Cuplock Scaffolding System with High Effection for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffolding
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
.Not easy to lose fastener, portable firm and easy to maintain and transport
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
.Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.
.Safety and Steady: The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.
.Multi using: According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.
.High loading: The standard actuates axially, this makes the scaffolding in the three-dimensional space, high strength and steady of the structure. The cross plate is good at axial shearing resistant, and makes the axis of each pipe in one plate, so it improves 15% strength and steady performance.
. Re-used: Luowen scaffoldings are made by high grade steel, they are not easy to damage or out of shape,so it could be used repeatedly.
5. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:How bad? :/ i'm a real baby when it comes to this stuff
- I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
- Q:stands there.?(from the scarlet letter book.)
- I would describe her as strong. The woman has convictions, and she's not ashamed of what she's done. Instead of giving in and telling everybody who the father is so she can lessen her sentence, she stands firm in her actions.
- Q:What is scaffolding pole, bar, scissors support?
- 1 divide the material according to the bar1) a single standard steel scaffolding steel pipe. It uses only one standard, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2, a variety of specifications of steel scaffolding, which consists of more than two kinds of different specifications of the steel pipe, such as door scaffolding3) steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding.
- Q:A) what is the velocity of the brick after 4.0 s?B) how far does the brick fall during this time? This is using 9.8 m/s^2 as the acceleration
- Since acceleration is constant which is 9.8 m/s^2, the velocity increases by the fixed 9.8 amount every second, so: A) v = v0 + gt = 0 + 9.8*4 = 39.2 m/s where v0 is initial speed which in this case is zero. B) We use constant acceleration equation: x = x0 + v0*t + 1/2gt^2 = 1/2 gt^2 = 1/2 *9.8 * 16 = 8*9.8 = 80 - 1.6 = 78.4 m
- Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85
- Q:what is differences between scaffold and scaffolding?
- Scaffold is what scaffolding is constructed of.
- Q:What is the height limitation of the standing braces in ringlock scaffolding system?
- Hi addla, I do not know, but I am sure you do and please tell us all addla.
- Q:a. Climb the stairs to join Hester and Pearl. b. Give an encore sermon. c. Reveal the meaning of life. d. Rise Up to heaven.
- e. do his own homework Only joking. It's definitely d. Or c.
- Q:It's not fixed to the building and it looks as though a heavy gust of wind would send it crashing down. How exactly does scaffolding stay up and not topple over?
- Well, it is attached to the building - not very strongly, but enough to keep it directly over the feet. The feet are adjusted to keep the part above them vertical so forces are straight down - easily achieved with a plumb bob on a string parallel to the pipes. Many scaffolding installations extend around a corner and with the diagonal bracing built in that provides stiffness. And scaffolding for working on a building is protected by the building, which blocks the air flow and slows it down from in the open air. Scaffolding towers, such as lighting at a concert or other special event (golf tournament) are guyed with wires/cables going out at an angle to anchors in the ground - these are often nearly invisible at any distance.
- Q:ok so i recently got a scaffold piercing and its not completely healed i have gym tomorrow and my gym teacher makes us take out our earrings i know he is gonna make me take out my scaffold bar but i cant its not healed or he will make me sit out until its healed i herd that it takes 1 year before it heals i cant miss gym the whole year! what should i do HELP PLEASEyours trulySelyGomy
- well i would cover it up if i were you.....leave ure hair down or something to make it less nnoticable
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cuplock Scaffolding System with High Effection for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches