Standard 3.0m for cuplock scaffolding system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | |||||
material: | finish: | color: | |||
diametre: | fuction: | certification: |
Packaging & Delivery
Packaging Detail: | in factory steel pallet |
Delivery Detail: | 35 days after comfirmed the order |
Specifications
Superior quality and good price
good welding and suface treatment very well
factory directly supply
shipping as promise time
Cup-Lock Standard Without Spigots
Description | Weight |
0.4M Cup-Lock Standard, Hot Dipped Galvanized | 2.40kg |
0.8M Cup-Lock Standard, Hot Dipped Galvanized | 4.60kg |
1.3M Cup-Lock Standard, Hot Dipped Galvanized | 6.60kg |
1.8M Cup-Lock Standard, Hot Dipped Galvanized | 9.10kg |
2.3M Cup-Lock Standard, Hot Dipped Galvanized | 11.60kg |
Cup-Lock Ledger
Description | Weight |
0.6M Cup-Lock Ledger, Hot Dipped Galvanized | 2.65kg |
0.9M Cup-Lock Ledger, Hot Dipped Galvanized | 3.73kg |
1.0M Cup-Lock Ledger, Hot Dipped Galvanized | 4.10kg |
1.2M Cup-Lock Ledger, Hot Dipped Galvanized | 4.81kg |
1.3M Cup-Lock Ledger, Hot Dipped Galvanized | 5.17kg |
1.6M Cup-Lock Ledger, Hot Dipped Galvanized | 6.24kg |
1.8M Cup-Lock Ledger, Hot Dipped Galvanized | 6.96kg |
2.3M Cup-Lock Ledger, Hot Dipped Galvanized | 9.50kg |
Cup-Lock Diagonal Brace
Description | Length | Weight |
1.8 x 1.5M Cup-Lock Diagonal Brace, Hot Dipped Galvanized | 2.343M | 8.70kg |
1.8 x 2.0M Cup-Lock Diagonal Brace, Hot Dipped Galvanized | 2.691M | 9.80kg |
2.5 x 1.5M Cup-Lock Diagonal Brace, Hot Dipped Galvanized | 2.916M | 10.70kg |
2.5 x2.0M Cup-Lock Diagonal Brace, Hot Dipped Galvanized | 3.202M | 11.50kg |
3.0 x2.0M Cup-Lock Diagonal Brace, Hot Dipped Galvanized | 3.606M | 13.00kg |
Cup-Lock Intermediate Transom
Description | Weight |
0.565M Cup-Lock Intermediate Transom | 2.80kg |
0.795M Cup-Lock Intermediate Transom | 3.70kg |
1.3M Cup-Lock Intermediate Transom | 5.50kg |
1.8M Cup-Lock Intermediate Transom | 7.30kg |
2.5M Cup-Lock Intermediate Transom |
|
- Q: i have lived in york for ten years and have been told many times that the minster in york has had scaffolding up for decades and that it has to stay there for political or religious reason there is never any work done or indeed workers on the scaffolding. can anyone shed any light on the matter for me or is it just an urban myth and nothing more than on going restoration.
- Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
- Q: Cantilever scaffold technical disclosure
- Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
- Q: hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
- Dab it with tissue until it stops, Try not to play with it too much and if you need to touch it, ALWAYS wash your hands before doing so. Also do hot salt water soaks (as hot as you can stand) twice a day and it'll heal nicely in no time :)
- Q: Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
- trust me, bro. bad idea. industrials are very tempermental at best. your helmet will cause every problem possible. any descent piercer would tell you the same. don't do it. they take up to a year to heal soif you really want one, quit football or wait til you're out of school.
- Q: there is also shrubs and trees planted on the base of the wall and 14 feet from it
- Scaffolding and Cherry picker is your best option.
- Q: How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
- Hester Prynne On The Scaffold
- Q: What are the main safety problems when dismantling the scaffold
- 5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
- Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- Well of course it depends on the person. Some people say the piercing isn't bad at all, while some say it is really painful. Some people say the healing process is absolute hell, but for some people it's a breeze. I got an industrial 3 months ago, and i would rate the actual piercing process as a 8/10 (10 being the most painful). It was pretty painful in my opinion, but the good thing is that the pain doesn't last long at all. Most people i know who have industrials say that the healing process is more painful than getting the piercing, but for me it was the complete opposite. Immediately after the piercing it throbbed and was a tiny bit sore for about an hour, then for the next 2 days it was completely painless. But after that, it was pretty sore for about 2-3 weeks, but it wasn't that bad. Now after having it 3 months, it still feels a bit uncomfortable when i sleep on it, sometimes it's a tad bit sore, but no big deal at all :)
- Q: The construction scheme of high rise and external cantilever scaffold!
- Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
- Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
- It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Send your message to us
Standard 3.0m for cuplock scaffolding system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords