SJ TOWER CRANE QTZ80-TC5810
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TOWER CRANE TC5810 description
Tower crane TC5810description
TC55810tower crane is our company according to the design of tower crane"GB/T5031-2008" modl of the tower crane.
1) work much, wide range of use, this machine has a fixed base and wall attachment type.
2) has high working speed, good performance of speed regulation, stable operation, high efficiency. Three speed motor and single speed ratio reducerused in lifting structure, so that the heavy load and low speed, light load speed.
3) crane configuration lifting height limiter, moment limiter, amplitude limiter,lifting weight limiter, slewing limiter, rotary, traction mechanism brake safety device, and trolley rope breaking resistant, anti broken shaft device, themachine is suitable for various different construction environment, ensure thework reliability of tower crane.
4) cab uses linkage Taiwan advanced operation of the mechanism of action of easy operation, simple repair.
Tower crane TC5810 technical parameters
The maximum working range of 58m, end weight and the maximum take-off weight of 6T1T.
Mechanism is equipped with three speed motor hoisting, smooth brakingimpact is small when shifting.
Luffing mechanism can provide two kinds of speed.
Free standing height 42 (M)
The maximum height of 190 (M)
The working range of the tunable 44/50/56/58 (M)
The minimum working range of 3 (M)
The maximum lifting capacity of 6 (T)
End load "(T) 1 (M)
- Q:The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
- no. no fight scene in any movie is realistic.
- Q:Yeah, I think I know what cranes are used for. But in the context of building an apartment and so on, what is the role derricks there. And why is called cranes and derricks - What is the correlation between them.
- Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
- Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
- If an answer of -4 hours is expected, pl. excuse. The practical difficulties of the faster cranes are constraints - the loading to / unloading from any crane is tricky, time consuming are with practical problems. The ship. yard where it is angered, the type of the cargo also decide the swiftness of unloading ; so it is not simple ratio !
- Q:I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
- Why do you want to draw an animal that is suffering? Draw something that is positive.
- Q:I am having trouble thinking of girls names that go well with my last name, Crane.my favorite name is lily but i think it sounds bad with my last nameand i like the name emma and i think that it goes well with crane but i think it might be too commonso if any of you can think of names that are not super common (not unheard of either) that go well with crane that would be awesome. Thanks!
- Brianna Paige Crane Nicole Reese Crane Megan Liana Crane Patricia Abagail Crane Savannah Leigh Crane Audry Lililan Crane Regan Michelle Crane MaKenna Baylee Crane Karsyn Emily Crane Brynlie Isabella Crane Emma Jessica Crane Lily Renee Crane
- Q:As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
- Sometimes the structure of the crane is built onto using the crane itself, building itself into a box. Then the crane lifts itself to the higher level. This can be done many times.
- Q:I was wondering how those guys/gals get up to their posts. Is there some type of elevator or do they climb up everyday? I'm talking about those big cranes on contruction sites. the huge ones.
- They climb a ladder up the middle of the central tower. I saw 'it' on the History Channel. .
- Q:if anyone can inform me about any of these styles in debt even if just one id greatly appreciat itbest ansewer will be hard here cause i will b thankful for all who give a sincere ansewer
- That is not much of a question. Then again I can see based on your grammar and spelling that you took very little time in considering it. Oh, and btw - Striking concepts is not a style... Thanks, but it's fairly obvious to me this Question is merely for Yahoo points.
- Q:I've heard of people making 1000 origami cranes as a wedding gift or decoration. I am making them as a gift for my sister-in-law and her husband, whose new baby is due next month. I'm up to 730, so I need to keep plugging away! My question is how should I display them? I've heard of putting them in a gallon jar. I was also thinking of making strings of 100. Do you put the string through the pointy part on the back? Can I arrange them into a mobile? Any ideas would be appreciated.
- it relatively is like asking: once you're making a wish on a taking pictures megastar, will it come real? even although the two are extreme-high quality gestures, no it won't come real. Origami cranes are purely products of paper that are folded to resemble birds; no rely what number you're making, they won't address supernatural expertise inclusive of wish-granting.
- Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
- 6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
SJ TOWER CRANE QTZ80-TC5810
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords