TOWER CRANE TC3807
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
- The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
- Q: I loved Dr. Crane and his sexy glasses and eyes. Plus, I just love Cillian Murphy, haha. Is his character back in the Dark Knight, I heard he was...but I was wondering if anybody could confirm it?
- Dr.Crane/Scarecrow is in the beginning of the movie and he gets his but kicked by Batman and gets arrested. It's not a big deal in the movie its just 10 minutes of action that makes people happy.
- Q: Safety rules for tower cranes
- Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
- Q: How does a person go about becoming a Gantry Crane Operator? And what is it like?
- First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
- Q: I just made origami cranes and want to hang them up, each by themselves with just a peice of string....how should i go about doing this? how is it usually done?
- TAke a needle threaded with a long piece of black thread, and make a small knot at end of long thread. Push the needle thru the middle of the crane's back and pull the thread all the way thru the hole till the knot catches. pull the needle off the loose end of the thread and make another knot on that end. take a push pin or thumb tack and push the pin thru the knot, then push the pin or tack into the ceiling. FYI, tape never works - I have tried. The black thread lets them flutter a bit, and is invisible most of the time. p.s. ask your parents if you can hang stuff from the ceiling first. they may not want you to do that since it will leave holes in the ceiling when you take them down.
- Q: An Episode Of War by Stephen Crane
- Crane saturates his writing with similes and metaphors.
- Q: If any of you have read The Red Badge of courage by Stephen Crane can you please tell me what you think about it. Is it a good book or is it not?!!!! Do you praise it or critize it !? i need your opinion what's your review! Thanks
- My Lord, I read that book over 30 years ago.....If I remember correctly, not that enthralled by it.
- Q: Building a new skyscraper? Tearing down the old Mellon Arena?
- Get ready for the new tower.
- Q: Is there a world record for making paper cranes?
- Yes! To commemorate the fiftieth anniversary of the dropping of the atom bomb on Hiroshima, two hundred thousand folded paper cranes were completed by December 15th 1995. Each crane had someone's name and peace message written on it. The intention is to preserve them to hand on to the 21st century. The event was sponsored by the Hiroshima International Cultural Foundation. There are other cool facts at the website below like the world's largest paper crane, most cranes in one hour, etc.
- Q: Four for crane, two for insurance, two for insurance. What does that mean?
- Four limit: torque, ultra high, variable amplitude, walking limit device. Two insurance: hook insurance and reel safety device.
Send your message to us
TOWER CRANE TC3807
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords