• Plastic Formwork System - Column Formwork System 1
Plastic Formwork System - Column Formwork

Plastic Formwork System - Column Formwork

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plastic Formwork System - Column Formwork

The column panels are interconnected using the standard nylon locking handles. Each panel will require 9 handles. The forming face has 6 parallel rows of fixing holes to allow the orthogonal connection of the panels in a “star” shape. The rows are placed at a distance of 100/50mm the one from the other, allowing the forming of square and/or rectangular columns with side of 150 to 600mm.

light weight, high strength

The material of modular formwork is PP (polypropylene) mixed with special glass fibers which enable panels to hold high pressures.

The handles are made by high strength Nylon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 40cm walls.


product name

Modular formwork

origin

China

color

Black

material

PP

weight

11kg

tensile strength

40KN

reusable

100 times

Please send your project design drawing in Auto-CAD file to us, we will help to make formwork solution for you.

Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
Personally feel that PVC sheet deformation has more reasons. The main reasons are as follows.Pvc plate deformation are: physical deformation and chemical deformation.1. Physical deformation, cause:High temperature lead to deformation, if it is such a deformation, targeted plastic raw materials for high temperature modification, can effectively improve such problems. Improper textile lead to deformation, such deformation has two reasons, a plate of raw materials can not meet the actual requirements of the product requirements, re-deployment of raw materials formula to meet the actual requirements of the product can be. Second, the processing and storage methods are not correct, leading to deformation, such problems can solve the problem from the root causes.2. Chemical deformation: mainly the molecular structure of raw materials change.
Q:The price of raw materials can say better, is the PVC material.
General templates are fixed specifications, such as 1.22 * 2.44,980 * 2200 so it is generally in accordance with each template to price
Q:I heard that plastic construction template workers do not want to use, there is such a situation
The quality of the building template is relatively strong, compared to the cost is also higher. hope this helps!
Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
Plastic building template is an energy-saving and green products, is following the wood template, the combination of steel formwork, bamboo glued template, all the steel template after another new generation of products. Can completely replace the traditional steel formwork, wood template, square wood, energy saving and environmental protection, amortization cost is low.
Q:Types of building templates? What is the water template?
Building a template, the use of rear surface roughness is better, do not need to deal with the second. Provincial workers, time-saving.
Q:Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
Solid can use foam technology to save costs, there is a hollow drawback in the use of the process, in the corner when the nail easily broken.
Q:I heard that there are building aluminum template and plastic template it? Which is better?
Aluminum alloy template construction is convenient, high efficiency: aluminum alloy building template system assembly is simple, convenient, average weight 30KG / m2, completely assembled by the artificial, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer Easy to install), skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold workers only need to install wood workers 70-80%, and do not need skilled workers, just install Before the construction of the staff can be a simple training can be).
Q:Why the floor is not plastic building materials square wood and template
Must be strong and durable, the environment is bad, need to find strong
Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Should not be less than 160mm, and should not be less than the floor of the high 1/20; bottom reinforced parts of the wall thickness of not less than 200mm, and should not be less than the floor of the high 16/1. Hope to be helpful to you.
Q:What is the economic benefits of building wood formwork compared to plastic molds?
In summary, what template to use depends on what your structure needs.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords