cup-lock system scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: |
Packaging & Delivery
Packaging Detail: | normally it's packed in square steel pallet or in bulk |
Delivery Detail: | 25days delivery |
Specifications
easy to assemble and disassemble
various sizes could be chosen
Specification | Unit Wt.(KG) |
Cup-lock System Standard 2500mm | 14.16 |
Cup-lock System Standard 1500mm | 8. |
Cup-lock System Ledger 2500mm | 9.55 |
Cup-lock System Ledger 1520mm | 5.85 |
Cup-lock System Diagonal Brace 2130x2000mm | 8.93 |
- Q: I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85
- Q: The combination form of bowl buckle type common scaffold?
- High 30m below the scaffold verticality deviation should be controlled within 1/200, high 30m above the scaffolding should be controlled in 1/400~1/600, the total height deviation should not be greater than 100mm.
- Q: Steel tube scaffolding construction labor time? Whether the demolition of construction
- And can be roughly divided as follows: 2.1 according to the material of the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q: It's for my science assignment and I can't find the answer. Please help!! :)
- It is a way of making a bone strong enough to support body weight without having to be solid heavy bone.
- Q: Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
- Should be less than or equal to 3 times the vertical pole of the scaffolding.
- Q: does it hurt more than just getting your lobes pierced or the same?i just got a my ears pierced (so now i have two lobe piercing on each ear) it didn't hurt.i'm not sure if i should get it or not.
- It is one of the more painful ear cartilage piercings and, as such, hurts more than getting your lobes pierced. It's also much more difficult to take care of. BTW: I love your Andy Warhol avatar. He's my favorite artist.
- Q: do u think i should, is it safe, will it hurt, how bad will it hurt, and what might happen.
- No don't do that.. That is a really masculine piercing. I've hurt it hurts pretty bad to. Get one cartilage or a tragus. Much more feminime and very cute.
- Q: The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
- The existing scaffold erection specification is JGJ130-2011 "safety technical specification for the construction of steel tubular scaffold with couplers"; JGJ166-2008 "safety technical specification for the construction of bowl buckle steel tubular scaffolding";
- Q: A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
- Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
- Q: Cost of rent per day per month per ton of scaffolding
- The rent of the wheeled scaffold varies from place to place, with different regions
Send your message to us
cup-lock system scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords