Scaffolding Parts-Hot Dip Galvanized Coupler
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-Hot Dip Galvanized Coupler
Place of Origin: China (Mainland)
Brand Name: CMAX
Type: Scaffolding Parts
Scaffolding Part Type: Scaffolding Couplers
Material: Carbon Steel Q235/1008/1010
Finishing: Color Zinc Plated
Thickness: 3mm
Diameter: 48.6mm
Weight: 650g
Min. Slip Load: 12.5 KN
Min. Distortion Load: 17 KN
Standard: EN74 / BS1139
tube and coupler scaffold:
Size: 48.3 x 48.3mm
Finish: electric, HDG
Board Clamp Packaging & Delivery:
Packaging Detail: braided bag and pallet pakaged, 24000 pieces per 20'
Delivery Detail: depend on the quantity
Board Clamp Specifications:
pressed swivel coupler per EN74 standard
Size: 48.3 x 48.3mm
Thickness: 5mm
Weight: 0.96kg
Finish: electroplated, HDG
Packaging & Delivery of Scaffolding Parts-Hot Dip Galvanized Coupler
Packaging Detail: Carton or PP Bag or as per buyer's specificationsDelivery Detail: 30days or Customer needs
Specifications of Scaffolding Parts-Hot Dip Galvanized Coupler
scaffolding coupler1) Material:Q235
2) Size:0.84kg/48.3mm
3) Surface:Galvanized,Electroplated
4) OEM Served
right angle coupler scaffolding manufacturer in india
Name |
Scaffolding Couplers |
Surface Treatment |
Galvanized,Electroplated |
Type |
Scaffolding Parts |
Brand Name |
CMAX |
Diameter |
48.6mm |
Thickness |
3mm |
Weight |
650g/pc |
Material |
Carbon Steel Q235 1008 1010 |
Finishing |
Color Zinc Plated |
Payment & Shipping Terms | |
MOQ |
1000 Piece/Pieces or Negotiable Trial Order |
Port |
Nantong or Shanghai |
Packaging Details |
Carton or PP Bag |
Delivery Time |
30days |
Payment Terms |
L/C,T/T |
Supply Ability |
20000 Piece/Pieces per Month |
1. We are manufacturer of all type of Scaffolding fittings and Couplers.
2. Our products reach the international quality standard, such as, ISO, DIN, BS, ANSI, JIS.
3. We can support RoHS products.
4. Color zinc plated to prevent rustiness and corrosion,and get longer working life.
5. We have the ability to manufacture kinds of scaffolding couplers, such as: type/Japanese type/British type/American type/Italian type/German type/Putlog coupler/Girder coupler/Fence coupler and so on.
"Excellent Quality, Perfect Services and Competitive Prices" is our eternal faith. We always do our utmost to create value for our customers
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
- Q:The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b)Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Hot Dip Galvanized Coupler
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords