Tower crane The Product model -TC4708
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC4708
TC4708tower crane is a new-style hoisting and transporting machine designed to meet the need of assembling high-level construction equipment. The product is an upper rotary self-lifting kind with horizontal jib, trolley amplitude. The length of the jib is 47m, rated maximum lifting capacity is 4t and rated maximum lifting moment is 400kN.m. The following is the main characteristics.
1. Wide applicability. The applicability is ranging from civil construction in small and medium cities, to high-rise, multi-layered civil construction in big cities. It can also be used in the construction of multi-layered industrial factories, in the slip-form construction of huge chimneys and silos and in goods loading in port or goods yard.
2. Easy to assemble and disassemble.
3. High speed, easy adjustment, stable operation and high efficiency. Low speed with heavy load and high speed with light load can be realized through lifting structure. Two kinds of speed of trolley can meet operational needs. Open stopper is equipped to slewing structure, enabling precise placement and easy assembly of crane.
4. Complete protective and reliable safety devices. The product is equipped with weight limit, moment limit, height limit, trolley limit and slewing limit to ensure normal operation. Besides rest platform, protective railings are also equipped.
5. Driver’s cabin is separately set. It is broad, bright, comfortable, safe and easy to operate.
TC4708Loading capacity
JIB m | Rate | 11 | 13 | 16 | 19 | 22 | 25 | 28 | 31 | 34 | 37 | 40 | 42 | 44 | 46 | 47 |
2t-21 | 2 | 2 | 2 | 2 | 2 | 1.89 | 1.64 | 1.45 | 1.29 | 1.16 | 1.05 | 0.95 | 0.9 | 0.85 | 0.81 | 0.79 |
4t-11 | 4 | 4 | 3.34 | 1.68 | 2.23 | 1.89 | 1.64 | 1.44 | 1.29 | 1.16 | 1.05 | 0.95 | 0.9 | 0.85 | 0.81 | 0.79 |
TC4708Parameter list
TC4807 | Max lifting capacity t | 4 | Metric lifting moment | 400KN.m | ||||||||||
Independent m | 29 | Attached m | 120 | |||||||||||
Material of main tower mm | ∠140×140×12 | Section of tower mast m | 1.5×1.5×2.2 | |||||||||||
Total power | 25.7KVA | voltage | 380V50Hz | |||||||||||
Hoisting | Type | Fall | Hoisting | Speed(m/min) | Rated power | Rope Length | ||||||||
JZQ460 | 2Fall | 1/2/2 | 50/33.7/6.5 | 15/15/4 | 280m | |||||||||
4Fall | 2/4/4 | 25.5/16.9/3.3 | ||||||||||||
Slewing | XL100 | Slewing speed | fluid coupling | Torque | ||||||||||
0.375/0.75( r/min ) | Y0X280A | 10000N.m | ||||||||||||
Trolley | WCJ120 | Rated power | Rope Length | Hauling load | ||||||||||
2.4/1.5KW | 50m | 2700N |
- Q: A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
- It really depends on the terrain or the platform where this crane will stand.. If it is in a muddy or sandy terrain, then they may opt to use a chain tire. Cranes, dont merely rely on the tires. Cranes use outriggers. These are the extending arm of the crane. This hydraulically operated mechanism goes out of the cranes body, extends and extablished itself at four corners and sits at the ground to provide leverage for the cranes. This will prevent the crane to overturn when it is doing the operation.
- Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
- They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
- Q: I've been making lots of paper cranes lately, thinking I would know exactly what to do with them. In reality, I'm a bit short on ideas... Can you help me with this, because I'd love to find ways to decorate my room with them. I can't really use nails on my walls or ceiling, so I can't do a mobile or randomly string them about.
- Okay - so if you can't string them from the ceiling - than what I would do is buy some round vases/globes, from Pier one or some place like that, and fill them with paper cranes, then set the bowls on your shelves/windowsill/desk/table or other flat surface. I've enclosed some examples below. You can also make a mobile by hanging something like a super strength hook with adhesive. 3M makes them (the same folks who created scotch tape). The adhesive does not damage walls and you can stick them to anything. They can bear up to 30 pounds of weight. Put a few on your ceiling or walls and hang your mobiles from them.
- Q: S930 M50 (M125/75) level jib tower crane about how much money
- Do you want to see is that, generally is Sishijiwan
- Q: across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
- If okorder /.. Crawler cranes/ have tracks like a bulldozer/ normally have a larger lifting capacity and are brought to the work site on multiple semi-trucks. Then put together with smaller cranes. Hope this answers most of your questions. Wingman
- Q: What are the necessary safety devices on a tower crane?
- (3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.
- Q: How many meters of cranes should be in accordance with the anemometer?
- The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
- Q: What are the differences between the tower crane and the lift?
- they are nothing alike
- Q: A site would be nice...
- I just used that poem for a project!
- Q: I'm not sure how to set this problem up. Any help would be greatly appreciated. Thank you :)
- We start using by defining mechanical Power: = P=Work/time What is the work here? We lift the box a given distance. Work=mgh Since we know the power of the crane, we can simply plug in the values and solve for t: t=mgh/P This is only true if the crane has a constant power, which seems to be the case LeSmartOne
Send your message to us
Tower crane The Product model -TC4708
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords