Kwikstage Scaffold Internal Corner Frame
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Surface: | Height: | |||
Pipe Size: | Accessories: | Lock Pin Size: | |||
Style: | Plate: | Certification: |
Packaging & Delivery
Packaging Detail: | Bundle packing, suitable for sea transfer. |
Delivery Detail: | Prompt |
Specifications
H frame scaffolding system
size: Tailor Mading
Height: 1219mm,1700mm,1930mm
Manufacturer
Best price and service
Q235 frame scaffolding
H frame scaffolding system is for small to medium sized projects, including small or medium sized new build, maintenance, roofing, painting and cladding. They are time efficient, safe and stable.
1.Material:Q235 Q255 Q345
2.Variety:Walk through type & Ladder type
3.Type: H frame scaffolding system
4.Thickness of the tube:3mm 3.2mm 3.25mm 3.5mm 4mm or customize
5.Surface treatment:HDG/Galvanized/Painted,ect.
6.Color:silver, red, blue, yellow, green or customize
7.Certificate:ISO9001:2000 ISO9001:2008
8.Standard:EN74 BS1139 AS1576
9.Advantage:easy erection, strong loading capacity, safety and stability
10.Main components: frame, catwalk, joint pin, cross brace, base jack, u-head jack and caster.
11.Usage: Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc
frame scaffolding is light duty, easy to erect and walk through, wide applications for both inside and outside constructions.
A complete set usually includes 2 PCS of H frames, 2 pairs of cross braces and 4 PCS of joint pins.
Components:
Pre-galvanized tube, Joint Pin, Lock Pin, Cross Brace, Base Jack or Universal Wheel.
STD/ Ledger(P.G.)mm | Size (mm) | KG | STD/ Ledger(H.D.G.)mm | Size (mm) | kg |
Φ42*2.2/Φ42*2.0 | 1930*1219 | 15.05 | Φ42*2.2/Φ42*2 | 1930*1219 | 15.05 |
Φ42*2.0/Φ42*2.0 | 1930*1219 | 14.33 | Φ42*2/Φ42*2 | 1930*1219 | 14.33 |
Φ42*2.1/Φ42*2 | 1930*1219 | 14.43 | Φ42*2.1/Φ42*2 | 1930*1219 | 14.43 |
Φ42*2.2/Φ42*2 | 1700*1219 | 13.51 | Φ42*2.2/Φ42*2 | 1700*1219 | 13.51 |
Φ42*2/Φ42*2 | 1700*1219 | 12.88 | Φ42*2/Φ42*2 | 1700*1219 | 12.88 |
Φ42*2.1/Φ42*2 | 1700*1219 | 13.20 | Φ42*2.1/Φ42*2 | 1700*1219 | 13.20 |
Φ42*2.2/Φ42*2 | 1524*1219 | 12.21 | Φ42*2.2/Φ42*2 | 1524*1219 | 12.21 |
Φ42*2/Φ42*2 | 1524*1219 | 11.64 | Φ42*2/Φ42*2 | 1524*1219 | 11.64 |
Φ42*2.1/Φ42*2 | 1524*1219 | 12.00 | Φ42*2.1/Φ42*2 | 1524*1219 | 12.00 |
Φ42*2.2/Φ42*2 | 914*1219 | 9.56 | Φ42*2.2/Φ42*2 | 914*1219 | 9.56 |
Φ42*2.2/Φ42*2 | 1930**914 | 14.19 | Φ42*2.2/Φ42*2 | 1930*914 | 14.19 |
Φ42*2/Φ42*2 | 1930**914 | 13.47 | Φ42*2/Φ42*2 | 1930*914 | 13.47 |
Φ42*2.2/Φ42*2 | 1700*914 | 12.65 | Φ42*2.2/Φ42*2 | 1700*914 | 12.65 |
Φ42*2/Φ42*2 | 1700*914 | 12.02 | Φ42*2/Φ42*2 | 1700*914 | 12.02 |
Φ42*2.2/Φ42*2 | 1524*914 | 11.60 | Φ42*2.2/Φ42*2 | 1524*914 | 11.60 |
Φ42*2/Φ42*2 | 1524*914 | 11.03 | Φ42*2/Φ42*2 | 1524*914 | 11.03 |
- Q: A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 200 N and is 3.00 m long. What is the tension in each rope when the 700 N worker stands 1.00 m from one end?Please help me.
- Draw the picture ie Free Body Diagram ALWAYS!! Sum Fx = 0 Sum Fy = 0 Sum Moments = 0 Take moments about one end. I choose the left end and put the window washer 1 m from the left end.====> Tension in left rope goes through the left end ==> lever arm has length=0 ===> moment from left rope = 0 Moment from window washer: 1 m * 700 N = 700 N-m clockwise Moment from weight of scaffold: 1.5 m * 200 N = 300 N-m clockwise (Center of gravity in center of scaffold) Your question says 190 N your question statement says 200 N. NOTE I solved for 200 N Total clockwise moment 700 + 300 = 1000 N-m CW Right rope must supply that Lever arm = 3 m * 1000 N-m = 3m * T T = 333.33 N UP Total force down = 200 + 700 = 900 N ===> Tension in left rope: 900 - 333.33 = 566.67 N
- Q: What are the specific safety rules for mobile scaffolding
- (3) the use of mobile scaffolding venues, the four corners must be smooth, more than three floors to fasten the seat belt.(4) the material, tools and sundries on the scaffold shall be removed before dismantling the scaffold.
- Q: When I got my piercing done there was quite alot of blood, it was caked into my hair and all over my ear, I went home and cleaned it up with cotton buds and then went out. When I woke up this morning there was so much blood all in my hair and on my ear so i'm pretty worried. Is this normal? Some of it even looked like little bloodclots.
- Wow that didn't happen to me when I got it. But we are all different so....
- Q: is healing easier with one long bar or two short bars?i ask this because mine was pierced with one long ptfe bar in july last year and i've had nothing but pain, lumps, crust and blood for the last ten months. would it help to change to two small bars or is it too late for me? :)
- it is supposed to be healed with two rings. but a lot of piercers dont do this, i had mine pierced and the jewelry used for it to heal was a long barbell. how are you cleaning it?
- Q: I've had it for 3 months, and a keloid has just formed. I was told to put hydrogen peroxide on it with the regular 2x salt and hot water a day... but the piercing keeps healing and scabbing over the bar (inside), and i need to twist it so it doesn't get stuck.it is SO painful and happens after like 5 minutes of twisting the bar.I can't stand the pain anymore, is there any way to prevent this?
- go buy a new bar, or go to where you got it pierced to get exact details on what you should be doing. If nothing else, take it out
- Q: I had it done yesterday and it's still burning like hell. I also had both tragus' and a helix at the same time, sleeping is the worst thing ever... When will the constant pain stop? How long will it take for it to become unnoticable like all my other piercings?Any ideas/tips to ease the pain? I do rock salt soaks twice a day for 10 mins each which helps a little...
- Unfortunately, a scaffolding piercing can take a lot longer for the pain to stop. It may take a few weeks before you can sleep on it comfortably, but by then it should be okay just normally (e.g. when not resting on it.) I'm not sure how to ease the pain really, I just put up with it. xD I'm not sure if rock salt is the same as sea salt? But if so, keep that up as you are.
- Q: For fixing the election with Russia.
- The only one who would be thought of committing treason is Hillary. But don't worry, she's not the next president.
- Q: I have just returned from Budapest and was amazed to see that a lot of the scaffolding used there is made of wood and not metal . The construction itself is wonderful and almost an artwork but I cannot see any advantage in using the wood which will rot in time.
- Countries such as Budapest usualy don't have the industrial capibility of other countries that do use metal scaffolding.
- Q: I have a converted attic bedroom and the part where the wall meets the ceiling over the stairs is unreachable without scaffolding. It's over stairs so you can't just put a ladder under it. I hired someone to paint it the current color, but I will probably need to re-paint it soon and I am hoping to be able to rent something that I can adjust the legs to put on stairs that I can paint it myself. Any advice would be helpful
- Lowes Scaffolding
- Q: In the book The Scarlet Letter, does the scaffold have the same meaning in each scene?
- yes and no, When Hester stands on the scaffolding, its a forced punishment for committing adultery. and when Dimmesdale stands on it, it on his own because he feels guilty for doing this to Hester (giving her a child and her being shamed by the town)
Send your message to us
Kwikstage Scaffold Internal Corner Frame
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords