• TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 1
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 2
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 3
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 4
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 5
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 6
TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, TC5013B have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013B tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products


Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our tower crane:

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

 

Independent height (m)

40

Max height with attachment (m)

121

Working range can be adjusted(m) 

40/50

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.3

-

3

3

-

6

Speed(m/min)

9

38

80

4.5

19

38

Motor

YZTD225L2-4/8 /32-24/24/5.4KW     

Trolleying mechanism

Speed(m/min)

20/40

Motor

YZTDE132S-4 /8-3.3/2.2KW  

Slewing mechanism

Speed(r/min)

0.6

Motor

YZR132M2-6-3.7KW

Climbing speed(m/min)

0.5

Counterweight(t)

11

Mast section size(L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

34

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   65A

 


TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate


TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
Shock absorption. The ball swings toward the building and hits, the energy of that swing is mostly dissipated into the building but also into the cable and cable connectors as the ball bounces back. That shock of the impact resonates and gets dissipated by the tire. It reduces wear and tear on the cable and cable connectors, also on the crane tower. Your car engine has motor mounts of the rubber type of material and it absorbs the resonating vibration of the engine. I have seen the cable connectors, interesting to say the least. The strands are interlaced sometime, and other times I see them clamped together. It would seem important to protect those joints. I do not know all of the crane business terminology, but that would be the gist of it.
Q: Ok, so I figured out that last step after watching an origami tutorial thing on youtube
It okorder / The animations on this site are good, showing what you have to do, without hands in the way.
Q: What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel. Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q: Who thinks William Shatner is adorable as Denny in Boston Legal? I do!! I just want to pinch his cheeks. He looks so lovable (in a chubby old guy kind of way. Lol.)AhahaAnd Shirley. She's so funny.Lincoln, suck. my. lobe. lol!Anywho...answer my denny question!!
LOVE him as Denny Crane. He makes me laugh every time!!
Q: WHAT IS A WADDLE CRANE?
Well okorder / but I couldn't find any reference to them being called waddle cranes. While the W on a key board is close to the S, you'd have to miss the TR for waddle to be misspelling of straddle, so I have no idea, sorry.
Q: What measures should be taken to make tower cranes stable?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Q: We need to purchase spare parts. If there are any supplier in the ASEAN region as possible. We are in urgent need . We are from Viet NamThank you.Email : tuanhuynh62@yahoo,com
You okorder with contact details. Search for the product you are looking for from the website's search box and you will get the list of suppliers.
Q: What is the insulation resistance of tower crane?
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q: Cranes are normally used in construction in most countries.But I saw some photos that show Iranians are hanging criminals in pubic with cranes instead of gallows.Is it more painful to the dying criminals to the last moment?Do you know why?
they probably didn't have the proper arrangements to carry out the punishment so they used cranes instead of gallows. who knows? but weird really. and it wouldn't be more painful... err... the purpose is to snap the neck... ouch :(
Q: why the new york cranes collapsed?
supply them time Dizz, ultimately some Lib will say that is Bush's fault because...he enable the metal marketplace crumple so the crane became created from chinese language iron...or he did not signal the bill to provide the city of lengthy island adequate money for inspectors...or he ordered it to make Bloomberg seem undesirable because Obama became thinking Bloomberg as vice president.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords