• Tower Crane China Factory with CE/ISO Certificates System 1
  • Tower Crane China Factory with CE/ISO Certificates System 2
  • Tower Crane China Factory with CE/ISO Certificates System 3
  • Tower Crane China Factory with CE/ISO Certificates System 4
  • Tower Crane China Factory with CE/ISO Certificates System 5
  • Tower Crane China Factory with CE/ISO Certificates System 6
Tower Crane China Factory with CE/ISO Certificates

Tower Crane China Factory with CE/ISO Certificates

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1.3-6T      Rated Lifting Moment:63KN.M            Max. Lifting Load: 6T

Max. Lifting Height: 141.5M         Span: 2.5-50M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5013B(QTZ63)           Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):41.5          Max. Working Range(M): 50

Tip Lifting Weight(T): 1.3          Working Range(M): 44,50                Climbing speed(M/MIN): 0.58

Counterweight(T): 13.05             Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*2500(Intergrated type)             


Main Features of Tower Crane


1. TC5013B(QTZ63)   have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013B(QTZ63)  tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.


7. Trolleying mechanism can provide two operation speeds.


8. With scientific layout and beautiful appearance.

 

9.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

10.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

Tower Crane China Factory with CE/ISO Certificates


Tower Crane China Factory with CE/ISO Certificates

Tower Crane China Factory with CE/ISO Certificates


 

Images of Tower Crane

Tower Crane China Factory with CE/ISO Certificates

Tower Crane China Factory with CE/ISO Certificates

Tower Crane China Factory with CE/ISO Certificates

Tower Crane China Factory with CE/ISO Certificates

Tower Crane China Factory with CE/ISO Certificates


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q: Tower crane railing height is greater than or equal to meters
GB 6067 requires the height of the railings of the crane to be 1050mm, and a horizontal bar with a spacing of 350mm shall be provided. The bottom should be set at a height of not less than 70mm.
Q: When the earthquake happened, the children wanted to know what they could do to inform other students and raise awareness for the people in Japan. So, we decided to do a show on the earthquake, and to also making the cranes, the origami cranes.thank you! a foreigner. (detail)
To also make the cranes is the correct way to say it. To also making the cranes is incorrect.
Q: I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
The use other large cranes. They put them up there piece by piece, and sometimes use cranes on the ground to hold pieces up while they assemble them.
Q: Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q: I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q: I read the book and thought of a theory... I think that the headless horseman is just and alter ego Brom Bones alter ego and he wanted to kill Brom Bones for his beloved Katrina Van Tassel... I want to hear your opinions and theories possibly involving what you think Katrina said to Ichabod during the party. That would be nice thank you.
Ichabod crane was murdered by the headless horseman after he ventured into the woods alone.
Q: How were Churches and really tall buildings constructed hundreds of years ago before the invention of cranes?
Cranes existed in different forms than today for a really long time. Just, they used pulley systems are were human, animal, or even water powered. They might be the single greatest part of how the Roman empire was built outside of the invention of concrete.
Q: for example: erection, technical data...
Well now Slartybardfast may be tried lol but he is correct give him the points lol.
Q: how do you make an electromagnet crane?
Well I guess you would need a big electromagnet, a large power source and a crane. You would need to wind a huge coil around an iron bar, feed it with lots of direct current and stick it on a crane.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords