• 8T Tower Crane Supplier with CE ISO Certificate System 1
  • 8T Tower Crane Supplier with CE ISO Certificate System 2
  • 8T Tower Crane Supplier with CE ISO Certificate System 3
8T Tower Crane Supplier with CE ISO Certificate

8T Tower Crane Supplier with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane 8T Tower Crane Supplier with CE ISO Certificate

1,The tower crane is advanced in parameters,

2,reliable in performances,

3,beautiful in appearance,

4,high in quality,

5,simple in structure and easy in operation.

6,It is equipped with advanced safety devices and is easy for repair and maintenance, safe for use and reasonable in pricing, for which it has become an ideal choice for many construction enterprises.

Main Features of 8T Tower Crane Supplier with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

8T Tower Crane Supplier with CE ISO Certificate

8T Tower Crane Supplier with CE ISO Certificate

8T Tower Crane Supplier with CE ISO Certificate

8T Tower Crane Supplier with CE ISO Certificate

8T Tower Crane Supplier with CE ISO Certificate

8T Tower Crane Supplier with CE ISO Certificate

Tower crane Specifiction

8T Tower Crane Supplier with CE ISO Certificate

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
The okorder
Q: Between these two authors, I dont see any similarities in literary style, specifically focusing on The Moon is Down and The Red Badge of Courage. Maybe observing from a different point of view (yours) could help me.Also, if there is no significant similarity, do similarities exist in setting, conflict, or characters instead?Thanks!
Try Maggie: A girl of the streets, which is the novel I think of for Crane being part of the Realist school. I think you can also see Steinbeck, in his selection of subjects as being in that same school of fiction. So less for their style and more for their choice of subjects.
Q: Equipment safety of tower crane
Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
Q: Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q: Interesting facts about the short story writer, Stephen crane.
Susie, I am sorry I missed the original question so I don't know what the norm may be. I tend to side with CC. Why compare one country or person to another? Why is being 5 years behind (if that is the case) the rest of Europe bad? One of the heirs to Sam Walton's fortune (huge, monolithic discount store in the USA, Wal Mart) drives a Ford F 150 pickup truck (a run of the mill, average, regular vehicle) certainly not commiserate with the funds she has available to spend. She choses to be 'behind the times' so to speak. Who ever said that all technology is beneficial? Whoever said that having electronic relationships via the internet is better than greeting, smiling and talking with your neighbor? Personally, I would rather be a little anachronistic than futuristic. But that's me. And I have great respect for you and your country. Is it 5 or 10 years behind anybody? I don't know. Is it better or worse than anybody? I don't know. Is it different from anybody? Absolutely, and I am glad for it.
Q: What does "automatic tower crane" mean less than 100 tons per metre?
The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
Q: What are the main technical parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q: Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
Crane Fireball Ignition
Q: Who was the guy called the Headless Horseman in the story of Ichabod Crane?
A Lib

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords