Tower Crane Topless in row PT6516(QTZ160)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 400 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PT6516(QTZ160) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 10T
Rated Lifting Moment: 800kn.m Max. Lifting Load: 10T
Max. Lifting Height: 200M Span: 65M
Model Number: PT6516(QTZ160)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour:Blue/ White
After-sales Service Provided: Overseas third-party support available
PT6516(QTZ160) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary,Travelling, external,internal climbing tower crane
4. Potain masts designed with dismountable panels, making teansport easier and cheaper
5. New designed mast, can be used to Internal and external climbing tower crane
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
PT6516(QTZ160) Specification
PT6516(QTZ160) Pictures
PT6516(QTZ160) FAQ
Q: What is tower crane?
A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
- Q: National standards for tower cranes
- GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
- Q: He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
- Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
- Q: would a tower crane be a first class, second class, or third class?
- Did you open your ME book? The answer is in there.
- Q: What should be included in the disassembly plan of the tower crane?
- - 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
- Q: I am familiar with them, I have seen them before at my previous houses. But this is the first spring season for me in the house I am living in and they are absolutely everywhere. They stay right out side the house and they are all over the yard. I want to know if anyone knows any possible ways to rid them from the vicinity of our home. Thanks for the answers.
- Crane Fly Control
- Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
- A crane is a pulley and using simple machines like wedges, screws, pulleys etc. takes less work.
- Q: Which style of Kung Fu has an animal system besides Shaolin? Which one has the Tiger, Monkey, Mantis, Snake, and Crane animals (not Shaolin because Shaolin has Dragon, Tiger, Leopard, Snake, and Crane.)
- Monkey Vs Snake
- Q: My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
- Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
- Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
- The cranes are taken to the top of the buildings in pieces and then they are built together whilst up there.
- Q: total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
- To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.
Send your message to us
Tower Crane Topless in row PT6516(QTZ160)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 400 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords