Tower Crane Chinese Leading Supplier with ISO,CE
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of TC4804 Tower Crane
Feature: Tower Crane
Condition: New
Max.Lifting Load: 4T
Span: 40m
Place of Origin: China(Mainland)
Model Number: TC4808
Characteristics of TC4808 Tower Crane
1) TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 110m.
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specifications of TC4804 Tower Crane
Technical Sheet for TC4808
Independent height (m) | 31.5 | ||||||
Max height with attachment (m) | 110 | ||||||
Working range can be adjusted(m) | 38、43、48 | ||||||
Min working range(m) | 2.25 | ||||||
Max lifting capacity(t) | 4 | ||||||
Tip load @ 48m(t) | 0.8 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 1 | 2 | 2 | 2 | 4 | 4 | |
Speed(m/min) | 70 | 35 | 7 | 35 | 17.5 | 3.5 | |
Motor | YZTD225M2-4/8 /32 15/15/3.5KW | ||||||
Trolleying mechanism | Speed(m/min) | 20/40 | |||||
Motor | YDEJ100-4 /8 2.4/1.5KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YD132S-6/8 2.4/1.8KW | ||||||
Climbing speed(m/min) | 0.4 | ||||||
Counterweight(t) | 7.6 | ||||||
Mast section size(L×W×H)m | 1.4×1.4×2m | ||||||
Working temperature | -40-+60℃ | ||||||
Total power (KW) | 23 | ||||||
Power supply requirement (KVA) | 115KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||||
Startup voltage & current | 380V×95%=361V 180A | ||||||
Rated working voltage & current | 380V 65A |
Images of TC4804 Tower Crane
FAQ of TC4804 Tower Crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
- B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
- Q: I'm confused about one of the final scenes, where Seneca Crane is locked in the room with the nightlock berries. Does this mean that he is supposed to eat the berries and presumably die? Or is it symbolism of some sort of distaste in the way he ended the Games?
- Yes, although it is only a movie adaptation; it isn't supposed to be mentioned in the first book. In Catching Fire, the second book of the trilogy, President Snow hints to Katniss that he had Seneca Crane executed because of his decision to let allow both Katniss and Peeta to emerge as victors, but his exact method of doing so was never mentioned; in the movie, it just reinforces this and heavily implies that the method of Seneca's execution is to lock him in a room with absolutely nothing but the nightlock berries, forcing him to commit suicide or eventually starve to death.
- Q: Please no direct translations. I need the official name of the whooping crane in French.
- Grue Blanche is correct =)
- Q: Do the characters develop a sense of brotherhood. If so will it be temporary or permanent
- They absolutely do - as anyone who has ever tried to row a boat with another person can understand. The key here is the correspondent who is described as someone who has developed a distrust for people. He has seen a lot of things and as a reporter, he has kind of trained himself to view them impartially and not become involved. Crane discusses that when he talks about the correspondent seeing the dead soldier in Algiers. However, now his basic survival depends on him becoming involved with people. He has to take orders from the captain. He has to take turns rowing with the oilman. Eventually when the boat becomes too heavy, they take turns holding on from the water. It's basic survival now and the only way it works is by them developing a brotherhood and working as a team. I dont think it will be permenent - the correspondent will go his own way - back to reporting. However I think that he will take with him a new view of people - an empathy which will make him a better correspondent. Pax - C.
- Q: would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
- wow. im helpful anybody tried it!! why : the recommendations co-ordinates the strikes of the finished physique. fairly the arms and the ft, so once you're turning your appropriate foot in clockwise path, with the help of drawing 6 jointly with your hand, that's an ANTI-CLOCKWISE circulate, the recommendations then makes the foot circulate anti-clockwise. Thats how suitable GOD made us!!
- Q: The cantilever part has to stay at least 6-12 inches off the ground.
- Then how are you interlocking the popsicle sticks? Most projects like this allow for thread and glue. OK.. so you can glue them and, I assume, cut them. Use a truss system made out of small pieces of split sticks to build and strengthen the support of your crane and make that long arm out of a series of sticks that form an interlocking triangle when you look into the arm. Stagger the triangle pieces so that no two joints are in the same location and then glue small splints to the inside of the long pieces.at ecah of those joints. If you have no weight limit and the support column will hold it, consider filling the triangle with a coating of glue.. be sure to allow several days for it to dry. That way the glue will also add an element of strength Take your tme, use a strong glue if you have that option - like Gorilla Glue, ,and build it in sections. Be sure to let the glue dry fully before moving on to the next stage. For the triangle portion, you can use thread to bind the pieces into a triangle shape until the glue dries and then remove the thread and use light sand paper to remove any residue. for the counterweight of the cantilever, fashion a small box out of pieces of sticks and fill it with a dense glue. As the glue hardens and compacts add more glue. When the glue has fully dried, remove the sticks unless you are still within your 150 count. That way the glue serves two functios and your instructions do not prohibit this. Hope that helps
- Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
- In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.
- Q: ok I found an injured crane what do I feed it?
- Cranes are omnivores. But I would feed crane with vegetarian stuff like grain, berries, plants, roots, seeds, stems, bulbs, fruits, nuts. But if you want make it non vegetarian then rodents, fish, amphibians, snakes, rodents, lizards, small fish, frogs, shellfish, mollusks and crustaceans.
- Q: I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
- Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
- Q: how do they erect those large tower cranes you see on big building projects?
- A tower crane is usually assembled by a telescopic jib (mobile) crane of greater reach (also see self-erecting crane below) and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will often be lifted to the roof of the completed tower to dismantle the tower crane afterwards
Send your message to us
Tower Crane Chinese Leading Supplier with ISO,CE
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords