• Tower Crane TC5516 Construction Equipment Building Machinery Distributor System 1
  • Tower Crane TC5516 Construction Equipment Building Machinery Distributor System 2
  • Tower Crane TC5516 Construction Equipment Building Machinery Distributor System 3
  • Tower Crane TC5516 Construction Equipment Building Machinery Distributor System 4
  • Tower Crane TC5516 Construction Equipment Building Machinery Distributor System 5
  • Tower Crane TC5516 Construction Equipment Building Machinery Distributor System 6
Tower Crane TC5516 Construction Equipment Building Machinery Distributor

Tower Crane TC5516 Construction Equipment Building Machinery Distributor

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC5516 Description:

1.CMAX Tower Crane TC5516  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5516  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5516  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5516  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5516  Parameter:

 Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 44

Max height with attachment (m) 150

Working range can be adjusted (m) 44、50、55

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.6 


Tower Crane TC5516   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5516 Diagram:

Tower Crane TC5516 Construction Equipment Building Machinery Distributor

Tower Crane TC5516 Construction Equipment Building Machinery Distributor


Tower Crane TC5516 Technical Sheet:

Tower Crane TC5516 Construction Equipment Building Machinery Distributor

Tower Crane TC5516 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:as the crane cabin temprature is very high which is not good for equipment pls advise which air condition is good for colling
Ask the Marine Architect that designed the system. A consultation with the electrical engineer and the chief engineer of the vessel and the chief electrician is also necessary.
Q:What is the difference between a tower crane and a jack up tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.
Q:I've only read Hunger Games and watched the movie and noticed a large presence of Seneca Crane in the movie.However, I don't recall him being mentioned in the Hunger Games? Is he even mentioned in the Hunger Games? If so, please provide pages.I know he is definitely mentioned in Catching Fire but I haven't read that yet.
Nope. He is just called The Gamemaker in The Hunger Games. I guess they wanted to elaborate on him more so that you would know Katniss's hatred for him in the Catching Fire movie.
Q:What is the theme of the poem A man to the universe by Stephen Crane?
In the poem “A Man said to the Universe” by Stephen Crane three distinct images appear as the reader relates man and universe as they fit into their cosmic role. The simplicity of the five line poem envelopes man’s perception of his place among the universe, the universe’s perception of its role in the order of life, and the relationship of both man and universe in regards to the enormity of the cosmos. Collectively, these three components create a profound thought on creation. By Folrani Adewale
Q:Do large semi-submersible crane vessels such as the SSCV Thialf propel themselves to work sites or are they carried on heavy-lift ships. I understand they have propulsion systems but the just seem so bulky, inefficient, and slow to move across oceans on their own.
Very large capacity crane vessels have propulsion machinery for manoeuvring when on station. The most modern designs of semi-submersible vessel use them to achieve 'dynamic positioning'. Older designs used the propulsion systems to assist when deploying the anchors in the correct pattern. The vessels are towed by tugs when making deep sea passages. First generation crane vessels had much smaller lifting capacities and were either constructed on conventional hulls or were converted from existing ships. These types were capable of making ocean passages using their own propelling machinery.
Q:I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
I okorder /
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:I just seen pics of a crane fly and not sure if I see crane flies in my house or mosquitos now. And do crane flies bite?
WTF?! That's a fly? I've been misled my whole life!
Q:I only wish to know about Tower Cranes, not any other type of crane. Also only wish to know about cranes on the job, not sitting in a crane yard. I am an operator and looking to move and want to know where the work is best so a list of top five would be terrific. Thanks.
We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.
Q:Please write in days, hours, weeks, etc.I need math help!!!!
7*60 / 60 + 11/60 = 420+11 / 60 = 431/60 seconds to make 1. 431/60 * 1,000,000 = 431,000,000 / 60 = 43,100,000/6 = 21550000/3 seconds. 21550000/3 / 60 = 21550000/180 = 2155000/18 = 1077500/9 minutes 1077500/9 / 60 = 1077500/540 = 107750/54 = 53875/27 hours 53875/27 / 24 = 53875/648 = 83.14040987654320987654320... days. 0.1404098765432098765432...*24 = 3.37037037037037... hours. .37037037037037037... *60 = 22.22222222222... minutes 0.2222222222222*60 = 13.333333333333333 seconds. 83 days, 3 hours, 22 minutes and 13 1/3 seconds.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords