SJ TOWER CRANE QTZ63P - TC5610P
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Tower crane TC5610 description
TC5610 tower crane is our company according to the design of tower crane "GB/T5031-2008" model of the tower crane.
1) work much, wide range of use, this machine has a fixed base and wall attachment type.
2) has high working speed, good performance of speed regulation, stable operation, high efficiency. Three speed motor and single speed ratio reducer used in lifting structure, so that the heavy load and low speed, light load speed.
3) crane configuration lifting height limiter, moment limiter, amplitude limiter, lifting weight limiter, slewing limiter, rotary, traction mechanism brake safety device, and trolley rope breaking resistant, anti broken shaft device, the machine is suitable for various different construction environment, ensure the work reliability of tower crane.
4) cab uses linkage Taiwan advanced operation of the mechanism of action of easy operation, simple repair.
Tower crane TC5610 technical parameters
The maximum working range of 56m, end weight and the maximum take-off weight of 6T 1T.
Mechanism is equipped with three speed motor hoisting, smooth braking impact is small when shifting.
Luffing mechanism can provide two kinds of speed.
Free standing height 40 (M)
The maximum height of 190 (M)
The working range of the tunable 46/51/56 (M)
The minimum working range of 3 (M)
The maximum lifting capacity of 6 (T)
End load "(T) 1 (M)
TC5610 tower crane is our company according to the design of tower crane "GB/T5031-2008" model of the tower crane.
1) work much, wide range of use, this machine has a fixed base and wall attachment type.
2) has high working speed, good performance of speed regulation, stable operation, high efficiency. Three speed motor and single speed ratio reducer used in lifting structure, so that the heavy load and low speed, light load speed.
3) crane configuration lifting height limiter, moment limiter, amplitude limiter, lifting weight limiter, slewing limiter, rotary, traction mechanism brake safety device, and trolley rope breaking resistant, anti broken shaft device, the machine is suitable for various different construction environment, ensure the work reliability of tower crane.
4) cab uses linkage Taiwan advanced operation of the mechanism of action of easy operation, simple repair.
Tower crane TC5610 technical parameters
The maximum working range of 56m, end weight and the maximum take-off weight of 6T 1T.
Mechanism is equipped with three speed motor hoisting, smooth braking impact is small when shifting.
Luffing mechanism can provide two kinds of speed.
Free standing height 40 (M)
The maximum height of 190 (M)
The working range of the tunable 46/51/56 (M)
The minimum working range of 3 (M)
The maximum lifting capacity of 6 (T)
End load "(T) 1 (M)
- Q: Exactlly what type of bird is a crane?
- A wading bird Of the family, Gruidae
- Q: the title. the battery --- 9.6v 2000Mah INT NIMH Crane Stock Battery. will this fit in an echo 1 crane stock? the desc. said its designed for GG and SRC crane stocks, but may fit in other crane stocks.
- crane stocks depend on the manufacturer.echo1 is the copy cat of Tokyo mauri but i have a echo1 m4 so yes it will fit.
- Q: are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
- may have one, or try a tractor supply shop in your area. You can try matching the ring at an auto parts store that has balk parts behind the counter.
- Q: how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
- Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
- You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
- Q: need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
- 1. If You Mean Their Personality Then Tohru From Fruits Basket. 2. a. Pink. Purple. Blue b. Full Moon's From Full Moon wo Sagashite. 3. I 3 Shojo! 4. Put Some Kanji! 5. My Swiss Fudge Cookies! Anime Q- I've Never Seen Any That Do.
- Q: Yesterday around 9pm I saw a crane fly flying around my living room so I got a pillow and threw it over it. Sadly it found a way to get out cause when I was going to the bathroom I saw it right by the tub and I ran out. Those things are always trying to fly to me. Anyways there attracted to light or whatever so I just turned off the light in the bathroom and living room, and shut the door! I heard my sister later in the night go in there but idk if she saw it or not. So should I just go to the bathroom or wait till my sis goes in there?!
- Crane flies are totally harmless. Don't worry about it.
- Q: Tower crane; command; gesture
- 1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.
- Q: how a tower crane for a high rise building construction is erected?
- Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Send your message to us
SJ TOWER CRANE QTZ63P - TC5610P
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords