TC5610 6T Rail Mounted Tower Crane with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our TC5610 6T Rail Mounted Tower Crane with CE ISO Certificate
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our TC5610 6T Rail Mounted Tower Crane with CE ISO Certificate
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our Building Equipment Wholesale Tower Crane Spare Parts
Independent height (m) | 41.5 | ||||||
Max height with attachment (m) | 141.5 | ||||||
Working range can be adjusted(m) | 44/50/56 | ||||||
Min working range(m) | 2.5 | ||||||
Max lifting capacity(t) | 6 | ||||||
Tip load @ 48m(t) | 1 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 1.5 | - | 3 | 3 | - | 6 | |
Speed(m/min) | 0 | - | 80 | 0 | - | 40 | |
Motor | YZRDWF225M2-4/8 -24/24KW | ||||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||||
Motor | YZTDE132L-4/8/16-3.3/2.2/1.1KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YZR132M2-6-3.7KW X2 | ||||||
Climbing speed(m/min) | 0.58 | ||||||
Counterweight(t) | 14.1 | ||||||
Mast section size(L×W×H)m | 1.6×1.6×2.5m | ||||||
Working temperature | -40-+60°C | ||||||
Total power (KW) | 37 | ||||||
Power supply requirement (KVA) | 180KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||||
Startup voltage & current | 380V×95%=361V 285A | ||||||
Rated working voltage & current | 380V 108A
|
FAQ TC5610 6T Rail Mounted Tower Crane with CE ISO Certificate
1. Whether you can provide cutomized poducts?
Yes. We are hi-tech enterprise affiliated to China Academy of Building Research. We have a group of engineers, who have title of professor , senior engineer and engineer. We can give you special design as per the drawings of your building, helping you solve different problems faced in your projects.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: When the tower crane foundation is found, what should be discontinued?
- The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
- Q: When the tower crane top height is more than meters
- (two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
- Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
- Yep, they use a smaller crane that sits on the back of a truck and has a telescopic arm, it only takes a few days. There's a lot of construction going on in my city and I've seen them do it.
- Q: This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
- try okorder /
- Q: Tower crane; command; gesture
- 5. hook down: arm stretched to the front, lower, and the body with an angle of about 30 degrees, five fingers stretched out naturally, with the wrist as the axis rotation.6. hook horizontal movement: small arm side to side straight, fingers together, palms outward, toward the direction of the load should be moving down to the shoulder level position.7. the hook rises slightly: the small arm extends to the top of the side, the top of the palm is higher than the shoulder, the wrist is the axis, and the palms swing upward repeatedly.
- Q: i was wondering
- There is a legend that if a person makes 1000 cranes then they get one wish. Cranes are a sign of longevity in Japan and children often make cranes and bring them to a famous shrine in Japan. Not sure if its true or not. I'm testing it out now actually. Just 900 something more cranes to go.
- Q: How do Crane Motors Work?
- I'm not 100% familiar with this but this should be pretty close to the answer. Simple/standard crane motors work by applying power first through a rotating steel shaft into a gearbox. The gearbox allows the gearing ratio to be changed (to trade rotation speed for torque or torque for rotation speed). Another steel shaft carries the power out of the gearbox, again through rotation, to a spindle (think big thimble) around which steel cable is wrapped.
- Q: i cant find a poetry site that will let me read this portion of The Bridge, the epic poem. i need help
- I okorder /.. Try searching lines from the poem if that doesn't work for you like imponderable the dinosaur sinks slow.
- Q: I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
- The flare boom is used to burn off gas from the well. It is basically a pipe that directs the gas to a safe location.
Send your message to us
TC5610 6T Rail Mounted Tower Crane with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords