Scaffolding Parts-Hot Dip Galvanized Sleeve Coupler
- Loading Port:
- XINGANG
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 2000 Unit/Units m.t.
- Supply Capability:
- 5000 Unit/Units Per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-Hot Dip Galvanized Sleeve Coupler
Material | Q235 |
Standards | BS1139, EN74, AS1576 |
Surface | HDG, galvanized, gold color galvanized, self-coloured |
Scaffodling accessories | Pressed |
Weight | As per customer requirements |
Bolt | 1/2", M14 |
Nut sizes | 17mm, 19mm, 21mm, 22mm, 23mm |
Certification | ISO9001:2000, CE, SGS |
Packaging & Delivery of Scaffolding Parts-Hot Dip Galvanized Sleeve Coupler
Packaging Detail: bags+pallet or as your requests
Delivery Detail: 20-45days
Specifications of Scaffolding Parts-Hot Dip Galvanized Sleeve Coupler
Building Material scaffolding sleeve coupler
material:Q235
size:48.3mm
weight:1.20kg
surface;zinc plate,electroplate
Building Material scaffolding Hot Dip Galvanized sleeve coupler
1.material:Q235
2.size:48.3mm
3.weight:1.20kg
4.surface;zinc plate,electroplate
5.High quality and competitive price
We are a professional manufacturer and exporter about scaffolding products.
Our products include full sets of Ring lock Scaffolding System, Cup Lock System, Frame System,
different kind of Scaffolding Couplers and Accessories, Shoring Prop, Formwork and its Accessories.
We have more than 10 years experience in Scaffolding production and have a good reputation in this field.
More than 90% of our products are export to Western Europe, Northern Europe, North America, South America, Australia.
Hope we can establish longtime cooperation.
Place of Origin: China (Mainland) Brand Name: CMAX material: Q235
Type: Scaffolding Parts
Scaffolding Part Type: Scaffolding Couplers
size: 48.3mm
weight: 1.20kg
- Q: How to manage the construction equipment at the construction site
- Personnel training, accreditation of staff training, including job skills training and personnel safety education and training
- Q: What are the general requirements for fire protection facilities?
- Before the start of the project, the temporary fire protection facilities at the construction site should be designed and the temporary fire protection facilities of the construction site should be used as the construction site.
- Q: What are the aspects installation of the construction site?
- Office (office, etc.)
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 2008 |
Annual Output Value | Above US$ 200 Million |
Main Markets | 50.00% Mid East 5.00% North America 5.00% Eastern Asia 30.00% Eastern Europe 8.00% Southeast Asia 2.00% Western Europe |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | |
No.of Employees in Trade Department | 0 |
Language Spoken: | Chinese |
b) Factory Information | |
Factory Size: | Above 1,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Hot Dip Galvanized Sleeve Coupler
- Loading Port:
- XINGANG
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 2000 Unit/Units m.t.
- Supply Capability:
- 5000 Unit/Units Per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords