• TOWER CRANE TC4708 System 1
  • TOWER CRANE TC4708 System 2
  • TOWER CRANE TC4708 System 3
  • TOWER CRANE TC4708 System 4
TOWER CRANE TC4708

TOWER CRANE TC4708

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:in the title. any books that talk about the physics in a tower crane? or any crane in general? or a similar machine to a crane?
Hi, Well, this is an interesting topic about physics and requires to have a basic knowledge, correct? So here we have some books: - Chopra, K. A. Dynamics of Structures: theory and applications to earthquake engineering. - Bostelman, R., et al. “Toward Next-generation Construction Machine,” Proceeding of American Nuclear Society 9th International Topical Meeting on Robotics and Remote Systems. - Gore, Bryson. Trucks, Tractors, And Cranes. - Grote Antonsson, editors. Handbook of Mechanical Engineering. - Seidel, Michael. Tensile Surface Structures. B-) FL ------------- You cannot teach a man anything; you can only help him discover it in himself.” (Galileo Galilei)
Q:LCS , MCS , HCS?
Good question! I have lots of experience driving cranes lifting boats in and out of the water mainly. But I don't really think this ever occurred to me. So I had a look around on the old www - which I do not usually do, much, in 'Answers'. But here's your answer, I reckon (another interesting QA site, too! - I leave you the thread in Source(s).): The steel used for crane hooks are based on the application. For cold temp. use you'll need LCC or low temp carbon steel (requiring Charpy Impact values of 15 foot pounds at - 25 degrees F. The materials used can be either cast ASTM A148, or 9060, or A487 4B or a forged 4140 material. All have the properties in the ASTM specs (see specs on line . com). All of these specs have specific heat treats that are part of the individual specs.
Q:dynamic force on crane when a load of 37k falls 1',2' 3'or 4'?
Need more information. In general, the answer is that the dynamic load depends on how quickly the payload decelerates. The dynamic load will be the mass of the payload times the peak deceleration rate. In a strength calculation, do not forget to include the static weight component of the load. The deceleration depends on the elasticity of the cables supporting the load. If the crane has a flexible supporting structure, then that could also affect the result. (You didn't say whether the crane is the traveling overhead hoist type usually seen in a factory - which typically has a stiff support - or the cantilevered truss type seen on construction sites - where the support might have a little flexibility.)
Q:A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m. Calculate the work the crane performs.
Mass of soil(m) = V x d =m = 1.81 x 2084 = 3772.04 kg =Weight = m x g = 3772.04 x 9.8 = 36965.99 N Thus the total Force by crane = 36965.99 + 2355 = 39320.99 N Thus Work done (W) = F x s = 39320.99 x 7.56 = 297266.70 J = 297.27 kJ
Q:I am currently in the Air Force reserves as a heavy equipment operator. I really want to learn how to become a tower crane operator. How would I go about doing this? I live in CA.
Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
Q:i want to go to school and learn to operate over head cranes
No. they can't chew human beings. The lengthy pointy bit on the lower back isn't a sting both. it truly is an ovipositor, designed to allow the Crane fly to position her eggs in the soil. The eggs hatch out into leather-depending Jackets, gray grubs who devour the roots of grass. once you spot starlings and different birds on a backyard poking bout into the floor, it truly is what they're searching for, effective tasty leather-depending Jackets. leather-depending Jackets make the grass of a backyard pass yellow, and die. they're pests, notwithstanding the Crane fly is purely tense even as it comes interior.
Q:can anyone tell me the principle under which a GANTRY CRANE works..........Suggest me some websites which gives details about the working of gantry crane ....please help me......
This okorder /
Q:when a skyscraper is done being built, how does the crane come down?
Skyscraper cranes (for construction) are usually dismantled into small sections and pieces after final stage of construction is done. Some of the smaller pieces are transported down by construction evaluators, while bigger pieces are lifted down by series of pulleys or cranes mounted at the side of the buildings edge.
Q:I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
Large okorder .
Q:How to build a tower crane?
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords