• QTZ63(5010) tower crane System 1
  • QTZ63(5010) tower crane System 2
  • QTZ63(5010) tower crane System 3
  • QTZ63(5010) tower crane System 4
QTZ63(5010) tower crane

QTZ63(5010) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5010) tower crane is hoisting and conveying machinery which is designed by our company by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 700kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 32.2kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.
2. Lifting Technical Performance

2.1 Lifting Performance Table and Lifting Performance Curve

(1)4-magnification Lifting Performance Table(48m)

 

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

25.5

Allowable working temperature

0C

-20~+40

2.1 Hoisting and Lifting characteristic curve characteristics table

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-12.5

13

14

15

16

17

18

19

20

21

22

Lifting capacity
(t)

4

3.832

3.534

3.276

3.050

2.850

2.673

2.514

2.371

2.242

2.124

Amplitude(m)

23

24

25

26

27

28

29

30

31

32

33

Lifting capacity
(t)

2.017

1.918

1.828

1.744

1.667

1.595

1.528

1.466

1.407

1.353

1.301

Amplitude(m)

34

35

36

37

38

39

40

41

42

43

44

Lifting capacity
(t)

1.253

1.207

1.164

1.124

1.085

1.048

1.013

0.98

0.949

0.918

0.89

Amplitude(m)

45

46

47

48

49

50

Lifting capacity
(t)

0.862

0.836

0.811

0.787

0.764

0.742

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-23.9

24

25

26

27

28

29

30

31

32

Lifting capacity
(t)

2

1.99

1.90

1.81

1.74

1.66

1.60

1.53

1.47

1.42

Amplitude(m)

33

34

35

36

37

38

39

40

41

42

Lifting capacity
(t)

1.37

1.32

1.27

1.23

1.19

1.15

1.11

1.07

1.04

1.01

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity
(t)

0.98

0.95

0.92

0.90

0.87

0.85

0.82

0.80

 

Q: He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
Q: Would David have made a better babysitter than a crane driver?
none of the crane accidents were fatal, a black lad was slightly injured though
Q: I was just wondering this since I come from Northern Ireland and in Belfast I think they're probably the most prominent landmark but are they actually famous and if you saw them would you know where they were?
I okorder
Q: my father has his forklift and crane license. he needs to know how long they're vaild for
should be good ror 3 years from the date he got it i just got mine new one last month for a sit down fork lift and crane/ trolly and its good till march 2010
Q: I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q: my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
Q: I want this as a tattoo but I want to know what it means. Why type of tree is it? What do the symbols translate into?
This okorder /
Q: What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
The okorder /
Q: What do the words neck-craning and neck-straining mean in the sentence below?Sports cars are often designed to make a statement, and many of the newest models do that with neck-craning styling and neck-straining performance.
'Neck-craning' in this context I think means to crane your neck around to see all angles of the presumably beautiful styling. Neck-Straining in this context I imagine refers to the G-Force experienced from acceleration provided by the high-performance sports-car.
Q: Which one is a better investment? I can get both for 200dollars
Probably an engine crane (engine hoist). Engine support you still need to lift the engine for the engine support. You hardly ever need to maneuver the engine to do a timing belt. Edit: I have one of the portable lifts what some refer to as a cherry picker. I've never had the need for an engine support.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords