• cup-lock  system scaffolding System 1
cup-lock  system scaffolding

cup-lock system scaffolding

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
China (Mainland)


Model Number:
CL

Packaging & Delivery

Packaging Detail:normally it's packed in square steel pallet or in bulk
Delivery Detail:25days delivery

Specifications

easy to assemble and disassemble
various sizes could be chosen

SpecificationUnit Wt.(KG)
Cup-lock System Standard 2500mm 14.16
Cup-lock System Standard 1500mm 8.
Cup-lock System Ledger 2500mm 9.55
Cup-lock System Ledger 1520mm 5.85
Cup-lock System Diagonal Brace 2130x2000mm 8.93


Q: I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85
Q: The combination form of bowl buckle type common scaffold?
High 30m below the scaffold verticality deviation should be controlled within 1/200, high 30m above the scaffolding should be controlled in 1/400~1/600, the total height deviation should not be greater than 100mm.
Q: Steel tube scaffolding construction labor time? Whether the demolition of construction
And can be roughly divided as follows: 2.1 according to the material of the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q: It's for my science assignment and I can't find the answer. Please help!! :)
It is a way of making a bone strong enough to support body weight without having to be solid heavy bone.
Q: Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q: does it hurt more than just getting your lobes pierced or the same?i just got a my ears pierced (so now i have two lobe piercing on each ear) it didn't hurt.i'm not sure if i should get it or not.
It is one of the more painful ear cartilage piercings and, as such, hurts more than getting your lobes pierced. It's also much more difficult to take care of. BTW: I love your Andy Warhol avatar. He's my favorite artist.
Q: do u think i should, is it safe, will it hurt, how bad will it hurt, and what might happen.
No don't do that.. That is a really masculine piercing. I've hurt it hurts pretty bad to. Get one cartilage or a tragus. Much more feminime and very cute.
Q: The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
The existing scaffold erection specification is JGJ130-2011 "safety technical specification for the construction of steel tubular scaffold with couplers"; JGJ166-2008 "safety technical specification for the construction of bowl buckle steel tubular scaffolding";
Q: A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q: Cost of rent per day per month per ton of scaffolding
The rent of the wheeled scaffold varies from place to place, with different regions

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords