• Tower Crane of Chang Li Model Number QTZ40(TC4808) System 1
  • Tower Crane of Chang Li Model Number QTZ40(TC4808) System 2
  • Tower Crane of Chang Li Model Number QTZ40(TC4808) System 3
Tower Crane of Chang Li Model Number QTZ40(TC4808)

Tower Crane of Chang Li Model Number QTZ40(TC4808)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
60 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ40(TC4808)  Description

Feature: Tower Crane

Condition: New

Application: All kinds of costruction

Rated Loading Capacity: 4T

Rated Lifting Moment:500/630/800/1000/1200KN.m

Max. Lifting Load: 4T

Max. Lifting Height: 150m

Span: 42M

Place of Origin: Henan, China (Mainland)

Brand Name: Yu Jie

Model Number: QTZ40(TC4808) 

Certification: ISO,CE,BV,SGS

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Tip Load: 0.8

Trolley travel speed: 38/25m/min

Slewing speed: 0.6r/min

Jacking up: 0.4m/min

Powed: 380V/50HZ

Lifting character: 2/4 Fall

QTZ40(TC4808)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ40(TC4808)  Specification

 Tower Crane of Chang Li Model Number QTZ40(TC4808)

QTZ40(TC4808)   Pictures

Tower Crane of Chang Li Model Number QTZ40(TC4808)

Tower Crane of Chang Li Model Number QTZ40(TC4808)

Tower Crane of Chang Li Model Number QTZ40(TC4808)

QTZ40(TC4808)  FAQ

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



 

 


Q:total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
Paul does 100 cranes in 5 hours So in 1 hour he does 20 cranes In 3 hours he does 60 cranes and balance 40 cranes Jon does Jon = 40 cranes in 3 hours So 100 cranes = 100/40 X 3= 7.5 hours ANSWER
Q:What were author Stephen Crane's war beliefs?Details would be nice... what were his views on war and what do you base it on?
The Pluralistic Philosophy of Stephen Crane by Patrick K Dooley - 1994 The Poetry of Stephen Crane by Daniel G Hoffman, Professor Danlel G Hoffman - 1971 - 304 pages the sources of Crane's philosophy and art are as yet undeciphered I know he was a son of a Pastor, did not live long and I never liked his RBC book (Red Badge of Courage RBC the term for red blood Cells), but hope the above help.
Q:we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q:im 35 and in august i get my license back and i am going after my childhood dream of being a crane operator and was wondering how i need to go about achieving this?
I am sorry I do not know where are you from as different country might have different requirement on getting a Crane Operator licence. Anyway, I believe the basic is the same: You need to attend a theory class on crane operations which usually include topics like design theory of cranes, slinging and lifting, signalling. After this, there will be a practical session to test your understanding and practical operations on an actual crane in the training center's facility. Good Luck and May You Attain You Dream :)
Q:I'll be graduating from a Korean language extra school in 1,5 years, and one of the teachers there is really amazing. Essentially, she has taught me the most compared to any other teacher there.Would giving her a 1000 cranes (and a bouquet maybe?) an appropriate and good 'thank you and goodbye' gift? Is it too little? Or overkill? She really means a lot so I want to give something!
I think that gift would be perfect for a teacher! If I was a teacher and a student gave that to me i'd cry. Have you heard about that book of the 1000 paper cranes? (Can't remember the name) but it says if you make a 1000 paper cranes then you get a wish. Well anyways make sure you present the presents nicely. Like put the cranes in a pretty jar with a beautiful ribbon wrapped around it and get flowers that're her favorite colors.
Q:Who do you think would win in a battle between Roger Thorpe and Alistair Crane?
HI! I didn't know there was another character named Roger Thorpe. I remember a character named Roger Thorpe on the Guiding Light years ago.
Q:Who would win a fight between a Whooping Crane and a chinchilla?
The crane. He's got the moves.
Q:What are the impacts of construction cranes on the human society?
construction cranes enabled the building of multiple story buildings which fostered urbanism. It changed the village oriented way of life in America, for good and bad. We became more boadly oriented in our business ventures which increased the stanting of the U.S. in world affairs, but it decreased the degree of brotherhood people felt for each other as they left their roots and dwelt amongst relative strangers.
Q:I know that the whooping crane population recovered through captive breeding but how many are left currently (right now).
There were 535 total in 2009--the population increased slightly last year but I have not seen a total for the population of 2010. Deaths can occur at any time so the number changes constantly. The Journey North site counts 281 adults in the wild western population and 106 birds in the reintroduced eastern flock. They did not give a number for the birds in captivity so I cannot give you a total. You can follow the reintroduced whooping crane population and their migration each spring and fall on the Journey North (in fall called Journey South site). They also track song birds and hummingbirds and monach butterflies.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords