• Waterproof Recycling Self Climbing Formwork For High Buildings and Towers System 1
  • Waterproof Recycling Self Climbing Formwork For High Buildings and Towers System 2
  • Waterproof Recycling Self Climbing Formwork For High Buildings and Towers System 3
  • Waterproof Recycling Self Climbing Formwork For High Buildings and Towers System 4
  • Waterproof Recycling Self Climbing Formwork For High Buildings and Towers System 5
  • Waterproof Recycling Self Climbing Formwork For High Buildings and Towers System 6
Waterproof Recycling Self Climbing Formwork For High Buildings and Towers

Waterproof Recycling Self Climbing Formwork For High Buildings and Towers

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description





self climbing formwork system

self climbing formwork

climbing formwork system


Waterproof Recycling Auto - Climbing Formwork For High Buildings and Towers


Description:

Auto-climbing system ACS50 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for the high rise building and bridges.


Waterproof Recycling Self Climbing Formwork For High Buildings and Towers



Competitive Advantage:


1. Perfect anchor system with high load bearing capacity.

Waterproof Recycling Self Climbing Formwork For High Buildings and Towers


As the picture shown, the anchor system is composed of five parts. The load bearing will firstly be transferred to tensile bolt①, then be transferred to climbing cone③, tensile tie④ and anchor plate⑤, that means the concrete structure will be the final force point. Therefore, the whole ACS system unit is very safe and stable.

2. Crane-independent


Crane-independent forming, striking and climbing speeds up the work procedures on the construction site and also makes them independent of each other. This means the planned sequences can be maintained along with guaranteeing high productivity levels. The crane can therefore be used for other tasks.

3. High bearing capacity and safe


The stable working platforms are able to carry large loads, e.g. the storage of reinforcing steel for the next climbing section. Generously-sized working platforms, the well thought-out design for handling very high wind loads and the patented control function of the climbing mechanism are some of the special details contained within the comprehensive safety concept.

4. Platforms adjusted to suit the angle of inclination


The horizontal working areas thus created provide safe and comfortable conditions for reinforcement work, shuttering and striking, concreting and finishing.


5. Outstanding economical efficiency


The ACF system climbing without any lifting machine and it guarantees the simple operation procedure. Time saving, labor saving, site saving, so economical construction is easily achieved.

Waterproof Recycling Self Climbing Formwork For High Buildings and Towers


Waterproof Recycling Self Climbing Formwork For High Buildings and Towers

Waterproof Recycling Self Climbing Formwork For High Buildings and Towers


Q: What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q: The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
Q: Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q: The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords