• Tower Crane Spare Parts with CE certificate System 1
  • Tower Crane Spare Parts with CE certificate System 2
  • Tower Crane Spare Parts with CE certificate System 3
  • Tower Crane Spare Parts with CE certificate System 4
  • Tower Crane Spare Parts with CE certificate System 5
Tower Crane Spare Parts with CE certificate

Tower Crane Spare Parts with CE certificate

Ref Price:
$20,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
4T
Maximum Lifting Height(M):
110M
Rated Loading Capacity:
0.8T
Span:
48M
Rated Load Moment:
60KM

Detail of Tower Crane


Feature:Tower Crane 

Condition:New         

Model Number:TC4808(QTZ40) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 



Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.


Specification of Tower Crane

 

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjustedm

384348

Min working rangem

2.25

Max lifting capacityt

4

Tip load @ 48mt

0.8

Hoist mechanism

Falls

2

4

Lifting capacityt

1

2

2

2

4

4

Speedm/min

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speedm/min

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speedm/min

0.4

Counterweightt

7.6

Mast section sizeL×W×Hm

1.4×1.4×2m

Working temperature

-40+60

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

Loading diagram

 

48m jib length

R

12

14

16

18

20

22

24

26

a=2 (t)

2t---20.7m

1.87

1.70

1.56

a=4 (t)

4t—10.95m

3.61

3.04

2.62

2.30

2.04

1.84

1.67

1.53

R

28

30

32

34

36

38

40

42

44

46

48

a=2 (t)

1.44

1.34

1.24

1.17

1.09

1.03

0.98

0.93

0.88

0.84

0.80

a=4 (t)

1.41

1.31

1.21

1.14

1.06

1.00

0.95

0.9

0.85

0.81

0.77

43m jib length

R

12

14

16

18

20

22

24

26

a=2 (t)

2t---21.2m

1.92

1.75

1.61

a=4 (t)

4t—11.25m

3.72

3.13

2.7

2.37

2.10

1.89

1.72

1.58

R

28

30

32

34

36

38

40

42

43

a=2 (t)

1.48

1.37

1.28

1.20

1.13

1.06

1.01

0.95

0.93

a=4 (t)

1.45

1.34

1.25

1.17

1.10

1.03

0.98

0.92

0.9

38m jib length

R

12

14

16

18

20

22

24

26

a=2 (t)

2t---21.9m

1.99

1.81

1.66

a=4 (t)

4t—11.58m

3.84

3.23

2.78

2.44

2.17

1.96

1.78

1.63

R

28

30

32

34

36

38

a=2 (t)

1.53

1.42

1.32

1.24

1.16

1.10

a=4 (t)

1.50

1.39

1.29

1.21

1.13

1.07


Images of Tower Crane


Tower Crane Max. lifting Weight 10T  in China

 

 

Tower Crane Spare Parts with CE certificate

Tower Crane Spare Parts with CE certificate

Tower Crane Max. lifting Weight 10T  in China


FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q:I give up...Somebody who understands The Decemberists please tell me what a Crane's Wife is and what the song is about. I love the song, I sing along loudly, but I don't have a clue.
I found this on wikipedia. The Crane Wife is an old Japanese tale. While there are many variations of the tale, a common version is that a poor man finds an injured crane on his doorstep (or outside with an arrow in it), takes it in and nurses it back to health. After he releases the crane, a woman appears at his doorstep with whom he falls in love and marries. Because they need money, his wife offers to weave wondrous clothes out of silk that they can sell at the market, but only if he agrees never to watch her making them. They begin to sell them and live a comfortable life, but he soon makes her weave them more and more. Oblivious to his wife's diminishing health, his greed increases. He eventually peeks in to see what she is doing to make the silk she weaves so desirable. He is shocked to discover that at the loom is a crane plucking feathers from her own body and weaving them into the loom. The crane, seeing him, flies away and never returns.
Q:I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
Q:You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
from the ground up
Q:If you make 1000 origami cranes is it true that you will get a wish or good luck. This is based on a Japanese myth
It's like asking: If you make a wish on a shooting star, will it come true? Although both are nice gestures, no it will not come true. Origami cranes are simply pieces of paper that are folded to resemble birds; no matter how many you make, they will not take on supernatural abilities such as wish-granting.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame.
Q:any one can give me address for forged hook for crane?
here okorder /
Q:MP: Do you do any origami?MP: How bored are you at the moment?MP: What do you think of this She Wolf song by Shakira?I can't really form an opinion on it.
MP: Used to. MP: Very. MP: I'd bang her...she's really hot except for the part at the end. I'm ashamed to think this. I think it's her dancing.
Q:A. Load capacityB. Fluid leaksC. Clearance for swing radiusD. Wire rope wear and sheavesE. All of the above must be inspected before operating a crane
A. Load capacity and C. Clearance for swing radius have nothing to do with a Crane inspection. ______________________________________... E. All of the above must be inspected before operating a crane. Is a totally different question. Before operating a crane, B. Fluid leaks C. Clearance for swing radius D. Wire rope wear and sheaves need inspection. Wingman
Q:Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
No you guys, he is actually in the nba Ty Crane but he retired because he wasnt good enough

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords