TC7015 tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC7015 tower crane is hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 400 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~50 | ||
Maximum amplitude lifting capacity | t | 0.8 | ||
Lifting height | Independent | m | 29 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 50.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 8.54 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
(1)4-magnification Lifting Performance Table
Amplitude(m) | 3-10.966 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
Lifting capacity(t) | 4 | 3.98 | 3.64 | 3.36 | 3.10 | 2.89 | 2.70 | 2.54 | 2.39 | 2.26 | 2.14 |
Amplitude(m) | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
Lifting capacity(t) | 2.04 | 1.94 | 1.85 | 1.77 | 1.69 | 1.62 | 1.56 | 1.50 | 1.45 | 1.39 | 1.35 |
Amplitude(m) | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 |
Lifting capacity(t) | 1.30 | 1.26 | 1.22 | 1.18 | 1.14 | 1.11 | 1.08 | 1.05 | 1.02 | 0.99 | 0.97 |
Amplitude(m) | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | |||
Lifting capacity(t) | 0.94 | 0.92 | 0.89 | 0.87 | 0.85 | 0.83 | 0.81 | 0.80 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-21.4 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | |
Lifting capacity(t) | 2 | 1.94 | 1.85 | 1.77 | 1.69 | 1.62 | 1.56 | 1.50 | 1.45 | 1.39 | |
Amplitude(m) | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | |
Lifting capacity(t) | 1.35 | 1.30 | 1.26 | 1.22 | 1.18 | 1.14 | 1.11 | 1.08 | 1.05 | 1.02 | |
Amplitude(m) | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | |
Lifting capacity(t) | 0.99 | 0.97 | 0.94 | 0.92 | 0.89 | 0.87 | 0.85 | 0.83 | 0.81 | 0.80 |
- Q: HSE Officers can better answer this question or a qualified Crane operator it self can explain.
- each crane is so different. it depends on the rated crane load, the lifted distance from the crane and actuall load to be lifted. Each crane an envelope of angles to the horizontal, lifted load, and distance from the crane. The crane operator must insure that he is within this envelope or the crane may topple over. Also, the wind at the time of the lift must be considered. If you can picture a seesaw with loads pivoting about a fulcrum. When two people are on the seesaw, one person is the crane and the other is the load to be lifted. Only in the case of a crane, the fulcrum is at the crane itself with a large dead load counter weight behind the cab operator.
- Q: Describe how a bottleneck event reduces genetic diversity in a population, and specifically how this has affected the current population of whooping cranes in the U.S
- Well, a bottleneck reduces the number of organisms in a population or species down to a much smaller number than previously existed. In the case of the whooping crane, the species underwent a bottlenck event (although what it is I'm not sure), leaving us with less than 12 individual birds. The more widely accepted number of 6-8 birds has given rise to the several hundred whooping cranes alive today. Since only half a dozen sets of genes were used to create the several hundred, there is not much genetic variability.
- Q: the highest ranking American serviceman, at least in the so called prison camp
- no, he was brutally murdered
- Q: Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
- It's not a cable, it's a steel bar! Scaffolding
- Q: In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
- Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
- Q: It got me thinking.
- I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
- Q: in the pit, i just lost my bike cuz johnny's crew tripped me with a chain. so no bike, and i only have my slingshot, skateboard, and some other useless stuff. dont say i can use my firecrackers or stik bombs cuz i dont have any in this pit. Also, my friend,... whatever his name is, he's there on top of the cars and junk and in the beginning he says something about a crane but i cant hear him. so everytime i pass under the crane... my conrtoller vibrates because the crane is supposed to pick up cars and such because its magnetic. so i already tried to see if when johnny goes under the crane it might pick him up because hes on a bike but it doesnt work. and i cant take him off of his bike and steal it either. i was thinking that would work because then whatshisface could pick me up with the crane.and when i try to hit him with my slingshot, it just doesnt work it would take me forever to knock him out with that puny little thing and he has a crowbar and he knocks me out so easily. HELP
- What you have to do is knock out all of Johnny's friends who are above you shooting things down at you. Use your sling shot to knock them out. It will take 2-3 shots for each guy. This will allow your friend to run around to the magnetic crane and start it up for you. Once Johnny goes under the crane, he will lose his bike. Then he'll be on foot, and will be a little easier to kill. Try to make sure you keep as much energy as you can while you're getting rid of Johnny's friends (run around alot so what they shoot at you won't hit you), because you'll need the energy to finish off Johnny. Good luck!!
- Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
- actually okorder
- Q: What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
- the lift capacity of the Crane is pretty much dictated by the type of crane it is. The largest Gantry / Bridge type is capeable of 1,500 tons.. the largest tower is 100 tons w. a 100meter turning radius. Tracked lattice boom type is 1,600 tons...........(self contained) there's one that will do 4000 tons with modifications including seperate tracks for counterweights
- Q: Are sandhill cranes edible?
- yeah, but they are a little tough and taste sort of like Mexican Spotted Owl
Send your message to us
TC7015 tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords