Quality Guaranteed Meida Self Raising 6 Tons QTZ 5013 Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane
1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Main Features of Tower Crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Tower Crane Images
Tower crane Specifiction
FAQ of Tower Crane
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
About CNBM
CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.
- Q:Please, if their is a site that shows how to build a crane, provide a link. btw: i do not want to buy some sort of crane building kit.Thanks
- Step by step: 1. Get male crane 2. Get female crane 3. Play romantic music 4. Wait 31 days 5. Voila! you have made a crane!
- Q:3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
- Hsquared gives a very blunt, and incorrect answer. Apparently a claimed 30 years in HS has not made her realize that different jurisdictions have different rules? Glad she's not working for me. Where I live a mobile crane operator or tower crane operator must be certified at a minimum every 3 years. The correct answer is to contact the agency which licenses crane operators in your jurisdiction. They should have a copy of your certification.
- Q:If you were to give someone a paper crane with an ayat or hadith (has to be short, as I have to write on its wings)... what would you write?I was thinking of writing this:Peace be upon you for what you patiently endured. And excellent is the final home. [13:24]I'm not sure though...lol. Any ideas? Salam.
- Walaikum Salaam, So patiently persevere: for verily the promise of Allah is true: nor let those shake thy firmness, who have (themselves) no certainty of faith. al-Qur'an 30:60 'Never let your enmity for anyone lead you into the sin of deviating from justice. Always be just: that is closest to being God-fearing.’ (al-Ma’idah 5:8) ‘The flesh of sacrificial animals does not reach God and neither their blood; but only godliness from you reaches Him.’ (al-Hajj 22: 37) Hope I helped sis! :)
- Q:A crane that docks is capable of doing 550 J of work. How high can it lift a load that weighs 45N?
- A crane can lift it's rated limits to full extension. Provided 45N is within it's rated capacity, it can lift it as high as the crane can lift items.
- Q:There is no CAD map attached to embedded parts of tower crane?
- Where there are special drawings, we are using the embedded parts of tower crane attachment reinforced pre buried above 32mm (with hook) in concrete beam column, with the head of the thread and attached connection
- Q:what is the common cause of crane accidents
- Although mechanical failure does occur, most crane accidents are caused due to human error. Here are some examples: 1) Operating a crane during adverse weather conditions, such as wind conditions 2) Overloading a crane/ improper load calculations 3) Inexperienced or untrained personnel 4) Improper rigging of the load 5) Bypassing safety devises 6) Improper selection of the crane for the environment (ground conditions, power lines etc.) based on the type of load 7) Shock-loading a crane 8) Failure to perform maintenance and inspections in accordance to manufacture specifications I hoped this helped Cheers
- Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
- Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
- Q:Please write in days, hours, weeks, etc.I need math help!!!!
- If it takes 7*60 + 11 = 431 seconds to make 1 crane, then making one million would take 431,000,000 seconds. There are 3600s*24hr*365.25d = 31,557,600 seconds in an average year. Dividing 431 million by this gives a little over 13 years, with a remainder of 20,751,200 seconds. There are 3600*24*30 = 2,592,000 seconds in an average month. So that gives 8 months with a remainder of 15,200 seconds. There are 3600 seconds in an hour, so that gives 4 hours plus 800 seconds. The 800 seconds = 60*13 + 20 = 13 minutes, 20 seconds. This works out to 13 years, 8 months, 4 hours, 13 minutes, and 20 seconds. Though answers can vary depending on how many days you define to be in a year, and how many days in a month.
- Q:Recently a pair of Demoiselle Crane had a chick, it was al healthy right from the very beginning, its parents used to feed him/her a regular diet which usually consisted of insects and worms, it is almost a 30 days old however since yesterday he is not standing or walking on its own legs but just sitting on the knees
- Your baby crane might have stepped on something, But this is nothing like malnutrition, From what ive learned the crane may have a joint dysfunction in the knee but this very common in cranes, I really think you should take an X-ray of the cranes legs because,(and the baby cranes feet will expand over time) This could get worse. This is more than likely a leg dysfunction. Hope this helps.
- Q:I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
- There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Quality Guaranteed Meida Self Raising 6 Tons QTZ 5013 Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords