Tower Crane TC5013B for Malaysia Market
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC5013B Description
Feature: Tower Crane
Condition: New
Application: Construction
Max.Lifting Load: 6T
Max Tip Load:1.3T
Independent Height:41.5M
Max Lifting Height: 141.5M
Span: 50m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TC5013B
Packaging & Delivery of Tower Crane TC5013B
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Feature of Tower Crane TC5013B
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC5013B Specifiction
Free standing height (m) | 41.5 | ||
Max height with attachment (m) | 141.5 | ||
Working range can be adjusted(m) | 44、50 | ||
Min working range(m) | 2.5 | ||
Max lifting capacity(t) | 6 | ||
Tip load @ 50m(t) | 1.3 | ||
Hoist mechanism | Falls | 2 | 4 |
Lifting capacity(t) | 1.5-3 | 3-6 | |
Speed(m/min) | 0-80 | 0-40 | |
Motor | YZRDWF225M-4/8-24/24KW | ||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |
Motor | YZTDE132L-4/8/16-3.3/2.2/1.1KW | ||
Slewing mechanism | Speed(r/min) | 0-0.6 | |
Motor | YZR132M2-6-3.7KW×2 | ||
Climbing speed(m/min) | 0.58 | ||
Counterweight(t) | 44m jib length | 50m jib length | |
12 | 13.05 | ||
Mast section size(L×W×H)m | 1.6×1.6×2.5m ( seamless tube type ) | ||
Working temperature | -40-+60℃ | ||
Total power (KW) | 37 | ||
Power supply requirement (KVA) | 170KVA for generator | ||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||
Startup voltage & current | 380V×95%=361V 170A | ||
Rated working voltage & current | 380V 108A |
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view
- Q: how tower crane extend it heights?
- A tower crane is actually physically attached to the structure it is helping to build. As the building goes up, they raise the tower crane using a series of jacks that are attached to the floors, so the crane can go as high as the building does.
- Q: In the private training session, Katniss Everdeen creates a noose, hangs a practice dummy, and uses the paint to write: Seneca Crane. I know this name is mentioned earlier in the book, but I don't remember who Seneca Crane is... Remind me, please?
- Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.
- Q: I want to join
- Madras Institute Of Heavy Machinery in Thirumullaivoyal No 45, Thirumullaivoyal, Mth Road, Thirumullaivoyal, Chennai - 601209 (44)-26384031, 26382363, 26381739
- Q: In Scottsdale AZ I have never noticed them before this year. They are on the walls all around our doors.
- Crane FLIES not cranes. The winter crane fly has an abundant hatch--well, during early spring or late winter. In this they are just everywhere--this species just does this sort of thing. Typically crane flies are a rather rare sight, such as during the summer months, usually of an entirely different species. There's really not much to explain their abundance.
- Q: The truck has a Comprehensive Motor insurance cover. There is no exclusion in the policy in respect of tools of trade.
- The crane and the truck are one and the same vehicle, so I can't see why a claim on fully comp. wouldn't be valid. If this is not the case, then the crane IS the cargo, so surely the claim would go to the insurer of the crane, and not the lorry.
- Q: can some one give me contact details for O & K Marine Crane Manufacturer?
- there okorder /
- Q: I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
- The Capitol is a government that rules through absolute control. They're keeping the different areas under control through force, and everybody is too afraid of being killed to stand up to them. The Hunger Games are there to make people afraid of revolting and to give them some hope of one day becoming famous. Crane got killed because he allowed Katniss and Peeta to beat the game. The point of the Hunger Games is that there can only be one victor, but Katniss let them both live. By doing that, she showed that the Capitol couldn't control everyone absolutely, and they could beat the Capitol if they tried. Crane got killed because he let that happen. It also drives home to the reader how brutal Snow can be, and how willing to throw away a life he is.
- Q: I'm into urban exploration and basically the one thing I haven't done is climb a crane. I don't actually know where one is that I could climb, but I definitely will do it someday. I'm just wondering how illegal it would be? Also, don't give me any it's not safe bull, I'm perfectly confident in my abilities and ready to accept the consequences if I get caught.
- Not at all if you don't get caught. However cranes are private property, you'll get your a.ss handed to you if you get caught.
- Q: Can anyone give me a summary of The Veteran by Stephen Crane?
- I okorder /
- Q: What are the common problems encountered in hiring cranes for house constructions?
- Access, I assume you need a Franna. Possibly for frames and or trusses to the second level or steel beams. You will be limited by reach if the crane can only access the front of the house. In which case you may need a slew crane 30t or larger. Know the weights of what has to be lifted and the distance from the crane to where it will be placed. A crane cannot set up or travel over underground services or recently filled excavation. These things could mean the crane has to set up even further away from the house. If the crane is for unloading trucks, access again. Cranes need to stay about 3meters from power lines which is a common problem bringing gear onto site. While a slew crane generally sets up in one position for all lifts (some can travel) a Franna is designed specifically for pick and carry. It can unload trucks and travel the gear onto site under the power lines. Provided it isn't lifting extra large items. Speak with the provider about what has to be done, it will be all to familiar for any decent company. As long as access is fine and underground services won't hinder you they should know exactly what you need. Be prepared, usually a minimum 4hr hire. If you think the task is going to take longer you need to plan what has to be done and have everything ready for placement. Organization is paramount, you don't want a crane and it's crew sitting there doing nothing because you didn't plan ahead. Hope this helps, I could have been more specific if the question had some details.
Send your message to us
Tower Crane TC5013B for Malaysia Market
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords