• TOWER CRANE QTZ63 TC5010  at wholesale offer System 1
  • TOWER CRANE QTZ63 TC5010  at wholesale offer System 2
  • TOWER CRANE QTZ63 TC5010  at wholesale offer System 3
  • TOWER CRANE QTZ63 TC5010  at wholesale offer System 4
TOWER CRANE QTZ63 TC5010  at wholesale offer

TOWER CRANE QTZ63 TC5010 at wholesale offer

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers

item

unit

parameter

Rated moment

kN.m

630

Max.load

t

5

tipload

t

1.095(2 rate)/0.989(4 rate)

Working radius

m

3 ~50

Height(free-standing/anchoring)

m

35/120

Self weight(wihout ballast)

free-standing/anchoring

t

24.1/48.5

ballast

10.5

Working temperature

0C

-20~+40

 

 TOWER CRANE QTZ63 TC5010  at wholesale offer

Q:They seem to be the tallest thing around, so what put them up?
Large cranes are built in sections imagine like an erector set. When there is a large building to be built the crane arrives in smaller easier to manage pieces and assembled on site.
Q:Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
Q:Tower crane, this model inside each letter number represents what meaning, ask the great God to inform.TCT7527-20, TC6015A-10E
Two, weight: rated lifting weight and maximum weight. The maximum rated lifting weight refers to the biggest boom in quality to allow the minimum amplitude of the tower crane, is one of the main technical parameters of the tower crane. Three, lifting...
Q:I don't understand why or how they still exist. I know I'll get some answers saying they're part of the food chain but what animal on earth would get a sufficient meal from one of these?
crane flies are very large. They might also play a part in pollination I'm not sure. I've never looked at the gawky insects before edit larave are decomposers in soil adults don't feed. So then the maggots are for the recycling of decayed matter. Thats their point. my info came from my field guide that is next to my bed at all times
Q:I was interested in the Japanese legend of folding a thousand cranes. It was said that if a person was able to fold 1 000 cranes, you get to make a wish.I'm just wondering; let's say I'm done with all 1 000. What do I do next? One of my friends told me you had to burn all one thousand cranes, while another suggested to put the last one in a bottle and set it out in sea.Did it ever state what to do in the end, after folding all the cranes? If it does, please enlighten me :3Thank you :)
I've only heard of putting them up on strings and you could give them as gifts .. Oh and you could also frame them by laying them flat
Q:What is the insulation resistance of tower crane?
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.
Q:Please help!
this would help you i hope good luck researching
Q:i live in cali and these things are really starting to piss me off!!!!!!! I never noticed any before ( when i lived in colorado) but it seems lately that they are all over!!!! every time i open my damn door AT LEAST 5 of them come in! THERE SO GROSS with there big hanging legs! EWWWWW! Anyways, when will they go away and what do i do to keep them from getting in my house?
The crane fly season only last for a month or so. There are years when they can reach almost plague proportions but within another 2-3 years their numbers should return to normal.. They can cause some damage to farm crops but the good news is that they are harmless to us.
Q:how do you make one of them, put me through sep by step with photos.
www.okorder /
Q:because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords