Tower Crane TC5516 Fast Delivery Factory
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5516(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Specification of Tower Crane
Technical Sheet for TC5516
Free standing height (m) | 44 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 45、50、55 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 55m(t) | 1.6 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 17.6 | ||||
Mast section size(L×W×H)m | 1.6×1.6×3.0 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Loading diagram:
55m jib length:
R m | 3.1—13.5 | 17 | 22 | 27 | 33 | 37 | 45 | 47 | 50 | 52 | 55 | |
a=2 | 4t—24.65m | 3.61 | 3 | 2.61 | 2.38 | 1.95 | 1.8 | 1.72 | 1.6 | |||
a=4 | 8t | 6.2 | 4.62 | 3.41 | 3 | 2.61 | 2.38 | 1.95 | 1.8 | 1.72 | 1.6 | |
50m jib length:
R m | 2.5—15.17 | 19.65 | 22 | 25 | 27.4 | 33 | 38.5 | 42 | 47 | 50 |
a=2 | 4t---27.6m | 3.22 | 3 | 2.71 | 2.37 | 2.2 | ||||
a=4 | 8t | 6.2 | 5.53 | 4.76 | 4 | 3.22 | 3 | 2.71 | 2.37 | 2.2 |
45m jib length:
R m | 2.5—15.17 | 22 | 25 | 27.4 | 29.8 | 33 | 38.5 | 40 | 42 | 45 |
a=2 | 4t | 3.65 | 3.22 | 3 | 2.87 | 2.71 | 2.5 | |||
a=4 | 8t---15.17m | 5.53 | 4.76 | 4.2 | 3.65 | 3.22 | 3 | 2.87 | 2.71 | 2.5 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Who do you think would win in a battle between Roger Thorpe and Alistair Crane?
- alistair crane has nothing on roger thorpe. it wouldnt be a battle, roger will make alistair look like a clown.
- Q: my friend is in the hospital with really bad burns
- A really long string. Or have I misunderstood the question?
- Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
- Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
- Q: Which Kung Fu influenced Shotokan, Shito-ryu and Shorin-ryu?
- i okorder /
- Q: An Episode Of War by Stephen Crane
- Crane saturates his writing with similes and metaphors.
- Q: how do cranes get assembled ? on building sites?
- By people.
- Q: I am having trouble thinking of girls names that go well with my last name, Crane.my favorite name is lily but i think it sounds bad with my last nameand i like the name emma and i think that it goes well with crane but i think it might be too commonso if any of you can think of names that are not super common (not unheard of either) that go well with crane that would be awesome. Thanks!
- Emma Michelle Crane Ella michelle crane Miranda Marie Crane Tiffany Jo Crane
- Q: Her fan mail address isnt on fanmail
- Try: Kara Crane c/o Orange County High School of the Arts 1010 North Main Street Santa Ana, CA 92701
- Q: What do the words neck-craning and neck-straining mean in the sentence below?Sports cars are often designed to make a statement, and many of the newest models do that with neck-craning styling and neck-straining performance.
- the ''neck craning'' styleing referrs to the fact that the car is so beautifull that people can't help but look at it. the ''neck straining'' in the context of this sentence referrs to the fact that the car is so powerfull it can hurt your neck muscles with the torque and the G forces.
- Q: You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
- from the ground up
Send your message to us
Tower Crane TC5516 Fast Delivery Factory
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords