Trp Geomembranes Black HDPE Plastic Sheet LDPE Geomembrane
- Loading Port:
- Qingdao
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 300000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Products Specification of Black Hdpe Plastic Sheet LDPE Geomembrane Suppliers
Item | Width(m) | Thickness(mm) |
LDPE geomembrane | 1-8 | 0.3-2.0 |
Physical Properties of Black Hdpe Plastic Sheet LDPE Geomembrane Suppliers
Item | LDPE Geomembrane-1 | LDPE Geomembrane-2 |
Tensile Strength(Mpa) | ≥17 | ≥25 |
Fracture elongation(%) | ≥450 | ≥550 |
Tear strength(N/mm) | ≥80 | ≥110 |
Puncture resisitance(N) | 1.5mm(Thinkness)≥100 | 1.5mm(Thinkness)≥130 |
Size stability(%) | ±3.0 | ±3.0 |
Vapor permeation coefficient [g·cm/(cm2·S·Pa) | ≤1.0×10-16 | ≤1.0×10-16 |
Features of Black Hdpe Plastic Sheet LDPE Geomembrane Suppliers
1. All physical factors such as anti-draw, anti-tear, and anti-stab meet the requirement of water works, chemicals, tunnels, and transportation project in most conditions.
2.Good aging, durable performance, and wide temperature range, it can be useful over thirty years on the condition of -60æ«60æ.
3. Anti-stab and fine friction factors.
4. Canker proof, acid and alkali proof, untoxic.
5. Lower cost per unit area, cost is 1/3«1/2 lower than that of PVC film, glass and cloth.
6. Convevient to install and dependable effect.
FQA:
- Q: What can we do for the special customer?
A: Provide custom made service with customer's drawing; We make sure to provide you with the best solutions for your individual case. Whether standard items or non-standard items.
- Q: What can we supply?
A: We provide high levels of communication from start to finish.
- Q: What is our advantage?
A: Top Cemented Carbide has extensive business experience, Fast delivery and high quality.
- Q: How to make sure there is no bubble on the film?
- 1. Cutting: The specifications of glass film are cut into veneers than are to be larger than about 1cm. This will avoid the trouble of sticking to the side (while more than one side) and repeating again. 2. To clean the glass: Before pasting the glass paper, the grease, stains and dust on the glass should be cleaned with enough water( the best is t o add some liquid detergent). The purpose of spraying water is to temporarily reduce the viscosity of the glass film, and the viscosity of the glass film will not be affected after it is dry. 3. To remove the back release liner: To remove the membrane type glass film back (with rubber surface) also enough spray in the water, it will paste process can random in the glass move back and forth which is convenient to the proper position. 4. Pasting: First, to paste the glass film on the glass after the average proportion, and post it on the glass top and aligned paste from the top to the down. If it is not alined in one-time, it can be repeatedly reopened to paste (the benefits of spraying water) 5. To exhaust bubbles: To use the scraper or IP card from the center to the around water and scraping bubble, catch out water and air bubbles with a needle or blade punctured to smooth. Until there is no any water and air bubbles, and the glass film is completely sticked on the glass so far. 6. To cut off the rest part: After pasting the film, to cut off the excess part with the blade.
- Q: What are the factors to consider when selecting a geomembrane?
- When selecting a geomembrane, there are several factors that should be considered. These include the type of application, the required strength and durability, the chemical compatibility with the surrounding environment, the thickness and flexibility needed, the installation method, and the cost-effectiveness of the material. Additionally, factors such as the site's temperature variations, UV exposure, and potential for punctures or abrasions should also be taken into account to ensure the chosen geomembrane meets all the necessary requirements for the specific project.
- Q: Can geomembranes be used in wastewater effluent storage and treatment facilities?
- Yes, geomembranes can be used in wastewater effluent storage and treatment facilities. Geomembranes are highly impermeable liners made of synthetic materials that can effectively contain wastewater and prevent it from seeping into the surrounding soil or groundwater. They are commonly used in the construction of wastewater containment ponds, lagoons, and treatment tanks to ensure proper storage and treatment of effluent. Geomembranes provide a reliable barrier against leaks, corrosion, and chemical reactions, making them a suitable choice for wastewater management facilities.
- Q: home decoration glass insulation film is good or posted stickers decorative film.
- Effect decorative film may be a little better, it looks good; since the insulation film with insulation function, appearance and life may be not better than decorative film.
- Q: Are geomembranes suitable for use in mining operations?
- Yes, geomembranes are suitable for use in mining operations. They are effective in preventing the contamination of soil and water by serving as a barrier between mining activities and the surrounding environment. Geomembranes can help with the containment of hazardous substances, such as leachates and tailings, thereby reducing the potential environmental impact of mining operations. Additionally, they can be used for lining ponds, storage facilities, and waste containment areas, enhancing the overall safety and sustainability of mining activities.
- Q: What's the question need to notice about the construction method of composite geo-membrane?
- Composite geomembrane is divided into a cloth a membrane and two film can be widely used in water conservancy dam, highway, airport, drainage, building, environmental protection and other fields can be up to 6 meters in length, the thickness of the membrane material from 0.2 mm - 0.8 mm protective layer of geotextile from 100 g/m2, 800 g/m2, compared to similar products with same breadth, it has reduced the splicing and speed up the construction progress, but also decreased the hidden trouble caused by improper handling; Compared with the traditional cloth and film isolation, the composite geomembrane has increased the stability of product, save the project time, reduce the engineering cost, comprehensive benefit is obvious; composite geo-membrane is paved in embedment, has long durability, good aging resistance, hydraulic?pressure resistance, corrosion resistance, high strength, wearing resistance, low temperature resistance, non-toxic, good drainage function of plane, excellent seepage-proof function; composite geo-membrane has unique thermal insulation, moisturizing, frost?prevention and antifreezing function.
- Q: How do geomembranes contribute to dam construction?
- Geomembranes play a crucial role in dam construction by providing an impermeable barrier that prevents water from seeping through the dam structure. This helps in ensuring the stability and integrity of the dam, as it prevents the loss of water and potential leakage that could compromise its functionality. Additionally, geomembranes are used for lining reservoirs and canals, preventing seepage and protecting the environment from contamination. Overall, geomembranes enhance the efficiency and longevity of dam construction projects.
- Q: Can geomembranes be used in landfill construction?
- Yes, geomembranes can be used in landfill construction. They are often used as a barrier to prevent the leakage of hazardous materials into the surrounding environment. They help in controlling the flow of liquids and gases within the landfill, ensuring the safety and integrity of the landfill structure.
- Q: How to weld imported geomembranes?
- From experience, the following situations should be paid much attention to when you weld geomembranes. 1) When geomembranes should be welded into a concrete building but can't be placed directly, a connecting lock made from the same materials with membranes should be embedded into the building before the geomembranes. Then you can weld geomembranes by conventional method. 2) If there are pipelines to go through the membranes, you should check the size and number of pipelines and melt the HDPE membranes with the prefabricated pipe liners first to prevent seepage. 3) Followings are what I learned from the imported geomembrane melting training in Solmax. If the weather is bad or there is force majeure, the project of melting should be stopped for one day or more. At the same time processed HDPE geomembranes should be fixed by earthbags for damage protection.
- Q: What is the role of geomembranes in oil and gas storage facilities?
- Geomembranes play a crucial role in oil and gas storage facilities by providing a reliable barrier between the stored hydrocarbons and the surrounding environment. These impermeable liners prevent contamination of the soil and groundwater, ensuring compliance with environmental regulations. Additionally, geomembranes help to minimize the risk of leaks or spills, protecting the integrity of the storage facility and reducing the potential for accidents or environmental damage.
1. Manufacturer Overview
Location | Taian City,Shandong Province,China |
Year Established | 2003 |
Annual Output Value | Above US$100 Million |
Main Markets | Africa, North America, Eastern Europe, South Asia, Western Europe |
Company Certifications | ISO9001;IS014001 Certificate |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Qingdao Port;Tianjing Port;Shanghai Port |
Export Percentage | |
No.of Employees in Trade Department | 21-30 People |
Language Spoken: | English; Chinese; |
b) Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Geotechnical Material (Geogrid,Fiberglass/Polyester Geogrid;Geocell;Geonet and Geomat;Plastic Safety Fence);Plastics products;Rubber products;Geotextile;Carpet;Compound geomembrane |
Product Price Range | Average |
Send your message to us
Trp Geomembranes Black HDPE Plastic Sheet LDPE Geomembrane
- Loading Port:
- Qingdao
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 300000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords