• HOT SALINGS CUP LOCK SCAFFOLDING FOR HIGH-RISE BUILDING System 1
  • HOT SALINGS CUP LOCK SCAFFOLDING FOR HIGH-RISE BUILDING System 2
HOT SALINGS CUP LOCK SCAFFOLDING FOR HIGH-RISE BUILDING

HOT SALINGS CUP LOCK SCAFFOLDING FOR HIGH-RISE BUILDING

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
22000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1)HOT SALINGS CUP LOCK SCAFFOLDING

 

2)Material:Q235,Q345


3)Features:Welding by Robot


4)Surface:HDG,OR PAINTED

 

Size For Standard :    

Product Name

Specifications(mm)

Weight(kg)

Standard

3000*48*3.0

15

Standard

2400*48*3.0

12.47

Standard

1800*48*3.0

9.57

Standard

1200*48*3.0

6.66

Standard

600*48*3.0

4.67

Size For Ledger :

Product Name

Specifications(mm)

Weight(kg)

LEDGER

2400*48*3.0

8.44

LEDGER

1800*48*3.0

6.43

LEDGER

1500*48*3.0

5.43

LEDGER

1200*48*3.0

4.43

LEDGER

900*48*3.0

3.44

LEDGER

600*48*3.0

2.43

LEDGER

300*48*3.0

1.44

 

Q: Where can I find 2nd hand/brand new H frames for scaffolds in Cebu?
while commuting in Cebu, look for on going construction in the surrounding. take time to get off and ask where they get their scaffoldings, they either fabricated, bought or rented it. from there you know where to start.
Q: what should i do?? i've been washing it and leaving it to heal but im worried about it. i've had the piercing for 9 days now and i only noticed this yesterday. any ideas?
that means that was piercing wasn't done as well as it could have been. there is nothing you can do about it except take it out, let it heal, and have it re-pierced. go see your piercer. they should be able to tell you if it's a problem, and they should re-pierce it for free.
Q: Hi my next door neighbours are building an extension to their house. The builders asked if we would allow scaffolding to be placed on part of our driveway. Now, these builders are taking too long and the builders attitude is rude when questioned how long they gonna take to finnish. If we want the scaffolding to go, what righs have we got as we gave verbal permission to the builders to have it put up by scaffolders and the planned extension not yet completed?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q: ends. Bob weighs 730 N and stands 1.00 m from the left end, as shown in the figure below. Two meters from the left end is the 500 N washing equipment. Joe is 0.500 m from the right end and weighs 910 N. Given that the scaffold is in rotational and translational equilibrium, what are the forces on each cable?
Where is the figure?
Q: The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
. No nameSpecification for "template engineering construction quality acceptance specification". Template engineering construction quality acceptance requirements, in GB50204-2015 "concrete structure engineering construction quality acceptance specification".
Q: Bowl buckle scaffold can be used to support it
Look at the situation, the ground is not flat
Q: Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
its normal aii your probaly slept on it just do a sea salt soak and you'll be fine but if your super worried go back to your piercer
Q: i need help with the musical elements of these songs, such as the instrumentation, rhythm, texture, timbre and key. thanks
I would suggest you take the score (any good music library should have it) and listen to the music. That would give you all the information you need. It doesn't take THAT long.
Q: I would like to ask what is the erection of external wall scaffolding specification? What do you need to pay attention to?
Outside, scaffolding, ramps, platforms 1.05 meters fence. The laying of bamboo or wood, both ends must be secured, strictly binding is put into use. rn6, in the corridor and escalator scaffolding should be reinforced, can not impede the passage. rn7, pick scaffolding generally 1.2 meters walking distance, and to add a diagonal brace, diagonal bracing and vertical angle of not more than 30 degrees. rn8, in order to prevent the buckling of the tube tube bending buckle from the tube head, each rod is extended to the ends of the intersection are greater than 10 cm. rn9, scaffolding erection site, if there is a power line or electrical equipment, must comply with the safety distance requirements, erection and removal measures taken to stop the transmission
Q: i want to know what pole diameter (inner) would fit securely over a standard scaffolding polethanks
scaffolding takes a 1 1/4 pin to connect them together so the o.d. on the buck itself would probably be 1 1/2 in...so are you sliding over the pin or the buck itself...my medium duty scaffolding takes a 1 1/8 th in. pin...

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches