• Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp System 1
  • Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp System 2
  • Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp System 3
  • Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp System 4
  • Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp System 5
Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp

Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1800 m³
Supply Capability:
100000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp

Developing with new technology materials, steel formworks is no longer a must in construction concrete process. More and more buildings are established with plastic formworks. And workers love this new formworks much more.

The advantages of plastic formworks:

1.First of all--light

Yes it is the first advantage of plastic formwork. It wins the great praise of both contractors and workers.

The biggest panel is 120×1500px,weights 10.5kg only. It can be lift and set up by one person easily, which means there is no need for cranes on site.Saves a lot of cost and time.

2.Easy set up

Different size of panels can firmly locked by simply turn the special handles to 90 degree. The Panels has rib on the back, which makes the system need not traditional wood blocks and nails. The panels have holes to fit tie rod, guarantee the strength of the whole system.

3.Modularity

Modular formworks composed by different size of panels,the main item is 120×1500px panel,which is used for the large area of walls and slabs. There are also small size of panels like 10×1500px,20×1500pxcm,25×1500px,inner corner 20×20×1500px and outer corner 10×5×1500px.Due to the variety of panel size, the system can form almost all size walls 120×1500px panel of multiply by 125px. The material of modular formwork is PC-ABS mixed with special glass fibers which enable panels to hold high pressures.

4.Strength

The handles are made by high strength Nilon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 1000px walls.

5.Environment friendly

The system needs no cut and nail due to the variety size. Also it needs nearly no wood. The material can be recycled after broken, so it will not pollute the environment.

6.Consequent

Concrete does not stick to plastic formwork, thus the panels need no oil before using, and can be cleaned simply by water. The surface of the wall which build by modular formwork is smooth and without rework.


Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp

Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp

Plastic Formwork Concrete Formwork Scaffolding Prices Coupler Scaffolding Clamp


Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Stable and durable thanks to its structual design & automatic welding quality

* Customized solution helps you work safe, save cost and convenient

* Excellent quality for formwork & scaffolding with wide choices

 

Packing

in bulk or in bundle, or as requested

Shipping

   15-20 Days.

Normally small orders, it needs just 15-20 business days to the port. For goods with stock, it would be even shoter.

 

Other scaffolding & formwork products:

(1)   Scaffolding System:

(2)   Scaffolding Frame & Accessories:

(3)   Scaffolding Couplers/Clamps:

(4)   Formwork System Scaffolding & Accessories:

Q: I am a novice, do this product development, and now design a set of products, and now take the product to open the mold, it is not clear what kind of material template selection! Please advise experts who look
You do not explain your product is to open a metal mold or plastic mold, the two mold materials are not the same! I do plastic mold, we mainly use the factory S136 quenching material as a mold material, the slider generally use 718. And you also have the output of the product requirements of the mold, the production will choose a better point of the material.
Q: Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
The reason why the use of the template is to use the template template is the accuracy of the template, that is, after the mold can be set to ensure that the finished product finished shape regular, flush. While the plastic film version is not damaged, the completion can achieve this requirement. But the crux of the problem is that the biggest weakness of the plastic film is too brittle. Those who have done the work know that when the demolition of the template, the workers removed the template directly down to throw. And this throw to lead to the plastic film version of the broken, it is very difficult to film in the film. This is also the reason why the plastic film from the interview more than 10 years can not always develop the root causes. And then plastic film board in the mold when it is very strenuous, must drill with a drill, or can not die, not convenient construction. This is also a plastic film version can not become a mainstream template and a fatal weakness. The third weakness is its flammability. Construction site of the steel connections are required welding, welding flowers gradually to the plastic film board, at least in its surface to form a deep pit (or even lead to fire), a direct impact on the finished product surface finish and flatness.
Q: Want to purchase a number of building templates and found a new plastic building template, do not know how the quality?
To be honest, not very good. The Temporary use can be
Q: Plastic mold dynamic template, the size of the template
Bigger than the fixed model on the line, a good folder folder.
Q: How does the concrete on the plastic template remove (already glued to the concrete)
With pliers slowly pull, or spray gun spray.
Q: Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
Hardware stores have, any one hardware store can buy, you can buy the nearest.
Q: I heard that plastic construction template workers do not want to use, there is such a situation
The quality of the building template is relatively strong, compared to the cost is also higher. hope this helps!
Q: Plastic building template where there is an urgent need to solve
Plastic construction template turnover can reach more than 30 times, but also recycling. Temperature to adapt to a large range of specifications adaptability, can be saw, drill, easy to use. Temporal surface of the template, smoothness than the existing technical requirements of the water concrete template, a flame retardant, anti-corrosion, anti-water and anti-chemical corrosion function, have better mechanical properties and electrical insulation properties. Can meet a variety of cuboid, cube, L-shaped, U-shaped building support model requirements.
Q: The price of raw materials can say better, is the PVC material.
Usually in square meters. But whether by square meters or by weight count, but the process is different, but the results will be the same unit price. Off to know how much the cost of this product, how much profit. The cost of each product produced by the factory are not necessarily, of course, the profit is not the same. Cost is the material, management, plant rent, utilities, machine depreciation and other costs together, and now PVC materials have different grades, the specific price can be found on the Internet to see.
Q: Shear wall plastic template for the wall height and thick ratio requirements is how much?
Shear wall plastic template support: the wall height of 2800, wall thickness 300, for example, using 12mm template, vertical sub-rib spacing (center distance) for the 200-250mm; 15mm template, vertical sub-Leng spacing (center distance) For 250-300mm. Compared with the normal use of bamboo plywood template, the distance between the second time, the roughness of the concrete surface is basically the same, but the concrete surface smooth, to achieve the effect of water concrete, perception quality is better. To meet the requirements of cast-in-place concrete wall forming and surface quality. Construction template structure should be simple, light weight, durable, easy to manufacture.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords