TOWER CRANE TC5013C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: OMG! a phoba of crane flys, and there are 5 on my celling right now!!! What do I do, will the move and fly around eventually? I can't kill them, they are out of my reach, and if they start moving, im runing the %^$ outta my house.Will they die by tommorow? or will they just hang there?
- Just gently scoop them up in your hand and put them outside.They don't bite!
- Q: He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
- Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
- Q: I work a few blocks away and my window faces the building, now shrouded in black netting and scaffolding. I cannot comprehend how that crane got up there!!
- First opf all structure engineer design the crane(wind Load+load carrying capacity+self weight+torsion+moment...etc) then designed in parts then fabricated with iron pipe, angles, girdrers. then transported to site on trucks then assembled in small pieces on ground then step by step joined with the help of crane, or even helicpoter(it was even used in CN tower)
- Q: Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
- The movie was not a documentary, nor was it a how-to. As a result, the writers are given what's called poetic license to portray movements in any manner they wish, whether or not the techniques, philosophy, or theories behind them are accurate. I have never heard of anyone being apologetic about the movies or any of the techniques therein. But, I don't think they ought to be. The movies on both sides of the generation gap that separates them are equally entertaining.
- Q: Where do Cranes (the bird), typically live in ohio?
- Are you referring to Sandhill Cranes? They may be migrating through Ohio right now on their way south.
- Q: tnx for answering :)
- a japanese girl, gets cancer from the atom bombs that were dropped in hiroshima in the 50's. she is about 12 years old. apparently as a traditional story goes, if you make a thousand paper cranes then you can get one wish or something. i cant remember full story sorry but i do have the book. =) made me cry. xx
- Q: i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
- Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
- Q: What is the admissible weight of a crane?
- Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
- Q: I have to answer some questions about an except from Where I Lived, and What I Lived For by Henry Thoreau. I don't need an explanation for all the metaphors he uses and what they mean, but what is he talking about with the Pygmy thing? Do the pygmies battle the cranes because... they want to eat them? Are cranes just d!cks? Is a crane some type of weapon?
- Thoreau, okorder /
- Q: No inspector would intentionally overlook a dangerous existing situation re: crane usage in a major city---so what went wrong--never before has this happened and now two majjor incidents?
- I believe they are accidents. Crane collapses happen. I had the dubious distinction of helping with the investigation a crane collapse that left the crane operator in an unrecognizable state. It's awful but these things do happen. Was there negligence in some cases on the part of the crane operator? Maybe.
Send your message to us
TOWER CRANE TC5013C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords