• Tower Crane TC7135 Construction Equipment Wholesaler System 1
  • Tower Crane TC7135 Construction Equipment Wholesaler System 2
  • Tower Crane TC7135 Construction Equipment Wholesaler System 3
  • Tower Crane TC7135 Construction Equipment Wholesaler System 4
  • Tower Crane TC7135 Construction Equipment Wholesaler System 5
  • Tower Crane TC7135 Construction Equipment Wholesaler System 6
Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 Construction Equipment Wholesaler

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: Do you believe in the 1000 folded paper cranes give you a wish?What is the entire process in it all?And can they be in another persons hand like if I make 1000 an a few are at my friends possession will it work?
I believe it too. You just make 1000 paper cranes, and I think that only the victim of the disease is supposed to make it. Oh yea, and you hang the cranes around the victim. This is kind of irrelevant, but once i read a book Sadako and the Thousand Paper Cranes. It's about a girl who tries to make 1000 paper cranes in order to get cured. It's really sad, but that's where I'm getting my info from.
Q: National standards for tower cranes
GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
Q: how tower crane extend it heights?
They okorder /
Q: I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
Shoot a crane with an arrow and take a picture. Life drawing and technology mesh well.
Q: What are the parts of a tower crane? What are their main functions?
The structural elements include the followingMain arm: carrying weight, and making the trolley have walking track.Balance arm: put up lifting mechanism, electric box, counterweight, and make tower crane to achieve balance torque, reduce the standard section of the bending moment.Tower cap: connect the main arm with the balance arm by the tie bar, so as to reduce the bending moment of the standard section.
Q: Well,i just LOVE this piece of origami work...I've tried so many (kinda the same) instructions but i always get confused on the step 3-4...do you know any easy instruction,with clear explanations for a begginer?thank you already~~
visit okorder / that's the place where I learned folding paper cranes. XD I've always loved them.
Q: I see crane flies everywhere but I've never seen them eat anything.
Crane flies usually don't eat after becoming adults. They usually just breed and die. If they do they would eat nectar. As larvae they eat what most larvae do roots and other vegetation in the soil. 2 0 Comment
Q: Information of distributor or manufacturer for Crane Lake Cellars will be helpful too.
contact address crane lake cellars vineyard winery napa california
Q: Trying to find an estimated weight for a mobiles crane with a 5 tonne capacity ?
It is not the weight of the crane alone that matters. But to some extend if the crane is light, this could create a torque when carrying a heavy load and the crane could collapse. Therefore I am speculating that inorder to lift 5Tonnes, the crane must be more than 5 tonnes to balance out the moments resulting in a torque The internal structure of bolts and trusses must be able to handle heavy loads and their are several calculations done to find each forces acting on the members of a truss. For eg: By using Pin Joint Analysis
Q: any one can give me address for forged hook for crane?
here okorder /

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords