• EANTE Square wall formwork System 1
  • EANTE Square wall formwork System 2
  • EANTE Square wall formwork System 3
  • EANTE Square wall formwork System 4
EANTE Square wall formwork

EANTE Square wall formwork

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Haiyuan New Material possesses china’s first fully automatic long fiber reinforced thermoplastic composite mould pressing production line with independent intellectual property, referred to as LFT-D line.

Why we developed EANTE formwork?

Superiority:

General worker can assemble and remove easily, save more labor cost.

The reinforcing ribs of EANTE formwork can be used to instead of the steel tube and wood.
Preassemble the EANTE formwork in the factory and fix it in the construction location.
The size accuracy of the composite formwork is better than that of the steel formwork and the wooden formwork.The concrete surface cast by EANTE Formwork is quite smooth, without any flaw, and no release agent is appliedto assist the formwork removing.

We developed our own software with the characteristics as follow:

a. Computation time: it depends on the complexity of the architecture drawing;

b. Construction drawing: it is shifted from assembling drawing easily;

c. Material list: the assembling designing software would generate a list of formwork elements and auxiliary products.

Enviromental:  EANTE Formwork is made from composite material, which is low carbon, recyclable and environmentfriendly.

Saftness: The labor, large equipment, electric saws and iron nails are used much less on the building site, which leads to simplified on-site management and the safer construction.


Q: Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
Solid can use foam technology to save costs, there is a hollow drawback in the use of the process, in the corner when the nail easily broken.
Q: I am a novice, do this product development, and now design a set of products, and now take the product to open the mold, it is not clear what kind of material template selection! Please advise experts who look
You do not explain your product is to open a metal mold or plastic mold, the two mold materials are not the same! I do plastic mold, we mainly use the factory S136 quenching material as a mold material, the slider generally use 718. And you also have the output of the product requirements of the mold, the production will choose a better point of the material.
Q: Why the floor is not plastic building materials square wood and template
Not people do not have this product is not humane is not perfect not to buy only to be used to solve the trouble of the workers with the boss's doubts
Q: Who used it, how not universal.
Strong plastic PP plastic template is a joint development of the company's patented product, is the national high-tech industrialization in 2000 to promote the project. The product is based on polypropylene, adding GF fiber, anti-aging additives made of a kind of engineering plastics. Is a plastic generation of steel (bamboo, wood) a new generation of building templates.
Q: Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
Plastic template this line, and now China is not perfect, may reach less than 30-50 this requirement, but better than the wood template, fire requirements should be able to achieve.
Q: Europe and the United States national construction template is made of plastic or wood
Although the problem is not understand the landlord can not help.
Q: Plastic mold dynamic template, the size of the template
Bigger than the fixed model on the line, a good folder folder.
Q: How does the concrete on the plastic template remove (already glued to the concrete)
Water, washed with water, rubbing with things, spend time slowly removed
Q: I heard that plastic construction template workers do not want to use, there is such a situation
Are generally wood board, plastic with less
Q: Plastic building template where there is an urgent need to solve
First, smooth and smooth. Temporarily stitching the stencil, the surface quality of the concrete structure after the demolding, the finish are more than the technical requirements of the existing water template, no need to plaster twice, the province of materials.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords