• Scaffolding Parts-Cold Galvanized Repidshor Ledger End System 1
  • Scaffolding Parts-Cold Galvanized Repidshor Ledger End System 2
  • Scaffolding Parts-Cold Galvanized Repidshor Ledger End System 3
Scaffolding Parts-Cold Galvanized Repidshor Ledger End

Scaffolding Parts-Cold Galvanized Repidshor Ledger End

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
5000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Scaffolding Parts-cold galvanized repidshor ledger end:

Place of Origin:  China (Mainland) 

Brand Name:  CMAX 

Type:  Scaffolding Parts 

Scaffolding Part Type:  Scaffolding Couplers 

load-bearing:  5000kg 

surface:  Raw/HDG 

Ringlock scaffolding fitting, Scaffolding ledger head end

Item

Ledger End

Material

ZG25

Net Weight

0.96kg

Surface Treatment

Raw/HDG

Load-bearing

5000kg

Standard 

International 

Payment Terms 

T/T  L/C 

Delivery Time 

15-30 day after receive advance payment 

Supply Ability 

100000 pcs per month 

Package 

Plywood case or as clients' requirement 

 

product mechnical properties of Scaffolding Parts-cold galvanized repidshor ledger end:

material: cast steel

size: customizd

weight: customized

surface: black

press: investment casting

packing: in bags

payment: 30% in advance, balance against the B/L copy

Packaging & Delivery of Scaffolding Parts-cold galvanized repidshor ledger end:

Packaging Detail: Plywood case or pallet or as clients' requirement.

Delivery Detail: 15-30 days after receive advance payment

Specifications of Scaffolding Parts-cold galvanized repidshor ledger end

Scaffolding ledger end 

1.Material:casting steel,ZG25

2.Spec& Weight: 0.96kg

3.High quality and low price

Scaffold Cast Steel Ledger Brace End

1.Material:Cast Steel
2.Weight:0.5kg
3.Surface treatment: self color or Zinc Plated

About us:

A) We have much experience in designing and producing the  repidshor ledger end.

B) Our pruducts are widely exported to more than 10 countries and regions and very popular among US , the Middle East, South America and Europe and so on.

C) our mission is "quality priority and customer first" .

Our products and services have received good evaluations from customers.

 

We are specializes in designing & manufacturing of various kinds of  formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.

All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

 cold galvanized repidshor ledger end

 cold galvanized repidshor ledger end

 cold galvanized repidshor ledger end

Q:What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
Q:The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
Q:The whole concrete wall climbing frame or good use of steel scaffolding
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
Q:Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords