Tower Crane TC7135 ConstructionEquipment Wholesaler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7135 Description:
1.CMAX Tower Crane TC7135 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7135 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7135 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7135 Parameter:
Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、71
Min working range (m) 2.5
Max lifting capacity (t) 16
Tip load @ 50m (t) 3.5
Tower Crane TC7135 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7135 Diagram:
Tower Crane TC7135 Technical Sheet:
Tower Crane TC7135 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Please help me on this question, I can't seem to find it anywhere on the internet! :(
- No animals depend on Siberian crane but they are a source of food to carnivores in the wild.They are usually secondary source because there are mroe source of food that carnivores could eat.SO if they are extinct,it would not be a problem...its only destroying natures beauty!
- Q: For those of you who know about the tradition where you make origami cranes and can make a wish, is it 999 cranes or 1,000 cranes? Cuz I just finished making 999, but I'm not sure if it's actually supposed to be a thousand instead.
- It is susposed to be 1000 cranes. You string them in 10 sets of 10 cranes. [thats how I remember!]Can you send me your way of folding them? I can't find one that works right for me, they always turn out a little wrong. :[
- Q: Who do you think was better and who would've won if they faced.
- willie with out a doubt
- Q: I had a dream and it wos really scary so realistic i woke up crying and could go to work the next dayi was in my house and woke up and came downstairs and there were letters on the floor and someone was picking them up then i looked outside and there wos a big fire and a crane had fallen down and explosion and everyone was dying their faces burnt i burst out crying. what does it mean?
- Probably some stress or fear is looming large in your subconscious mind. Scary dreams often occur when you have something that is stressing you. That is assuming you didn't read some book or watch some movie that brought it on, that is another possibility. Often we replay images we have in our heads from the day before. I don't think it is an omen or anything. So, be glad to say it was only a dream.
- Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- The cranes hook to the side of the building and climb the steel frame as it is being built. The crane can only reach a few stories so it has to climb each story's steel frame as it is finished.
- Q: i have a report on it and its due on the 20th
- I'm from the Sandhills of Nebraska and that is where some of them come from.
- Q: What are the main parameters of a tower crane?
- Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
- Q: Calculate how much power the crane has?
- the crane ?? The crane is not defined.
- Q: because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
- Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.
- Q: what is the difference between rigging, wire rope and rope?
- Crane rigging usually refers to the cable that actually is attached to a cylinder in the crane and the motor turns the cyl. and either take up cable or vice versa. The cable is reeved thru the long (arm) boom of the crane and thru pulleys and then at the end of the cable there is a hook.
Send your message to us
Tower Crane TC7135 ConstructionEquipment Wholesaler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords