• TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate System 1
  • TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate System 2
  • TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate System 3
TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

1, TC5013A have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013A tower cranes are famous for their large operating ranges, varied working methods and wide uses.   

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate Images

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

Tower crane Specifiction

TC5013A 6T Mobile Tower Crane for sale with CE ISO Certificate

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

 

About CNBM

 

CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q: i saw a PS3 in a claw crane game at Six Flags Over Georgia i wonder how you can win it. It is possible to win it... somehow. I thought that the strategy was to lift the prize that is closest to the hole. I almost won a Kinect that way. So are there any other strategies??? Don't say buy 1 or there isnt a way to win because there is.
The crane machines work in such a way as to only make the claw strong enough to hold prizes after a certain amount of attempts so as to limit the amount of prizes taken.
Q: how do they get the construction crane onto the the tall buildings?
If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
Q: What is the calibration value of a tower crane?
Three, gravity moment MThe product of amplitude L and the corresponding lifting objects called Q gravity lifting moment, the unit is kN - M.Tower crane capacity is based on lifting moment representation. It uses the product of the maximum working range and the corresponding maximum lifting load as the calibration value of the lifting moment.Four 、 lifting height HIt refers to the vertical distance from the surface to the parking level of the crane sling allows the highest position. The unit is m.Five, work speed1. lifting speed (down) Vn - stable state of motion, the vertical displacement velocity of the rated load. The unit is m/min.2. crane (CART) running speed of Vk, stable state of motion, the running speed of the crane. The operating speed of a crane with rated load on the horizontal (or horizontal rail) surface, at the height of 10m away from the ground, and when the wind speed is less than 3m/s.
Q: Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q: Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q: When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q: I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
Q: did stephen crane win any awards?
Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
Q: .......rated by the ________ weight it will lift at a ________ radius and ________ boom length.A. Maximum; minimum; maximumB. Minimum; maximum; maximumC. Maximum; minimum; minimum
C. Maximum; minimum; minimum A Crane is rated by the MAXIMUM weight it will lift at a MINIMUM radius, usually 10 feet from the house pivot center, and the MINIMUM Boom Length. Wingman
Q: Does anyone knows where could I find this book online and free ? I would love to read it from my tablet or computer
The Lost Language of Cranes is a novel by David Leavitt, first published in 1986. So the author wasn't thinking about ebooks back then and never signed a contract to make ebooks. See if your public library has a copy in paper. Amazon sells it in paperback and hardcover. Anyone that has a copy for free has stolen intellectual property and is cheating the author and publisher.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords