• Tower Crane TC7135 Construction Equipment Wholesaler System 1
  • Tower Crane TC7135 Construction Equipment Wholesaler System 2
  • Tower Crane TC7135 Construction Equipment Wholesaler System 3
  • Tower Crane TC7135 Construction Equipment Wholesaler System 4
  • Tower Crane TC7135 Construction Equipment Wholesaler System 5
  • Tower Crane TC7135 Construction Equipment Wholesaler System 6
Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 Construction Equipment Wholesaler

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 Construction Equipment Wholesaler

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: How do cranes get put together?
bird eggs?
Q: What does "automatic tower crane" mean less than 100 tons per metre?
The problem is a bit ambiguous, 100 tons of rice is the lifting moment.
Q: How do tower cranes rise?
A tower crane raises weights by clicking on the reverse;Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q: I am in dyer need of a camera jib wih very little budget and/or tools to build one. I am wondering if i can use a cymbal stand for a crash cymbal as a camera jib? My idea is to modufy it by attatching a small piece of wood to the top screw where you would put a cymbal the screw in an L piece (metal) to it or attach it ti the arm of the stand and just snigly fit it so as the arm is raised and lowered the L pice compensates and stays strait. i would attach the camcorder to the L piece with a 1/4 inch screw and washers. i also need the arm to move smoothly will this work with a crash stand. all advice i am grateful for thanks
While technically possible to do what you want, it is not recommended. I have seen too many cymbals and stands fall over during rehearsals or gigs... I think you want a much wider stance on the base. For the smaller cranes, use of a tripod works - but look at the pictures - the tripod legs are fully spread. In a couple of cases, using a heavy duty tripod - basically the same tripod used for PA speaker stands or light trees is done. In both cases, the wider stance of the fully spread legs will protect your camera investment. It is all about balance and center of gravity. A cymbal is about 2-3 pounds and the cymbal takes up a very small area, typically not much wide thatn the cymbal stand's leg spread - and we already know you can pretty easily knock over the cymbal stand... a small consumer camera is 2-3 pounds + the weight of the crane (which will depend on how long the crane is + the counterweights + any cables you might add... Cables? Sure. First, while not REALLY a requirement, since the camera is pretty far away from the person operating the crane, a LANC to start/stop recording and adjust focus and zoom is needed. As well, since the camcorder's viewfinder and LCD panel are that far away, in order to know if the shot is framed or in focus, you need a monitor. So cables... and that's potentially another couple of pounds. Technically, will it work? Yes. Would I trust my camera gear on it? Uh... likely not... but maybe you might - if the cymbal stand leg spread was made much larger and re-inforced with several 2x4s... and it was really solid... Be careful with the crane arm and counterweight total weight. Cymbal stands were not designed to hold a constant 15+ pounds of cymbals... let alone a constant 15+ pounds of anything else...
Q: Could anyone tell me how they erect a construction crane.Some how they just are suddenly THERE, as If by magic.It seems as though the Boom part of the crane must be kind of JACKED up into place.That is the only way I can see them getting those GIANT concrete blocks into the back end of the boom. It doesn't seem possible otherwise. The only other thing I can thing of is the bulk of the pieces are brought in by helicoper and attached.Everything kind of makes sence except the Giant concrete blocks used as a counter weight. ALSO, if the blocks are needed to act as counterweigth to the CRANE itself..why doesn't the Crane fall over when it picks stuff up???
How do they erect the construction cranes? Not very well according to the news of them toppling down of late. Seriously, the cranes are lifted upward one or two floors at a time as the building progresses upward - this is usually accomplished by pulling them up into place with heavy cables and powered winches.
Q: why the new york cranes collapsed?
supply them time Dizz, ultimately some Lib will say that is Bush's fault because...he enable the metal marketplace crumple so the crane became created from chinese language iron...or he did not signal the bill to provide the city of lengthy island adequate money for inspectors...or he ordered it to make Bloomberg seem undesirable because Obama became thinking Bloomberg as vice president.
Q: how to build a crane using:woodelasticsgluescrews/boltsbottlessyringesnailsplastictin canand rubber tubingplease be detailed,thanks! :)
Carefully. okorder has kit numbers and downloadable instructions for many Lego cranes. You might be able to find some of them on OKorder. You may not need to actually build the Lego crane. Instead, look at the model, determine the major pieces (wheels, turntable, arm, etc.). Then, look at your bundle of pieces and make something with the same function.
Q: and it appears to be looking up at the sky?
i think it does that because it is very scared
Q: total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.
Q: So, this might seem like an odd question, but here goes.I work in an office and outside the windows there's a crane. Every day I come in from work, it has turn a little. The half-finished building that it stands next to is not being worked on and there's never anyone using the crane during the day. There's no other construction going on in the area is stands at.It's pretty high up like 6th to 7th floot and it's in a windy town. Does that matter?Why would someone turn around a crane during the night? Is it all a scheme to make me paronoid because they know I'm starring out the window most of the day?
I guess it would be pretty windy up there at the top - maybe it is not fully locked, and the wind blows it around a little bit.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords