tie rod spacer washers for formwork
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
tie rod washers spacer
Specifications
1. good seal, not leak concrete
2. sustainable and enviroment friendly
3. reusable
4. eco-friendly
5. easy operation
Product Description
Tie rod, washers and spacers are the accessory for formwork system. Tie rod always used with washers, put tie rod through two formwork panels, and fasten by washers, this way to
strength the formwork system. The spacers used to provent the concrete leak thus make it easy to dismental the tie rod and washers, and then the tie rod and washers can be reused
hundreds of times.
Concept
We are the professional supplier of formwork, scaffolding, couplers, prop, etc. As the leading supplier of modular formwork in North East China, we endeavour to help you build faster and conveniently, and most important, guarantee the safety for workers. We also endeavour to protect environment because we only have one earth.
Thanks to our credibility and high quality products, we have built long term cooperation relationship with many world class enterprises such as Saudi Arabia ATCO group, Russia Sakhalin Energy Investment Company, Italy Geoplast Company, etc.
Product Characteristics
product name | tie rod/washers/spacer |
origin | China |
color | Black/yellow |
material | nylon/steel |
weight | 0.5kg |
tensile strength | 40KN |
brand | BOFU |
reusable | 1000 times |
model | CPANE0120 |
Product Introduction
Handier
The tie rod can be cut any length as customer like, generally 3m/pcs. One washers weight only 0.5kg, spacers can be cut as wall thickness.
easy set up
When using this system, just put through the tie rod to the formwork panels, and fasten it by washers, spacers cover the tie rod to prevent the concrete.
- Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
- The lower the density of the foam board is easier to deform.Crust foam can be changed to coextrusion foam. General cross-linking or blending halogenation and other methods to improve Vicat. Reduce traction override
- Q:The price of raw materials can say better, is the PVC material.
- Templates in accordance with the different prices of materials are also very different. The general plywood is 50-65 / sheet.
- Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
- The main advantages are:1, the surface smooth and smooth, high strength, the provincial workers, the expected material, can meet the requirements of clear water concrete template, after stripping without cleaning the surface of the template, thus saving a lot of labor, template flatness can be controlled within 0.3mm, thickness uniformity, Can be controlled within ± 0.3mm, wood than the wood to save 2/3 of the nails.2, good water resistance, toughness, long-term immersion is not layered, water swelling rate of less than 0.06%, in -30 ℃ _ +60 ℃ range of normal use, the use of 6 years of aging of 15%, normal use of 8 Years or more.3, plasticity, according to the design and component size requirements, processing and production of different shapes and different specifications of the template, a curvature of the template for the production of a more simple template can be drilling nails, saws, planing and other wood mold with the same machinability , On-site stitching simple and convenient.4, recyclable use, plastic template to a certain extent can be fully recycled, regardless of the size of the old and new, after processing, can be added to produce a new template
- Q:Plastic building template where there is an urgent need to solve
- First, smooth and smooth. Temporarily stitching the stencil, the surface quality of the concrete structure after the demolding, the finish are more than the technical requirements of the existing water template, no need to plaster twice, the province of materials.
- Q:Types of building templates? What is the water template?
- Building a template, the use of rear surface roughness is better, do not need to deal with the second. Provincial workers, time-saving.
- Q:Want to purchase a number of building templates and found a new plastic building template, do not know how the quality?
- Plastic construction template is the disadvantage of airtight and non-absorbent, in the mold, the wall will blister, can not meet the construction requirements, especially high-rise buildings, repeated use after a few times can no longer use. At present, a large number of domestic or wood template.
- Q:I heard that there are building aluminum template and plastic template it? Which is better?
- Aluminum alloy template construction is convenient, high efficiency: aluminum alloy building template system assembly is simple, convenient, average weight 30KG / m2, completely assembled by the artificial, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer Easy to install), skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold workers only need to install wood workers 70-80%, and do not need skilled workers, just install Before the construction of the staff can be a simple training can be).
- Q:What is the economic benefits of building wood formwork compared to plastic molds?
- In summary, what template to use depends on what your structure needs.
- Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
- The reason why the use of the template is to use the template template is the accuracy of the template, that is, after the mold can be set to ensure that the finished product finished shape regular, flush. While the plastic film version is not damaged, the completion can achieve this requirement. But the crux of the problem is that the biggest weakness of the plastic film is too brittle. Those who have done the work know that when the demolition of the template, the workers removed the template directly down to throw. And this throw to lead to the plastic film version of the broken, it is very difficult to film in the film. This is also the reason why the plastic film from the interview more than 10 years can not always develop the root causes. And then plastic film board in the mold when it is very strenuous, must drill with a drill, or can not die, not convenient construction. This is also a plastic film version can not become a mainstream template and a fatal weakness. The third weakness is its flammability. Construction site of the steel connections are required welding, welding flowers gradually to the plastic film board, at least in its surface to form a deep pit (or even lead to fire), a direct impact on the finished product surface finish and flatness.
- Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
- You can do that kind of ah! Raw materials are not easy to find
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
tie rod spacer washers for formwork
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords