TOWER CRANE TC4708C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
- Shock absorption. The ball swings toward the building and hits, the energy of that swing is mostly dissipated into the building but also into the cable and cable connectors as the ball bounces back. That shock of the impact resonates and gets dissipated by the tire. It reduces wear and tear on the cable and cable connectors, also on the crane tower. Your car engine has motor mounts of the rubber type of material and it absorbs the resonating vibration of the engine. I have seen the cable connectors, interesting to say the least. The strands are interlaced sometime, and other times I see them clamped together. It would seem important to protect those joints. I do not know all of the crane business terminology, but that would be the gist of it.
- Q: I understand the Crane stances and know there are more than one. I am referring to the single leg crane stance. I also know that stances are only used briefly. But I am curious, does this stance have any bunkai applications? Or is it only useful against dodging a kick or preparing to kick?
- I okorder /
- Q: I still cannot grasp how a crane was taken apart on a building with no roof
- They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
- Q: He looked so out of his comfort zone at UFC 140. No support from either Silva or Seagal. Which brings me to another question. Why weren't those 2 by his side? Seagal or Silva are always at his side.Jones' height shouldn't be an issue. He should've at least tried to use it.
- machida was getting pressured way too much the front head kick has to be set up to work you cant just throw it up
- Q: I don't really believe that the wish will be granted.Anyways I've really been into Origami and I remember reading in my Heroes book (slash the show) that a certain number of cranes means a wish. But before I start making all these cranes, I want to know if it's 100 or 1,000.So if you haven't gotten it in your head yet the question is:Is it 100 or 1,000 cranes to get a wish
- 1000 Cranes Wish
- Q: Hey,My grandma has a big country estate with a river and its her birthday coming up. She's indicated she might like another peacock (we've had them before), but I'm thinking of branching out into other birds. We tried Lady Amerhursts pheasants, but one of the dogs knocked over their cage before they were properly acclimatised and they disappeared.So, does anyone know if its possible to get storks or cranes or other big waterbirds to keep as domestics?They'd be free ranging on the estate and the river, so need to be smart about foxes and mink (ie roost in trees or go into a house). We've kept geese and ducks successfully on our river like this, so does anyone have any ideas?Or should we try again with pretty pheasants?
- Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
- Q: It got me thinking.
- I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
- Q: Tower crane demolition safety technical disclosure, how to write?
- Baidu search:Tower crane removing and lowering joint safety technical disclosure.
- Q: Could anyone tell me how they erect a construction crane.Some how they just are suddenly THERE, as If by magic.It seems as though the Boom part of the crane must be kind of JACKED up into place.That is the only way I can see them getting those GIANT concrete blocks into the back end of the boom. It doesn't seem possible otherwise. The only other thing I can thing of is the bulk of the pieces are brought in by helicoper and attached.Everything kind of makes sence except the Giant concrete blocks used as a counter weight. ALSO, if the blocks are needed to act as counterweigth to the CRANE itself..why doesn't the Crane fall over when it picks stuff up???
- How do they erect the construction cranes? Not very well according to the news of them toppling down of late. Seriously, the cranes are lifted upward one or two floors at a time as the building progresses upward - this is usually accomplished by pulling them up into place with heavy cables and powered winches.
- Q: for example: erection, technical data...
- Well now Slartybardfast may be tried lol but he is correct give him the points lol.
Send your message to us
TOWER CRANE TC4708C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords