• QTZ63(5610A) tower crane System 1
  • QTZ63(5610A) tower crane System 2
  • QTZ63(5610A) tower crane System 3
  • QTZ63(5610A) tower crane System 4
QTZ63(5610A) tower crane

QTZ63(5610A) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5610A) tower crane is novel hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q: I need step by step information on how to make a paper crane.
An okorder /d
Q: How does a person go about becoming a Gantry Crane Operator? And what is it like?
First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
Q: how can we minimize energy losses of a crane to reduce the impact on the environment?
No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
Q: Can someone tell me the difference betweem safe working load and capacity of a crane?If possible, please provide reference along with tour answer.thanks for the help!!!
What sort of crane? If it is an industrial crane in a factory, the maximum rating for the crane is always lower than the true maximum to allow for a safety cushion. If the crane states it cane lift say 1 ton, it can safely lift 2000lbs. It will lift up to 2300 lbs if needed though.
Q: How many meters is the tower crane installed on the edge of the deep foundation pit?
If you set the tower crane foundation in the foundation pit, which is based on another piling, the general is to help the wall of the tower crane (unless your project in the free height under it), so far away from the foundation by the wall distance set.The two tower cranes are all supported by piles and steel lattice columns in the foundation pit. The distance is determined by the distance between the outer edge of the main structure and the supporting wall.
Q: My hubby just passed his crane test yesterday, and I was wondering how much they pay? He was told to ask for 50k a year..that includes crane time where he works. Can we really ask that? He sets trusses for a big lumber company in Missoula Mt. Any help would be great.
The little that I do know is that it's one of the most dangerous jobs in the construction field including working around them...so it easily pays that much...
Q: Today, my boyfriend surprised me with an origami bird he'd made for me the night before, just for no reason. He told me he'd tried to make a crane but it got to be to complicated. I thought an was an incredibly sweet gesture, and I thanked him thoroughly. I was wondering if it would be nice to give him an origami something back? I found a really easy video on how to make cranes and I made one, but I don't want it to seem like I'm trying to show him up, I just want to show my gratitude. Would it be best to give him the crane, give him a different origami animal, or just let the whole thing go? Sorry if it seems like I'm over thinking this, I just really like him :)
let the whole origami thing be his thing big mistake to give him the crane
Q: for example: erection, technical data...
Well now Slartybardfast may be tried lol but he is correct give him the points lol.
Q: My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
Q: In Catching Fire Katniss hangs a dummy with the words Seneca Crane on it. Who is that? It sounds familiar...
okay, i was just wondering the same thing! seneca crane is the previous head gamemaker that didnt kill katniss peeta after the 'berry' incident. u can refer back to page 20 in chapter 2! go ahead check it out. okay, gotta go do some more reading!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords