• Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction System 1
  • Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction System 2
  • Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction System 3
  • Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction System 4
  • Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction System 5
Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction

Geocells Philippines Steel Plastic Geogrids for Civil Engineering in Road Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Plastic Geogrids of Civil Engineering Products in Road Construction

Product Introduction

The Steel plastic composite geogrid is by the high tensile steel wire, after the special handing, with the polyethylene(P. E), and increase other assistants, though squeezes out causes it excel to become the mult-skill anti-to pull the banding, and the surface has the rough embossing, for excel in reinforcement earthwork belt. From this as soon as the single belt, after vertical, according to decides the spacing knitting horizontally or clamps gathers the arrangement, uses the ultrasonic welding to molding.

The Steel plastic composite geogrid is by the high tensile steel wire, after the special handing, with the polyethylene(P. E), and increase other assistants, though squeezes out causes it excel to become the mult-skill anti-to pull the banding, and the surface has the rough embossing, for excel in reinforcement earthwork belt. From this as soon as the single belt, after vertical, according to decides the spacing knitting horizontally or clamps gathers the arrangement, uses the ultrasonic welding to molding.


color:  

black

certification:   

ISO9001,ISO14001

standard:  

GB/T 17639-2008

MOQ: 

5000m2

Place of origin:    

Shandong,China

packing:   

according to customer's need

Our Service

Quality assurance
1.On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2. Strictly in accordance with the ISO9001-2008 international quality system standard,we monitor and manage the whole process throughout production,quality testing,and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer’s responsibility or irresistible natural disasters),we have refunding,replacement,and repair services.We will respond to customers’ feedbacks on quality issues within 24 hours.

Packaging & Shipping

Packing: PLASTIC FILM INSIDE, AND WOVEN BAG OUTSIDE
Shipping: About 15 days after receipt the deposit

 

FAQ:

Q: What kind of payments does jenor support?
A: T/T, L/C, Cash are accepted.
Q: Do you charge for the samples? 
A: Accordeing to our company policy, the samples are free, we only charge the freight fee. And we will return the freight fee during the next order. 
Q: Can you produce according to customers' design? 
A: Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q: Do you have other products?
A: Yes, please check the pictures:

 


Q: Anchorage length of Geogrid
The old cement pavement maintenance, use method and injection method of self-adhesive, glass fiber grid in the original road, also can do fine 20mm-30mm asphalt concrete leveling layer in the original pavement, then laying fiberglass geogrid, and asphalt concrete pavement, thickness should be 60-100mm.E. the new road surface layer can be anchored method, self adhesion method for construction.
Q: Are geogrids effective in stabilizing dredged material containment areas?
Yes, geogrids are effective in stabilizing dredged material containment areas. They provide reinforcement and stability to the soil, preventing erosion and maintaining the integrity of the containment area. Geogrids are specifically designed to distribute and manage loads, improving the overall performance and long-term stability of dredged material containment areas.
Q: What is the typical width of a geogrid roll?
The typical width of a geogrid roll ranges from 4 to 16 feet, although some manufacturers may offer wider options as well.
Q: How do geogrids enhance the performance of mechanically stabilized earth walls?
Geogrids enhance the performance of mechanically stabilized earth walls by providing tensile strength and reinforcing the soil structure. They distribute lateral forces and soil loads more evenly, reducing the potential for wall failure or deformation. Additionally, geogrids improve the overall stability and durability of the wall by increasing its resistance to settlement, slope erosion, and seismic activity.
Q: Can geogrids be used in reinforcement of mechanically stabilized earth walls for bridge abutments?
Yes, geogrids can be used in the reinforcement of mechanically stabilized earth walls for bridge abutments. Geogrids are commonly used in these applications to enhance the stability and strength of the soil, thereby improving the overall performance and safety of the bridge abutment.
Q: What is the lifespan of geogrids?
The lifespan of geogrids can vary depending on several factors such as the quality of the material, installation techniques, and the environmental conditions they are exposed to. However, on average, geogrids are designed to have a lifespan of around 20 to 50 years.
Q: How to do a good job ah? How to start the sale of geotechnical materials
First, the product is better, the price is right, good service. Our products sell well.
Q: Are geogrids suitable for use in slope stabilization for mining tailings dams?
Yes, geogrids are suitable for use in slope stabilization for mining tailings dams. Geogrids provide reinforcement and stability to the slopes, preventing erosion and potential failure of the dam. They are designed to withstand high loads and are effective in controlling soil movement, making them an ideal solution for slope stabilization in mining tailings dams.
Q: What is the profit margin of the production of Geogrid
Profit is not high
Q: Can geogrids be used in temporary slope stabilization applications?
Yes, geogrids can be used in temporary slope stabilization applications. Geogrids are commonly used in various soil stabilization projects, including temporary slope stabilization. They provide reinforcement and improve the stability of slopes by distributing applied forces and reducing soil erosion. However, it is important to consider the specific site conditions and design requirements to ensure the appropriate selection and installation of geogrids for temporary slope stabilization.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords