• Cup-lock Scaffolding Used for High-rise Building High Efficiency Performance System 1
  • Cup-lock Scaffolding Used for High-rise Building High Efficiency Performance System 2
  • Cup-lock Scaffolding Used for High-rise Building High Efficiency Performance System 3
  • Cup-lock Scaffolding Used for High-rise Building High Efficiency Performance System 4
Cup-lock Scaffolding Used for High-rise Building High Efficiency Performance

Cup-lock Scaffolding Used for High-rise Building High Efficiency Performance

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG 

  • Application: 

    Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

  • Safety and Steady:

  • The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.

  • Multi using:

    According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

 

Cup-lock Scaffolding Used for High-rise Building, High Efficiency Performance

 

 

Cup-lock Scaffolding Used for High-rise Building, High Efficiency Performance

Cup-lock Scaffolding Used for High-rise Building, High Efficiency Performance

 

 4. FAQ

 

 

  • How to guarantee the quality of the products?

    We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

  • Packing & Delivery

    Export standerd package or as customer's requirements.

  • Why Choose us?

    We are  the biggestmanufacturer on formwork andscaffolding accessories in China.

  • We have more than 40 years experience on manufacturing and exporting. 

  • We have the competitive price.

    We have the completed sales and service team so that we can offer the best service.

Q: Single double scaffolding distinctionPlease list the sketch map
1) a single standard steel scaffolding steel pipe. It uses only one standard, such as steel tubular scaffolding, welded steel pipe using only 48.3 * 3.5.2, a variety of specifications of steel scaffolding, which consists of more than two kinds of different specifications of the steel pipe, such as door scaffolding3) steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding. A bowl type steel tube scaffold when using steel bar when the "scaffolding" when using the single pipe; take the side of the steel bar, "steel based scaffolding".
Q: What kind of scaffolding used in engineering construction
Scaffolding is a special type of work closely related to production safety. In the design and construction of steel tubular scaffolding in the implementation of national safety production policies, to ensure the safety of construction workers, do apply advanced technology, reasonable economy, safety, it must comply with the "construction of steel tubular scaffold safety technical specifications" (JGJ 130 - 2011) requirements, the new standard by the Ministry of construction in People's Republic of China Announcement No. 902, and in 2011 - 01 - 28 - 12 - 2011 approved 01 implementation.
Q: Bowl buckle scaffold from the machine to pull out the upper and lower bowl
You can refer to the "construction of bowl buckle scaffold safety technical specifications" JGJ 166-2008
Q: I just got my scaffold piercing yesterday, (the bar through the top of your ear) and one side is kind of swelling. Is that okay, or normal?
this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
Q: Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q: Tips and advices regarding the piercing or healing process will be greatly appreciated. Thanks:)
It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
Q: I just got a scaffold piercing, Is there anything I can do to make it heal faster?
your just gonna have to wait it out it takes 6-12 months to fully heal. use sea salt and warm water solution to keep it clean that will help it heal a little quicker! just be careful i got to close to a doorjamb and now mine has a bruise its scary looking lol
Q: hi there, im looking for scaffolding, is there any one knows a well known name for this service. please hurry up.thanks
Affix okorder
Q: A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint to one side, as shown.
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q: Cost of rent per day per month per ton of scaffolding
, so it is difficult to make it clear here, to see where you are in which company rented

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches