• CUP LOCK SCAFFOLDING SYSTEM  CONSTRUCTION System 1
CUP LOCK SCAFFOLDING SYSTEM  CONSTRUCTION

CUP LOCK SCAFFOLDING SYSTEM CONSTRUCTION

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
TIA,Tianjin China (Mainland)
Brand Name:
ADTO
Model Number:
C-1
company type:
manufacturer
surface treatment:
galvanized
price terms:
FOB, CIF, CFR, EXW etc,
payment terms:
LC, T/T, west union etc
MOQ:
1000pcs
certifcation:
CE, ISO, SGS

Packaging & Delivery

Packaging Detail:in bag or carton, pallet, suitable for exportation package
Delivery Detail:within 25days after confirm the order

Specifications

superior quality cuplock system scaffolding manufacturer
1.surface treatment: galvanized
2.materials:Q235

We also supply different types of coupler :

ItemProductSpecificationWeight
(kg)
couplersCasting Fix Coupler48
Coupler48.3*48.3mm0.58
BS Press Fix Coupler48.3*48.3mm0.85
BS Press Swivel Coupler48.3*48.3mm1.05
Inner Joint Coupler48.3*48.3mm0.77
Putlog Coupler48.3*48.3mm0.62
.3*48.3mm
0.85
Casting Swivel Coupler48.3*48.3mm0.9
Casting Sleeve Coupler48.3*48.3mm0.9
Drop Forged Double Coupler48.3*48.3mm1
Drop Forged Swivel Coupler48.3*48.3mm1.1
JIS Press Fix Coupler48.3*48.3mm0.58
JIS Press Swivel
Board Retaining Coupler48.3mm*40mm0.62
Beam Coupler48.3*45mm1.52
Press Sleeve Coupler48.3*48.3mm1
Limpet Coupler48.3*45mm0.3
German Double Coupler48.3*48.3mm1.2
German Swivel Coupler48.3*48.3mm1.4



Q: The scaffold is 18 m long. A 650-N box sits 3.0 m from the left end. What is the tension in each wire? left wire = 520 N; right wire = 130 N left wire = 640 N; right wire = 210 N left wire = 195 N; right wire = 975 N left wire = 295 N; right wire = 1000 N can someone show me how to do this please :)
Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
Q: If I built a box using standard diameter scaffolding tube (48mm) and connected it using kee clamps rather than standard scaffolding connectors, do you think it would be strong enough to support a 2000lb bar being dropped on it from a 2m height without breaking? I want to build it without welding, but am concerned over the strength of such a box connected only with kee clamps.
though that page doesn't seem to be quite complete
Q: when must you wear safety harnesses on scaffolding?
At all times.
Q: All i can find is full time positions but none for turnarounds
Assuming you mean fling and that you only want to fling them virtually you could use Java.
Q: More than 3 floors of the building can be erected with bamboo scaffolding
3, the structure of the scaffold, the components of the initial defects, such as the initial bending of the rod, corrosion, erection size error, eccentric load, etc.;4, and the wall of the connection point, the binding of the scaffold variation. The study of the above issues and lack of systematic accumulation of statistical data, does not have the independent probability analysis of the conditions and structure of the resistance is less than 1 of the adjusted coefficient multiplied by the value determined by calibrating system and safety coefficient used in the past. Therefore, the design method used in this specification is essentially a semi probabilistic, semi empirical. Scaffolding to meet the requirements of this specification is the basic requirements of the design calculation.
Q: In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
No. Santa doesn't like this movie.
Q: Steel pipe scaffolding scaffolding which components? Double row scaffolding and row spacing, step length, spacing and wall fixed spacing is generally much
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q: A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q: In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
Technical code for safety of steel tubular scaffold with couplers in JGJ130-2001 constructionJGJ130-2001 construction fastener type steel pipe scaffolding safety technical specificationsGBT17656-2008 plywood for concrete formworkGB15831-2006 steel pipe scaffold fastener
Q: Where can I get my scaffold pierced in Glasgow?
Nirvana, in Chisholm St i would never go anywhere else i got all mine there and both my teen daughters got theirs there as well first class, perfect hygiene, VERY experienced and lovely staff john christine, especially

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords