Steel Frame Formwork GK120 with Long Time Using for Large Projects
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 300 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Steel Frame Formwork GK120
There is a prizing part designed in the corner, which can help to position and remove formwork easily.
The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.
The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.
2. Main Features of Steel Frame Formwork GK120
High standardized system
Easy connection with adjustable steel clamp
Convenient and fast corner formwork
Flexible to assemble and application
3. Steel Frame Formwork GK120 Images
4. Steel Frame Formwork GK120 Specification
-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.
-There is a prizing part designed in the corner, which can help to position and remove formwork easily.
-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.
-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.
5. FAQ of Steel Frame Formwork GK120
1) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
2) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Steel Frame Formwork GK120 cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
- Q:why the scaffold nned to be inspected within the preceding seven(7) days?
- To make sure that it is constructed properly and things haven';t slipped out
- Q:Hey I need a quot;letter to the editorquot; scaffold for english homeowrk. Can anyone help?
- OK, I'm really confused. Exactly WHAT are you looking for? An existing letter? A format on how to write a letter? Or for us to write one for you (good luck with THAT!)?
- Q:In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
- concentration your interest on who's on the scaffold, how they react to the standard public shaming, and what the reader learns with regard to the character from analyzing the define of them on the scaffold.
- Q:Should I work Offshore or Scaffold?
- offshore for sure buddy,,scaffolding is a pain sometimes,,
- Q:Standard Specification for steel tubes for ladder type scaffolding
- Galvanized steel pipe should be used DN40, according to the material of the rod is divided into: 1, a single steel pipe scaffolding. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5. 2, a variety of specifications of steel scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3, the steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. Scaffolding bowl buckle type steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using steel cross bar, for the "steel pipe based scaffold".
- Q:Steel tube scaffolding construction labor time? Whether the demolition of construction
- The scaffolding in the quota is set in square meters. Including the demolition and demolition. Labor costs about 35.05~100 yuan, depending on the local market.
- Q:how would you apply scaffolding into an example in history/geograpy
- The US and other countries helping Haiti is an example of scaffolding which implies nations helping each other./
- Q:All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
- March To The Scaffold
- Q:Floor type scaffolding construction program is what kind of, what role?
- The role and requirements of scaffolding:1, the role of scaffolding:(1) operating platform(2) stacked materials(3) short distance transport
- Q:So today I decided to get both my tragus' done, a top cartlidge piercing and a scaffolding piercing in one sitting and now I'm in agony and the only aftercare I was given is a tiny bag of rock salt.... SALT!?Any ideas on how to get the swelling down / pain to go away and any tips on how to reduce the chance of getting them infected?
- One way I know to help the healing using bioplast or PTFE jewelry but I dont recommend changing it now since it's new. As for the rocksalt use it on the piercings to clean it out
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Frame Formwork GK120 with Long Time Using for Large Projects
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 300 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches