TOWER CRANE TC3807C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: Why is there as much evidence of Icabod Crane, as there is of god??
- Both tend to be works of fiction. As fictional characters go, Icabod Crane was far more likeable, and never coerced, threatened, maimed, tortured, or killed anybody. For that reason, I prefer Crane any day.
- Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q: I'm folding 1000 origami cranes for my upcoming wedding. It's a tradition. I'm trying to find a website that can show me how to make the cranes into a large picture or an idea for a mobile. I found some sites that show pictures of each, but nothing with a how to on it.
- from most of the pictures i saw, it seems pretty simple to figure out thinking of it logically. Origami cranes, string, wood sticks, Love and care. And with a bit of your own creativity and whatever supplies you can gather I think you will do a great thing. (making a paper crane now :)
- Q: How to improve tower crane industry in china?
- Powerful okorder ) manufacturing standards according to the rules of tower crane industry market economy. ?? Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
- Q: It got me thinking.
- I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
- Q: in the pit, i just lost my bike cuz johnny's crew tripped me with a chain. so no bike, and i only have my slingshot, skateboard, and some other useless stuff. dont say i can use my firecrackers or stik bombs cuz i dont have any in this pit. Also, my friend,... whatever his name is, he's there on top of the cars and junk and in the beginning he says something about a crane but i cant hear him. so everytime i pass under the crane... my conrtoller vibrates because the crane is supposed to pick up cars and such because its magnetic. so i already tried to see if when johnny goes under the crane it might pick him up because hes on a bike but it doesnt work. and i cant take him off of his bike and steal it either. i was thinking that would work because then whatshisface could pick me up with the crane.and when i try to hit him with my slingshot, it just doesnt work it would take me forever to knock him out with that puny little thing and he has a crowbar and he knocks me out so easily. HELP
- sorry, i have finisheded the game but not sure which part you are talking about.
- Q: How many meters of cranes should be in accordance with the anemometer?
- Tower crane type test items, technical requirements and test methods provides that: Boom root hinge point height of greater than 50m tower crane, should be equipped with anemometer. When the wind speed is greater than the working limit wind speed, the alarm can be issued to stop the operation. The anemometer shall be installed at the top of the tower without the wind.In fact, this is also the requirements of the type test rules for tower cranes and the safety technical specifications for crane overload protection devices.The answer is recommended dogmatism, mainly because the standard setters do not understand the actual situation of the construction, and not the outdoor crane need, need only part of crawler crane and tower crane installation, as the case may be other.Welcome to the emperor student - lifting expert Sina blog, my blog is committed to the dissemination of hoisting safety and professional knowledge.
- Q: I read a book a year ago about sadako sasaki who tried to make all 1000 paper cranes to live. Do you have to keep saying your wish over again when your making them, and when you finished making all 1000 how long did you wait until your wish came true??
- you make your wish once your done cause you only get the wish if you have 1000 cranes right so saying your wish when you only have 6 won't do anything. it can come true the next day till the next year or ten years it not something definite. I've never made 1000 but I think I will.
- Q: Is Fireplace Crane a modern term for the swing-out metal arms that hang over a fireplace for cooking? e.g. like in dutch ovens or pots/cauldrons that hang over a fire. It sounds like a more modern term and I need to know if there is an older term. Thanks.
- Fireplace Crane
- Q: how do you make one of them, put me through sep by step with photos.
- www.okorder /
Send your message to us
TOWER CRANE TC3807C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords