• Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll System 1
  • Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll System 2
  • Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll System 3
  • Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll System 4
  • Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll System 5
Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll

Wholesale High-Density Polyvinyl Chloride HDPE Geomembrane Waterproof Membrane Roll

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


HDPE Geomembrane

Thickness: 1.0mm to 3.0mm

Roll Size: 4m-9m in width

roll length as design or client’s request

 LDPE Geomembrane

Thickness: 0.1mm to 3.0mm     

Roll Size: 4m-9m in width

roll length as design or client’s request

LLDPE Geomembrane

Thickness: 0.5mm to 3.0mm 

Roll Size: 4m-9m in width

roll length as design or client’s request 

Features:

 

1.It can effectively make the concentrated stress diffuse, transfer or decompound, and prevent the soil mass against the destruction of outside force.

2.It can prevent the mixture of sandstone, soil mass and concrete of upper and lower layers.

3.Its mesh is hard to jam by virtue of the compliancy and motility of the reticulation formed by indefinite form fibrous tissue.



High-Density Polyvinyl Chloride Hdpe Geomembrane Waterproof Membrane Roll

Our Service

1.On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2. Strictly in accordance with the ISO9001-2008 international quality system standard,we monitor and manage the whole process throughout production,quality testing,and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer’s responsibility or irresistible natural disasters),we have refunding,replacement,and repair services.We will respond to customers’ feedbacks on quality issues within 24 hours.

After-sales service

1.In order to provide customers with comprehensive technical support,we will provide technical and other related information upon request in a timely manner.
2.In required,we will appoint specialized technicians to the construction site to give technical trainings to construction people,and offer technical guidance throughout the whole construction process.
3.For damage due to shipment and delivery,after we receive the complaint,we will check the issure through provided pictures and videos.If our responsibility is confirmed,we wil offer free replacement.
4.When the construction is completed,as your request,our technical staff may participate in the final acceptance.

FAQ:

Q: What kind of payments does jenor support?
A: T/T, L/C, Cash are accepted.
Q: Do you charge for the samples? 
A: Accordeing to our company policy, the samples are free, we only charge the freight fee. And we will return the freight fee during the next order. 
Q: Can you produce according to customers' design? 
A: Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q: Do you have other products?
A: Yes, please check the pictures:

 

 


Q: How do geomembranes contribute to reservoir lining?
Geomembranes contribute to reservoir lining by providing a strong and impermeable barrier that prevents water leakage. They help to maintain the water level and quality, reduce evaporation, and protect against contamination, ensuring the efficient storage and utilization of water resources.
Q: How do geomembranes prevent seepage in reservoirs?
Geomembranes prevent seepage in reservoirs by acting as a barrier between the water and the underlying soil. These impermeable liners are made of synthetic materials, such as high-density polyethylene (HDPE), which do not allow water to pass through them. By installing geomembranes along the reservoir floor and sides, they effectively prevent seepage and leakage, ensuring the water remains contained within the reservoir and minimizing the risk of water loss or contamination.
Q: How do geomembranes prevent water seepage in canal lining?
Geomembranes prevent water seepage in canal lining by acting as a barrier that prevents water from flowing through the canal walls. These impermeable liners are made from materials such as high-density polyethylene (HDPE) or polyvinyl chloride (PVC), which have low permeability and high resistance to water penetration. When installed properly, geomembranes create a watertight layer that blocks the movement of water, thus ensuring that the canal remains free from leaks and seepage.
Q: Which one is better, electric heating film and oil heater
Electric heating film is better because, the electric heating film is flexible heating, having wide heating area, and fast heat transfer.
Q: How much money is needed for a geotextile soil
1, an acre is 666.66 square meters, lotus root field impermeable geomembrane with 0.4mm can be used, the price per square meter GB 5.2, non-standard 4.6; 2, because the construction overlap, so at least 700 square meters, A total of 3220-3640 yuan; 3, I do not know where you are, because it is ex-factory price, but also considered freight. Hope to help you
Q: How to remove the heating film in the fish tank?
The heating rod should sink into the water completely with the part contains heating wire downward, otherwise the heating rod will be burned. Wires do not need to be put into the water. When it is ensured that the heating rod is completely sunk in water, it is better to put as less electric wires in the water as possible. After all, the electric wire that is wrapped by plastic will age faster when soaked in water.
Q: How do geomembranes provide water retention in rooftop gardens?
Geomembranes provide water retention in rooftop gardens by acting as a barrier that prevents water from escaping through the roof structure. These waterproof membranes are installed beneath the garden soil, effectively sealing off the rooftop and creating a closed system. By preventing water from seeping out, geomembranes help to retain moisture within the garden, ensuring that plants have a constant supply of water even during dry periods.
Q: How to weld imported geomembranes?
From experience, the following situations should be paid much attention to when you weld geomembranes. 1) When geomembranes should be welded into a concrete building but can't be placed directly, a connecting lock made from the same materials with membranes should be embedded into the building before the geomembranes. Then you can weld geomembranes by conventional method. 2) If there are pipelines to go through the membranes, you should check the size and number of pipelines and melt the HDPE membranes with the prefabricated pipe liners first to prevent seepage. 3) Followings are what I learned from the imported geomembrane melting training in Solmax. If the weather is bad or there is force majeure, the project of melting should be stopped for one day or more. At the same time processed HDPE geomembranes should be fixed by earthbags for damage protection.
Q: HDPE construction process of HDPE geomembrane
Clear substances that have hidden danger of puncture on bare base surface, completion and acceptance, etc. Acceptance of construction quality. ③Repair methods of damaged parts; welding form is double bead. 5. Recommendation 1, the maximum design water level. Ther is nooil pollution at joint. Planned duration is 3 days. Substances that can cause harm to anti-seepage film and constructors related to water proof materials. First, cut HDPE geomembrane into trumpet-shaped pipe sleeve according to the diameter of leachate in dam. 50×4m, do not wipe in hands. Bond is made up of asphalt latex paint, otherwise, set aside telescopic deformation caused by changes of temperature. ②Operating temperature of sweat soldering is 280 -300℃. ②Water resistance of bridge foundation. Weld after treatment. 4, Need latitudinal splicing so as not to damage the membrane surface. Dew: 5% to 8%.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords