm cylinder

140mm×100mm×1635mm

Oil cooler

Air cooled type

Bucket cylinder

130mm×90mm×1120mm

      Swing System

Refilling Capacitieslubrications

Swing motor

KAWASAKI, Japan

Fuel tank

400L

Swing motor type

Axial-piston motor

Cooling system

14L

Brake

Hydraulic oil released

Engine oil

20.5L

Parking brake

Hydraulic disc brake

Hydraulic oil tank

200L  Tank oil level

Swing speed

11.5r/min

254L  Hydraulic system

                           Bucket

Type

Backhoe bucket

    Bucket capacity

1.2m3 (SAE)

Bucket width

1278mm

Arm Type

A

Max. digging depth

10170mm

B

Max. dumping height

7150mm

C

Max. digging height

6912mm

D

Max. vertical digging depth

6020mm

E

Max. Depth cut for 2440m(8')Level Bottom

6668mm

F

Max. digging distance

10227mm

G

Max. digging radius at ground level

10048mm

H

Min. swing radius of work equipment

3276mm

Digging Force (ISO6015)        Unit: kN

Arm length

3050mm

Bucket digging force

167kN

Arm digging force

152kN

    Arm Type                                 3050mm

A

Overall length

10000mm

I

Tread

3845mm

B

Ground contact length (Transportation)

5387mm

J

Track length

4661mm

C

Overall height(to top of boom)

3130mm

K

Track gauge

2580mm

D

Overall width

3180mm

L

Track width

3180mm

E

Overall height(to top of cab)

2998mm

M

Shoe width

600mm

F

Counter weight ground clearance

1067mm

O

Bonnet height

2365mm

G

Ground clearance

440mm

P

Revolving frame width

2700mm

H

Tail swing radius

3040mm

Q

Distance from swivel center to tail

3010mm

             Operating Weight and Ground Pressure

Operating weight includes basic machine (with boom 5.85m, arm 3.05m, and bucket 1.2m3)

Shoe width

600mm

Overall width

3180mm

Ground pressure

49KPa

Operating weight

25100kg

Q:do you play Moon? Do you know how to do the easter egg? if youre really skilled at zombies and want to try the easter egg with me, then add me. quot;IbeWolfinquot; lt;-- thats my name. i got to 27 on moon so im kinda decent. also can anyone tell me how the big drill on the map works? i dont get it.
on Xbox?
Q:I have a Komatsu PC50 mini-excavator. My worker changed the diesel filter and now it won't start. He says the diesel isn't getting through so perhaps there are air pockets? How would I resolve this issue?
1. Loosen the fittings on the filter to purge air... 2. Lightly ether start engine... 3. Tighten fittings when leaking diesel fuel...
Q:I always wanted a quad since i was little. i got a job to get money then saved for a year until i moved into the middle of nowhere with lots of quad trails. I cant get a job because I am still to young to get a drivers license and i am in the middle of nowhere. I won a bet that my mom has to purchase me a quad over a year ago, and they wont get me one even though my dad just bought a $15,000 excavator last month! I already tried lots of chores, helping them out, getting good grades and they still wont give me one. I had a Chinese 50cc dirt bike until it died and I am very responsible, and my parents know that. We have a lot of money, so how do I convince them.
properly I ask my mom and dad for a quad while i replace into 13 and the pronounced no lol. I easily have been waited for an exceedingly long term and begged for one. For my 14th birthday my dad offered me a old airborne dirt and dirt bike for much less high priced and we fastened it up rode it for a on a similar time as Then solded it for heck of of a earnings. Then me and pa began to make a activity purchase finding out to purchase older motorcycles that prefer artwork and promoting them. They inspired me to try this and now im sixteen and have long previous by a minimum of 20 airborne dirt and dirt motorcycles and quads. and have gained a super form of money. So in basic terms tell them u prefer one for a interest and doubtless u can advance from it I meen if u comprehend plenty approximately them u can tell them u could make some stable money as a mechanic while ur older. stable thank you to discover your profession
Q:Dave's Nighttime Bonus Code for feb 29 country on 92.5?
Listen to the station. They should tell you what it is.
Q:i would like to use the zoomed excavator clay with some sand for my uromastyx
if you have turtles you are not supposed to give them sand. they will mistakenly eat it which can mess up their digestive system, cause them pain, and possibly death
Q:WHAT ARE SOME MEAN NICKNAMES?
Mean Nick Names
Q:What can i do to keep the neighbors dogs from digging under the fence! They don't care!?
Put up some edging. If that doesn't work, pour hot pepper powder all over the area (you will have to refresh it daily) My neighbor ( the genius that he was) thought he would build a dog run up against our fence for some really nasty dogs. They would try to dig under and it scared my kids. I used the hot pepper and it worked. I also stood there a couple of times and beaned them on the nose. He finally moved the dogs.
Q:How is the grade of excavator driver's license classification?
The card of excavator does not call driver's license, and is called operation card. Should be issued to the labor department or the agricultural machinery department, you should go to the issuing agency of the examination last year. Excavator operating permit is a special vehicle driver's license, can not drive the car.By the Ministry of labor or Safety Supervision Bureau approved the formal operation of the card (also known as the job card, also known as IC card), type of technical certificate and a variety of certification.I. training programs1 innings, IC card operation certificate: Electrician operation: installation, maintenance, on duty; metal welding: welding and cutting operation; the crane truck crane, gantry crane, elevator installation and maintenance; the enterprises in motor vehicle driving forklift trucks, forklifts, rollers, bulldozers, excavators the loader, etc.; the high erection operation: building construction, erection, maintenance, installation and other high altitude; the metal processing industry, milling, punching, pressing, sawing, lathe, planer driller2, the Ministry of labor professional qualification certificate: electrician, welder, mechanic, fitter, lathe worker, automobile maintenance workerTwo, registration requirementsOne inch photo ID and close scanningThree, charging standards1, the Safety Supervision Bureau issued the project: 400 yuan / Ben2, the Ministry of labor awarded the project: intermediate 600 yuanThe above fee includes medical examination fee and free training fee. Remark: the operation certificate of special industry (also called certificate of work is IC card)
Q:When do i pay contractors in building a house?Im building a new house and i am currently arranging to have the excavator contractor there to install septic and excavate for the foundation. Then im having the foundation contractor come in to do his job. I live in Nova Scotia if that makes any difference. im doing my own work after the foundation except plumbing and electrical. Should any of these guys be asking for money up front or part way through? Or do they finish then bill me with 30 days to pay? Whats the normal procedure? no mortgage.
You have a couple of viable answers Denise. You can pay for the materials (septic tank, gravel, concrete, etc.) up front and pay the contractor about 25% of what their bill for labor is, then pay them the remaining 75% after the inspections are completed, or you can pay 50 - 50 as indicated above. A word of caution: make sure the contractor has paid their subcontractors / suppliers when you pay them, otherwise you may be sued by the unpaid party. I'm a project manager in Michigan, so you should check out how this works there. Here we have to get a sworn statement and waiver of lien when we pay the contractor to ensure their subs have been paid. Good luck!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords