• Plastic Formwork System - Wall Formwork System 1
Plastic Formwork System - Wall Formwork

Plastic Formwork System - Wall Formwork

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plastic Formwork System - Wall Formwork

Using modular formwork, it is possible to pour up to 40cm thick and 3 meters high straight walls one time. Combining with special corners and compensation panels, right angle walls, three way T-walls and four way cross walls can be formed easily. The low weight and modularity of modular formwork makes it ideal for fence walls as it is possible to move large gang-forms by hand.

light weight, high strength

The material of modular formwork is PP (polypropylene) mixed with special glass fibers which enable panels to hold high pressures.

The handles are made by high strength Nylon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 40cm walls.




product name

Modular formwork

origin

China

color

Black

material

PP

weight

11kg

tensile strength

40KN

reusable

100 times

Please send your project design drawing in Auto-CAD file to us, we will help to make formwork solution for you.


Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
With PVC board and steel ceiling of the board on it, to the hardware store to buy
Q:Types of building templates? What is the water template?
The type of template, according to the material to wood template, steel formwork, bamboo template, Gangmu combination template, etc.
Q:Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
Solid can use foam technology to save costs, there is a hollow drawback in the use of the process, in the corner when the nail easily broken.
Q:I heard that there are building aluminum template and plastic template it? Which is better?
Aluminum alloy template construction is convenient, high efficiency: aluminum alloy building template system assembly is simple, convenient, average weight 30KG / m2, completely assembled by the artificial, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer Easy to install), skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold workers only need to install wood workers 70-80%, and do not need skilled workers, just install Before the construction of the staff can be a simple training can be).
Q:Plastic building template made of what material
Template template, as the name implies, is a model (you can think so), and the building template is in the construction of the project, before making the actual product, according to the design pattern, according to the data, such as component dimensions and other related ghosts , To produce a model consistent with the design specifications, and the production of this model is the template material
Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Plastic building template to be extended when the expansion joints: As the plastic building template than the steel mold, wood mold thermal expansion coefficient larger, morning and evening laying plastic template must be reserved for about 2 mm expansion joints (according to the size of the day the temperature difference ), No need to reserve the expansion of the slit at noon. The length of the nail is generally 1.5 inches to 2 inches is appropriate, not too long or too short.
Q:What is the economic benefits of building wood formwork compared to plastic molds?
The quality of the template is related to the quality of concrete engineering. The key lies in the accurate size, the assembly is firm, the patchwork is tight and the assembly and disassembly is convenient. Should be based on the structure of the form and characteristics of the appropriate form of template, in order to achieve good technical and economic results.
Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
The reason why the use of the template is to use the template template is the accuracy of the template, that is, after the mold can be set to ensure that the finished product finished shape regular, flush. While the plastic film version is not damaged, the completion can achieve this requirement. But the crux of the problem is that the biggest weakness of the plastic film is too brittle. Those who have done the work know that when the demolition of the template, the workers removed the template directly down to throw. And this throw to lead to the plastic film version of the broken, it is very difficult to film in the film. This is also the reason why the plastic film from the interview more than 10 years can not always develop the root causes. And then plastic film board in the mold when it is very strenuous, must drill with a drill, or can not die, not convenient construction. This is also a plastic film version can not become a mainstream template and a fatal weakness. The third weakness is its flammability. Construction site of the steel connections are required welding, welding flowers gradually to the plastic film board, at least in its surface to form a deep pit (or even lead to fire), a direct impact on the finished product surface finish and flatness.
Q:How does the concrete on the plastic template remove (already glued to the concrete)
Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
You can do that kind of ah! Raw materials are not easy to find

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords