• Kwikstage Scaffolding System-Toe Board Bracket CNBM System 1
  • Kwikstage Scaffolding System-Toe Board Bracket CNBM System 2
Kwikstage Scaffolding System-Toe Board Bracket CNBM

Kwikstage Scaffolding System-Toe Board Bracket CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: KS-TBB

  • Material: Steel

  • Surface: Galvanized/Paint

  • Type: Toe board bracket

Kwikstage Scaffolding System-Toe Board Bracket CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Features:

Model No: RS-H-I

Model Name: Ringlock Scaffolding System-Removable Interior Stair handrail

1) Dimensions (Lx H): 2250x 628mm

2) Made of steel

3) Weight: 13kg

4) Special Used in ringlock and facade scaffold systems
5) Surface: hot dipped galvanized

4.The specification componant parts of Steel Ringlock Scaffolding Ledger 

Ring   Lock System Scaffold Ledger / Horizontals

Model

Description

Weight(kg)

Weight(lbs)

AR.L.3050

Ring Lock Ledger 3050mm (10')

11.66

25.74

AR.L.2745

Ring Lock Ledger 2745mm (9')

10.57

26.74

AR.L.2440

Ring Lock Ledger 2440mm (8')

9.47

20.88

AR.L.2130

Ring Lock Ledger 2130mm (7')

8.36

18.43

AR.L.1830

Ring Lock Ledger 1830mm (6')

7.28

16.06

AR.L.1520

Ring Lock Ledger 1520mm (5')

6.17

13.61

AR.L.1220

Ring Lock Ledger 1220mm (4')

5.10

11.24

AR.L.1150

Ring Lock Ledger 1150mm (3'10")

4.84

10.68

AR.L.1065

Ring Lock Ledger 1065mm (3'6")

4.54

10.01

AR.L.910

Ring Lock Ledger 910mm (3')

3.98

8.78

AR.L.650

Ring Lock Ledger 650mm (2'2")

3.05

6.73

AR.L.610

Ring Lock Ledger 610mm (2')

2.91

6.41

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:I'm wanting a scaffold piercing so i can wear it with a bar or 2 rings. Could i get it PIERCED with the 2 rings to begin with or do i have to have a bar for the first few weeks/months?
My friend wanted the same thing done so she asked the piercer and he pierced one side of her top ear first and a week later she went back and got the other side pierced. She got used to the rings being in for 2 weeks and then put a bar in. Beware though as the bar that is put into your ear can make your skin grow around it, I still have two lumps on my ear from where the piercing went dodgy and so has my friend. I want it done again though! :)
Q:Hey guys, so I got my scaffolding (ear) done yesterday. My piercer told me NOT to clean it, and that the best thing for a cartilage piercing is to quot;leave it bequot; I trust this advice, but I wanted to ask your opinion or methods that worked for you :) Thanks lt;3
nonono, industrials or notorious for infections. if you don't clean it, imagine how much bacteria is going to be near it since all the folds of the ear and the oils or your hair. I clean my industrial at least twice daily, and I have yet to get an infection though. What I do is Sea Salt Soaks in the morning and night. I put a little emu oil to advoid hypertrophic scarring. and I have kept my hair up every day since getting it pierced to make sure my hair doesn't irritate it while its still in its early healing phase.
Q:Tell me how much the shear strength can reach MPa, thank you
The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
Q:How many kinds of wheel buckle scaffolding and adjustable wire base and support?
5, the horizontal bar step using 160cm. (20+3 * 160=500 50 left sweeping bar for jacking cantilever length, right)6, set the wall and box culvert wall connection point, height of 3.40 meters, each one of the three vertical pole distance, no scissors.According to this structure, the landlord to calculate their own, very simple.
Q:The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
Assuming that the web is N, the calculated load is P=1.2*N+1.4*n (n)That support is a layer of a layer of wood longitudinal transverseThen calculate vertical
Q:Cuplock scaffolding pole bearing capacity in which can be found? Read a lot of calculations are said to check, but also a lot of difference calculated
As the specification does not load specific value, but there is method and calculation of the standard on some structural load those requirements.
Q:An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:is scaffolding a trade that i could emigrate to australia with?
I'm not sure about the immigration regulations, but there's plenty of work for scaffolders, riggers, plant operators etc. Good money too! (maybe look at an allied trade to mark in the box on the forms, as there's definately a skill shortage in Oz.)
Q:And how long do you have to keep it on? Any other knowledge I should know?
8 - 16 weeks - healing time. But with some people it can be alot longer! Clean 3 - 4 times a day. Try cleaning with a mix of tea tree oil and water! It doesn't hurt much :)
Q:Bridge template support bowl button steel scaffolding, you need to set the sweeping rod
Sweeping rod: part of the scaffolding works, sweeping rod distance from the ground 200mm, connecting the vertical pole of the horizontal rod. Divided into vertical and horizontal sweep rod, play the role of scaffolding stability.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords