• CUP LOCK SCAFFOLDING SYSTEM  CONSTRUCTION System 1
CUP LOCK SCAFFOLDING SYSTEM  CONSTRUCTION

CUP LOCK SCAFFOLDING SYSTEM CONSTRUCTION

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
TIA,Tianjin China (Mainland)
Brand Name:
ADTO
Model Number:
C-1
company type:
manufacturer
surface treatment:
galvanized
price terms:
FOB, CIF, CFR, EXW etc,
payment terms:
LC, T/T, west union etc
MOQ:
1000pcs
certifcation:
CE, ISO, SGS

Packaging & Delivery

Packaging Detail:in bag or carton, pallet, suitable for exportation package
Delivery Detail:within 25days after confirm the order

Specifications

superior quality cuplock system scaffolding manufacturer
1.surface treatment: galvanized
2.materials:Q235

We also supply different types of coupler :

ItemProductSpecificationWeight
(kg)
couplersCasting Fix Coupler48
Coupler48.3*48.3mm0.58
BS Press Fix Coupler48.3*48.3mm0.85
BS Press Swivel Coupler48.3*48.3mm1.05
Inner Joint Coupler48.3*48.3mm0.77
Putlog Coupler48.3*48.3mm0.62
.3*48.3mm
0.85
Casting Swivel Coupler48.3*48.3mm0.9
Casting Sleeve Coupler48.3*48.3mm0.9
Drop Forged Double Coupler48.3*48.3mm1
Drop Forged Swivel Coupler48.3*48.3mm1.1
JIS Press Fix Coupler48.3*48.3mm0.58
JIS Press Swivel
Board Retaining Coupler48.3mm*40mm0.62
Beam Coupler48.3*45mm1.52
Press Sleeve Coupler48.3*48.3mm1
Limpet Coupler48.3*45mm0.3
German Double Coupler48.3*48.3mm1.2
German Swivel Coupler48.3*48.3mm1.4



Q: It's like they just disappeared
During a recent interview, Nidia stated she is settling with her current boyfriend in Italy, teaching yoga classes, and gave birth to their daughter Lilith Fae Dal Bosco in April 2007. Dawn Marie has been doing Real Estate work, and is in talks with TNA about maybe going there to wrestle. Madusa retired from pro wrestling for good in 2001. You can see Scaffolding Matches on TNA (or at their pay-per-views) sometimes. They are called Elevation X matches and involve the X-Division of TNA.
Q: Height in the number of scaffolding should be set up scissors
6 cross when the time is 45 degrees, across the 5 span of 50 degrees, across the 4 span of 60 degrees. The length of the connecting rod is required to overlap, the overlap length is not less than 1M, the use of three fasteners is evenly distributed, the end of the fastener is not less than 10CM.
Q: Steel tube scaffolding construction labor time? Whether the demolition of construction
Shelf tubeMaterial: Q195, Q215 or Q235 specifications: Phi 3, phi, phi, phi, phi, phi, phi, 2.5, phi = phi, phi, phi, phi, phi, phi, 3.25, PhiLength: 1-6 meters and a half size; according to customer specifications and processing standards: SY/T5768-95 GB/T3091-2001Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure
Q: why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q: Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
A scaffold now is not how to use, is a relatively high cost, two is a scaffolding no disc Scaffolding Safety, but compared with the disc scaffolding fastener steel pipe scaffold is relatively cheaper, currently used more is fastener scaffolding, disc with a more foreign words.
Q: Mechanical model, stability, etc.
(4) cantilever scaffold: scaffold for installation or repair of cantilever work.(6) formwork support: a frame for supporting a template and a scaffold material.5 divided by the size of occlusion(1) open type scaffold: only with the work of the railing and the foot board, no other shelter facilities scaffolding.(2) partially enclosed scaffolding: Scaffolding with an area of less than 30%.(3) semi closed scaffolding: shield area of 30% to 70% of the scaffolding.(4) fully enclosed scaffold: scaffold with full length and full height along the outer side of the scaffold.(5) open type scaffold: scaffolding provided along the periphery of the building.(6) sealing ring type scaffold: scaffolding along the periphery of the building.
Q: Hi guys!...ive had a scaffold piercing for a little over 2 weeks and when i got it done it bled quite alot...this obviously made some scabs...but every time i clean it the scabs come off and its starts bleeding again...and just before i posted this i found abit of puss like fluid round the back of it!I clean it twice a day and avoid touching it What have i done wrong :(Plus my mum is now like quot; i told you so quot; LolCheers :)
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q: A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint to one side, as shown.
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q: stands there.?(from the scarlet letter book.)
I would describe her as strong. The woman has convictions, and she's not ashamed of what she's done. Instead of giving in and telling everybody who the father is so she can lessen her sentence, she stands firm in her actions.
Q: i need help with the musical elements of these songs, such as the instrumentation, rhythm, texture, timbre and key. thanks
I would suggest you take the score (any good music library should have it) and listen to the music. That would give you all the information you need. It doesn't take THAT long.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords