• Tower Crane QTZ160(6515) Self-raised 10T System 1
  • Tower Crane QTZ160(6515) Self-raised 10T System 2
  • Tower Crane QTZ160(6515) Self-raised 10T System 3
Tower Crane QTZ160(6515) Self-raised 10T

Tower Crane QTZ160(6515) Self-raised 10T

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
120 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ160(6515) 8 Description

Feature: Tower Crane                    Condition: New 

Application: urban construction      Rated Loading Capacity: 1-10T 

Rated Lifting Moment: 200MT        Max. Lifting Load: 10T 

Max. Lifting Height: 178.5M               Span: 3-65M 

Model Number:  QTZ160(6515)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTZ160(6515) Features

1. With automatic welding robot for tower crane structures.

2. Export to more than 20 countries with CE/ISO Certificate.

3. Stationary or Fixed or Inner Climbing tower crane

4. Impeller blasting or rust protection paint

5. Advanced painting process and excellent color 

6. New designed mast, can be used to Internal and external climbing

7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor

QTZ160(6515) Specification

Tower Crane QTZ160(6515) Self-raised 10T

QTZ160(6515) Pictures 

Tower Crane QTZ160(6515) Self-raised 10T

Tower Crane QTZ160(6515) Self-raised 10T

Tower Crane QTZ160(6515) Self-raised 10T

Tower Crane QTZ160(6515) Self-raised 10T



QTZ160(6515) FAQ

Q: i am making a wired crane robot to pick and drop a wooden block of about 5*5*10cm dimension. I would like to know wat r the different possible lifting mechanisms by which i can lift the wooden block.Ideas other than the normal claw shaped lifters
There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
Q: Tower crane 5610 why is it called QTZ63?
QTZ refers to the lifting tower crane, and the 63 is the torque, the unit is tons x meters, generally in accordance with the crane's nominal gravity moment to sub model, which level is close to which model. The latter four numbers, the first two represent larger, the unit is M, and the latter two represent the largest range of maximum lifting weight, the unit is KN
Q: Please no direct translations. I need the official name of the whooping crane in French.
When I don't know a word and it is not in the dictionary, I enter it in wikipedia and then change the language on the left to see the corresponding article in the other language.
Q: I am making a lot of little paper cranes, and so far I have 144 cranes. I want to know what different number of cranes mean. Like, what do 100 cranes mean? Good luck? Long life? I don't know!!! So what do 100 cranes and 1000 cranes mean?!? Please answer if you know, this question is almost driving me crazy!!!!
A Japanese legend indicates that anyone who folds 1000 paper cranes will be granted a wish. Sadako Sasaki was a Japanese girl who died from radiation sickness from the A-bomb dropped on Hiroshima. She wanted to fold 1000 cranes before her death at the age of 12. There is a peace monument to her memory in Hiroshima, and people from all over the world send paper cranes to the site.
Q: Cranes nowadays are MASSIVE! but something that has been bugging me for ages is how do they get the massive crane bit at the top down once they have finished constructing the skyscraper/building?
i hope this link helps
Q: feminists always point to sexism. but Ive found 3 women here - who say they have experienced no sexism, and were pleasantly surprised by how excepting their largely male co-workers have been -
I dunno. I tried to get a blue collar job and asked my friend for a reference and he said, You know they won't hire you. Why, because I'm a lady? Yeah. Whatever, I didn't want your stupid job anyway. He's underworked and underpaid anyway, so women aren't exactly lining up to steal his job, anyway.
Q: Interesting facts about the short story writer, Stephen crane.
Susie, I am sorry I missed the original question so I don't know what the norm may be. I tend to side with CC. Why compare one country or person to another? Why is being 5 years behind (if that is the case) the rest of Europe bad? One of the heirs to Sam Walton's fortune (huge, monolithic discount store in the USA, Wal Mart) drives a Ford F 150 pickup truck (a run of the mill, average, regular vehicle) certainly not commiserate with the funds she has available to spend. She choses to be 'behind the times' so to speak. Who ever said that all technology is beneficial? Whoever said that having electronic relationships via the internet is better than greeting, smiling and talking with your neighbor? Personally, I would rather be a little anachronistic than futuristic. But that's me. And I have great respect for you and your country. Is it 5 or 10 years behind anybody? I don't know. Is it better or worse than anybody? I don't know. Is it different from anybody? Absolutely, and I am glad for it.
Q: Information of distributor or manufacturer for Crane Lake Cellars will be helpful too.
There okorder /... There are two other Crane wineries. Crane Family and Crane Canyon, but they are independant wineries and have no connection to Crane Lake Cellars. (as far as I know). You can give Bronco Wine Company a call and check - they have a toll-free number. and should be able to tell you a distributor.
Q: i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
I can think of a few reasons. The first 2 are safety related, the 3rd is work-efficiency related. 1. To minimize wind loading for the expected wind-direction overnight. 2. To minimize damage to the surrounding area should a failure happen and a crane fall (similar to felling a tree in a forest so it falls in the direction the lumberjack wants it to fall). 3. To leave the boom over the worksite for the next morning's first pickup (so, it would be a coincidence that all the pickup sites were at the same angle relative to the booms). .
Q: Climbing process of an internal climbing tower crane
Climbing tower crane, usually installed in the elevator shaft building or ad hoc Bay, also can be installed in the cylinder structure, by means of a climbing mechanism increases with the structure increases, generally every building 3~8m, crane climbing a tower, its height is only 20m left and right, lifting height with construction height and.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords